2001 Chevrolet Lt Pkg 1 Owner Niada Certified on 2040-cars
Pompano Beach, Florida, United States
Chevrolet Venture for Sale
Cheap running and driving chevrolet venture nice van for the $$$ priced to sell(US $1,495.00)
1997 chevrolet venture mini van handy caped equiped
2001 chevrolet venture lt mini passenger van 4-door 3.4l(US $3,900.00)
2004 chevrolet venture ls mini passenger van 4-door 3.4l(US $3,200.00)
2004 chevrolet venture ~ absolute sale ~ no reserve ~
Ext wb w/1sa pkg 4 dr van automatic gasoline 3.4l 3400 v6 sfi (185 hp brown(US $6,431.00)
Auto Services in Florida
Zych Certified Auto Repair ★★★★★
Xtreme Automotive Repairs Inc ★★★★★
World Auto Spot Inc ★★★★★
Winter Haven Honda ★★★★★
Wing Motors Inc ★★★★★
Walton`s Auto Repair Inc ★★★★★
Auto blog
GM starting to talk seriously about 200-mile EV
Sun, Oct 12 2014We've been hearing word of a 200-mile EV from Chevrolet for a while now. First, there was General Motors then-CEO Dan Akerson hinting at a $30,000, 200-mile EV that would take the competition by surprise. Then Akerson confirmed that GM is working on a 200-mile EV in a speech in March. LG Chem, which supplies batteries to GM and other automakers, recently said it was working on batteries for EVs with a range of 200 miles. GM's head of global product development Mark Reuss just re-confirmed that there are plans for an EV with a 200-mile range, and sources have told Automotive News what that car will be. While Reuss didn't mention anything about a specific model or platform, two undisclosed sources with knowledge of GM's plans have said that an EV with a range of about 200 miles is indeed in the works, and that it will be based on the Chevrolet Sonic. The sources also gave a timeline for the car, saying it is slated for sometime in 2017. According to Reuss, the plan is for Chevy to offer a lineup of electric cars, with the 200-mile EV joining ranks of the Chevrolet Volt and the Spark EV. He didn't hint at a timeline, but if the sources are correct, we could see a Sonic EV being built within a few years. Reuss sees demand for it, too. When speaking of the Spark EV, currently only available in California and Oregon, he says that "people wish we would sell it all around the country." If he's right about that, it's not difficult to imagine people taking interest in Chevrolet's 200-mile electric car, whether or not it's a Sonic.
Race Recap: Rolex 24 at Daytona was fast and feisty
Mon, Jan 26 2015Let the record show that victory at the 2015 Rolex 24 at Daytona went to the No. 02 Chip Ganassi Racing with Felix Sabates Target/Ford EcoBoost Riley DP driven by Verizon IndyCar drivers Scott Dixon and Tony Kanaan and NASCAR drivers Jamie McMurray and Kyle Larson. The winner did 740 laps to cover 2,634.3 miles in 24 hours and 57.667 seconds. That's a statement to this year's pace in spite of 18 cautions, two more than last year: the Michael Shank Racing Ligier got pole with a time of 1:39.194, slower than last year's pole time of 1:38.270; however, the winning car last year only did 695 laps. The fight for top honors was shaved to a four-car battle over the first third of the event. The No. 02 Ganassi car took the lead on the first lap, swapping it well into the night with the No. 01 Ganassi car, the No. 10 Wayne Taylor Racing Corvette DP, and the defending champion No. 5 Action Express Corvette DP, all of them staying within about 20 seconds of one another. The Action Express car had a fuel connector come loose and lost three laps getting towed back to the pits to have it reattached, but was back in the lead 18 hours in. The No. 01 Ganassi car dropped out with recurring clutch problems 22 hours in, retiring not long after. A race-within-the-race is where the concluding action happened, a seven minute, 30-second dash from the end of the last caution to the checkered flag. During the penultimate pit stops with an hour to go, Dixon was in second place followed Jordan Taylor in the Wayne Taylor Racing DP into the pits but beat him out, taking the lead. The Action Express car was in third. In the last pit stops of the race, Dixon gained even more time, getting a four-second advantage over Taylor. Then a full-course caution came out twenty minutes before the finish when a Prototype Challenge car hit the wall and caught fire, bunching up the field. That closed the pits, but the Wayne Taylor Racing car had to pit during that yellow because of a miscalculation of driver time. No driver can be behind the wheel for more than four hours in a six-hour period but Jordan Taylor was going to go over, so he came in to swap out for brother Ricky. That cost the team any chance of second place, since they took an additional drive-through penalty for entering closed pits. When the track went green again, Sebastien Bourdais in the Action Express car stayed all over Dixon for the final five laps but couldn't get around him.
GM struggles to sell small cars, plans to lay off 2,084 employees at two plants
Thu, Nov 10 2016Due to low demand for some of its vehicles, General Motors plans to cut 2,084 jobs at its assembly plants in Lordstown, OH and Lansing, MI. At the same time, the automaker also announced plans to invest approximately $900 million in three of its facilities – the Toledo Transmission Operations in Ohio, Bedford Casting Operations in Indiana, and Lansing Grand River in Michigan - for future products. GM will discontinue the third shift at both the Lansing Grand River plant and the Lordstown, OH plant. The Cadillac ATS, Cadillac CTS, and Chevrolet Camaro are made at the automaker's plant in Michigan, which currently has 2,700 employees. The move to eliminate the third shift affects 810 hourly workers, as well as 29 salaried employees, starting on January 16th. The plant in Lordstown, OH currently has 4,500 employees and makes the Chevrolet Cruze sedan. The plan to discontinue the third shift will affect 43 salaried workers and 1,202 hourly employees and will start on January 23rd. As Fortune points out, sales of the Cruze are down 20 percent through October, while sales of the Cadillac ATS and CTS were down 17 percent through the same period of time. In addition to cutting the third shift at both assembly plants, the automaker plans to invest a total of $900 million between three of its facilities for unnamed future products. GM's Toledo Transmission Operations will receive $667.6 million, the Lansing Grand River Assembly plant will receive $211 million, and the automaker's Bedford Casting Operations will get $37 million. Last year, GM cut roughly 500 jobs from its Orion Township factory due to slow sales of the Chevrolet Sonic and Buick Verano, with surging crossover and SUV sales as the most likely culprit. With GM posting much healthier sales figures for the Chevrolet Equinox and Cadillac XT5 compared to the ATS, CTS, and Cruze, it looks like compact SUVs are to blame for this year's layoffs as well. Related Video: News Source: Fortune, General MotorsImage Credit: REUTERS / Rebecca Cook Hirings/Firings/Layoffs Plants/Manufacturing Cadillac Chevrolet GM Coupe Sedan Lordstown Ohio