Find or Sell Used Cars, Trucks, and SUVs in USA

1957 Chevy 150 2 Door Post Factory V8 & 4 Speed No Motor, No Trans on 2040-cars

Year:1957 Mileage:125960
Location:

Merrill, Iowa, United States

Merrill, Iowa, United States

Auto Services in Iowa

Yaw`s Auto Salvage ★★★★★

Automobile Parts & Supplies, Used & Rebuilt Auto Parts, Automobile Electrical Equipment
Address: 919 SE 21st St, Pleasant-Hill
Phone: (515) 318-7310

Yaw`s Auto Salvage ★★★★★

Automobile Parts & Supplies, Used & Rebuilt Auto Parts, Automobile Electrical Equipment
Address: 919 SE 21st St, Boone
Phone: (515) 318-7310

Sinaloa Auto Sales ★★★★★

Auto Repair & Service, New Car Dealers, Used Car Dealers
Address: 1425 E Main St, Agency
Phone: (641) 682-9555

Scotty`s Body Shop ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting, Dent Removal
Address: 59 University Ave, Carlisle
Phone: (515) 421-8105

Rick`s Auto Sales ★★★★★

New Car Dealers, Used Car Dealers, Wholesale Used Car Dealers
Address: 1945 42nd St NE, Robins
Phone: (319) 395-7777

Merfeld Brothers Automotive ★★★★★

Auto Repair & Service
Address: 1050 Century Cir, Farley
Phone: (563) 585-5000

Auto blog

GM investing $167m in Spring Hill for new midsize vehicles

Tue, 06 Aug 2013

General Motors has announced a large investment in its Spring Hill, Tennessee facility. The former home of Saturn production will be getting a $167 million addition to a previously announced $183 million, to cover a pair of new midsize vehicles. The investment is expected to create 1,800 jobs at the factory.
That $350 million is being divvied up for a pair of programs at Spring Hill. The first will take the bulk of the money ($223 million) and create 1,000 of the 1,800 jobs, while the other will take the remaining $127 million and generate the leftover 800 positions. But GM says the investment will cover "midsize vehicle programs." So what could they be?
The leading candidate in our minds is a new crossover for Buick, called the Anthem, that will slot between the Encore and Enclave, but will be slightly smaller than the Equinox and Terrain. As we've explained, the new model will likely be the first product to sport GM's new D2UX platform, which will eventually replace both the Delta and Theta platforms. Spring Hill is already building the Equinox, so there could be some credence to this theory.

GM throttles back Chevy Malibu, Buick LaCrosse production over swollen inventories

Wed, 06 Feb 2013

As inventory of the Chevrolet Malibu and Buick LaCrosse continues to pile up, General Motors will be idling its Fairfax Assembly Plant for two weeks, according to Automotive News. This move comes about a month after the plant was shut down for three weeks in late December and early January for the same reason. As of January 31, the GM had a 94-day supply of Malibu stock while the LaCrosse was a little worse with a 117-day supply.
Just last week, GM announced that it would be investing $600 million in upgrading this plant, but it's unclear what future plans the company has in store for Fairfax considering slow sales of both the plant's models. We do expect a refreshed and more luxurious LaCrosse shortly and an early design update for the Malibu to be announced at some point this year, although we have had no official word as to when either will happen.

Mysterious white powder discovered at GM Orion Assembly

Fri, Sep 2 2016

Workers at General Motors Orion Assembly Plant in Orion Township, MI uncovered a mysterious white powder in two different parts of the factory earlier this week, raising concerns about worker safety. "We can confirm that an unknown substance (white powder) was found on the floor outside of Gate 6 at Orion Assembly on Monday, August 29. On Tuesday, August 30, we had a second report of a bottle containing a similar substance found inside the plant," GM spokesperson Dayna Hart told The Oakland Press via email. GM stressed that incident didn't disrupt operations at the plant, and that the company was taking steps to ensure the safety of the sprawling factory's workers. That did include, an anonymous worker told The Oakland Press, closing off parts of the factory for two full days, as drug-sniffing dogs and crews in haz-mat suits descended on the area. "A sample of the substance has been sent to a laboratory for identification and results are expected later this week," Hart said. "All findings and actions have been shared with our employees." Orion Assembly currently builds the Chevrolet Sonic and Buick Verano, and will eventually be responsible for production of the new, all-electric Chevy Bolt early next year. Related Video: