Find or Sell Used Cars, Trucks, and SUVs in USA

1979 Chevy Blazer on 2040-cars

Year:1979 Mileage:160999
Location:

Bisbee, Arizona, United States

Bisbee, Arizona, United States
Advertising:

 1979 Blazer w/1991front, purchased in CA now in AZ, lost employment, 350/350 reliable, runs/drives good, pwr steering/brakes/windows/locks, ac (compressor not attached, included w/few spare parts) all glass good, straight body, Kenwood deck w/ 2 6x9s, rallies w/beauty rings, front seats from 91', set of  Recaros included, rear seat folds down,aluminum radiator, quiet single exhaust, all gauges work, no headliner, minor rust above windshield, reasonable reserve......j ray 520.223.3056.....thanks


Auto Services in Arizona

Yates Buick Pontiac GMC ★★★★★

Auto Repair & Service, New Car Dealers, Used Car Dealers
Address: 13845 W Test Dr, Cashion
Phone: (623) 377-9166

Valley Express Auto Repair ★★★★★

Auto Repair & Service, Automobile Inspection Stations & Services, Automobile Repairing & Service-Equipment & Supplies
Address: 629 W Broadway Rd, Guadalupe
Phone: (480) 630-1279

Unlimited Brakes & Auto Repair ★★★★★

Auto Repair & Service, Brake Repair
Address: 2027 W Glendale Ave, Glendale-Luke-Afb
Phone: (602) 246-1175

The Tin Shed Auto ★★★★★

Auto Repair & Service, Brake Repair, Automobile Salvage
Address: 6221 N 55th Ave Lot 7, Goodyear
Phone: (602) 253-2553

Son`s Automotive Svc ★★★★★

Auto Repair & Service
Address: 21632 N 7th Ave Ste 6, Youngtown
Phone: (623) 516-9165

San Martin Tire Shop ★★★★★

Auto Repair & Service, Tire Dealers
Address: 6415 N 59th Ave, Tolleson
Phone: (623) 915-0777

Auto blog

GM cutting Chevy Sonic, Buick Verano production by more than 20%

Sat, Jun 13 2015

General Motors' Orion Assembly plant in Michigan is seeing even more production cuts this year to further reduce inventories of the Chevrolet Sonic and Buick Verano. These latest adjustments mean layoffs for about 100 workers in phases starting in July. "GM Orion Assembly will adjust plant production capacity to better align with market demand," the company said in a statement announcing the change. Through May, sales of the Sonic are down 28.5 percent to 29,082 vehicles, and the Verano is off 15.6 percent, with 15,279 sold this year. According to unnamed plant insiders speaking to Automotive News, the assembly rate is slowing at Orion Assembly from the current 33 cars an hour down to 26 an hour, a 21-percent reduction. GM is also reportedly going to keep the plant idle for three weeks during the normal summer shutdown, rather than the usual two. Earlier in the year, the factory was idled for two weeks due to excess supply of the Sonic and Verano. In March, it was closed again for several days for the same reason. The Orion Assembly plant is the future home to the line for the Chevy Bolt EV. GM Statement: GM Orion Assembly will adjust plant production capacity to better align with market demand. A phased layoff of approximately 100 employees will begin in July 2015 and conclude by year-end. Related Video: News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing Buick Chevrolet GM Hatchback Sedan buick verano orion assembly

GM execs fired over fraudulent India emissions testing

Mon, 29 Jul 2013

General Motors hadn't had a recall in India since 1995. That changed when it was discovered that certain employees were playing tricks with local emissions testing in order to ensure passing grades for engines. More than ten GM Powertrain employees in India and the US have been let go over the ensuing emissions flap, including Sam Winegarden, VP of global engine engineering, a man who has been with the company since 1969, leading development of some marquee powerplants.
According to Automotive News, an internal investigation revealed that employees "violated testing procedures," sometimes swapping specially prepared low-emissions engines during testing regimes for the Chevrolet Tavera SUV equipped with the 2.0-liter and 2.5-liter engines. Employees were also manipulating weights in order to get vehicles placed into different emissions categories. The discovery has led to GM recall the 114,000 Taveras produced over an eight-year period and halting their production and sale.
The Economic Times of India reports that the issue is due to "a faulty component." GM has developed a solution to the issue, and once it is validated in testing and approved by the Indian authorities, the recalled vehicles will be fixed at dealers and production will resume.

GM adds 1,200 jobs at Detroit-Hamtramck plant

Thu, Oct 22 2015

General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.