1957 Chevrolet Bel Air on 2040-cars
Whittier, California, United States
The vehicle was found in an Illinois barn, parked for over 20 years. The car sustained damage to the top from a tree that fell on it and will need total restoration. 2 door with a V8 engine and 4 speed. This car had a factory 6 cylinder and was converted to an 8 cylinder. The rear axles were changed out to support the V8 motor. This car was running when it was parked 20 year ago, however the motor is currently frozen. The car is complete, the frame is solid and I have pink slip. The car needs a good home and is perfect for any classic car enthusiast looking a project. Please let me know if you have any questions.
|
Chevrolet Bel Air/150/210 for Sale
- 1962 chevrolet bel air station wagon impala biscayne
- 1965 chevy bel air ls6 4l60e swap belair ls1 psi chevelle nova camaro 1966 ls2(US $23,500.00)
- 1965 chevrolet bel air base sedan 4-door 3.8l(US $12,000.00)
- 1956 chevrolet 150 4 door(US $13,500.00)
- 1956 chevy b150
- Custom 1955 chevy 210 4door show car(US $24,995.00)
Auto Services in California
Zoll Inc ★★★★★
Zeller`s Auto Repair ★★★★★
Your Choice Car ★★★★★
Young`s Automotive ★★★★★
Xact Window Tinting ★★★★★
Whitaker Brake & Chassis Specialists ★★★★★
Auto blog
Looking back at the Citation IV concept that likely shaped the GM EV1
Wed, Aug 20 2014Those who forget history are condemned to repeat it. We're not sure how that applies to the GM EV1, but we'd still like to share something from Autoline Daily, an online automotive new show with our friend John McElroy. He's been covering the business for decades now and recently found something interesting: pictures of the 1984 Chevrolet Citation IV concept, seen above. Displayed half a decade before the first electric concept that would become the EV1 (inset), McElroy says it's now clear that the elegant, aerodynamic EV1 took a lot of styling cues from the Citation IV, which was developed in part thanks to GM's new-at-the-time Aerodynamics Laboratory. We agree with him that the spats over the rear wheels, the flush glass, and the covered headlights all bear a certain kind of similarity between the two cars. That the colors almost match is a nice coincidence. The Impact (the concept version of the EV1) looked "frumpier," McElroy says, because it wasn't as long as the Citation. You can read a lot more about the Citation IV here and check out McElroy's thoughts in the video below. Find the Citation starting at around 3:45. This content is hosted by a third party. To view it, please update your privacy preferences. Manage Settings.
GM cutting production at two plants
Thu, Feb 26 2015General Motors is continuing to adjust to excess supply of some of its brands' models. To get production more in line with the vehicles' actual demand, the automotive giant is idling two of its factories in North America in the coming months. The Orion Assembly plant is going to be down from March 9-13, according to an anonymous plant worker and another insider speaking to Automotive News. The factory builds the Chevrolet Sonic and Buick Verano, but there are plenty of both models sitting on dealer lots, including 216 days worth of Sonics, according to AN. The factory already had two idle periods announced to reduce the excess. In addition, downtime is scheduled at GM's "Flex" line at the Oshawa, Ontario, Canada, plant from April 13-17. This affects supply of the Chevrolet Camaro, Impala, Buick Regal and Cadillac XTS. Among them, the automotive giant has the largest supply of Regals ready for dealers with 213 days worth of them, according to AN. The future for the whole Oshawa factory is cloudy in general, though. There are rumors that it could close entirely in the future because the Camaro is leaving and the Regal and XTS might not last much longer than 2017. The Canadian government and the labor union there intend to put up a fight, though. News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing Buick Cadillac Chevrolet GM orion assembly oshawa plant idle
GM, Pilot will build EVgo fast chargers at 500 truck stops across U.S.
Thu, Jul 14 2022All of our maps showing electric vehicle charging stations across the U.S. are going to need an update. Today, General Motors, Pilot and EVgo announced plans to work together on a nationwide DC fast charging network. The plan calls for 2,000 charging stalls that can deliver up to 350 kW to be installed at up to 500 Pilot and Flying J travel centers in the U.S. The goal is to have DC fast chargers available in 50-mile intervals across the country. The new charging stations will feature GM's "Ultium Charge 360" branding and "Pilot Flying J" logos but will not be limited to drivers of GM EVs. The plugs will use CCS connectors and be available to anyone. GM EV owners can take advantage of benefits, including the ability to make exclusive reservations, get discounts on charging costs and streamline the charging process with Plug and Charge and in-vehicle apps that can provide real-time charger availability. The first installation phase will take place in 2023, and "the bulk of the installations" should be completed by 2025, EVgo CEO Kathy Zoi said during a conference call with reporters announcing the plan. "We're gonna get going immediately and commence all of that engineering and planning stuff," she said. "We've got a pretty orderly plan." Pilot CEO Shameek Konar said the company expects the new EV charging stations to coexist with the current fuel infrastructure. "An average Pilot Flying J location is about 10 acres," Konar said. "This will be in addition to all of our gas pumps. The way I think about it is, this is a new source of energy that is going to coexist with gas for quite some time. We can debate how long, but we need to serve both groups of customers." Installing DC fast chargers at hundreds of Pilot's travel centers — aka truck stops — means there should be food, drinks, restrooms, WiFi and even showers available while you wait for an EV to charge. Pilot recently announced its “New Horizons” plan that will invest $1 billion in upgrading Pilot travel centers with more premium amenities, including expanded seating and lounge areas. While the exact amount of time it will take to charge an EV using these new stations will vary on the EV and its current state of charge, most EVs can refill from a low state of charge to around 80 percent in 20-30 minutes on a fast charger. The new stations are future-proofed to deliver up to 350 kW, a charge rate that few EVs today can handle.