1996 Chevrolet Tahoe Ls Sport Utility 4-door 5.7l Gmc Yukon Suburban Blazer on 2040-cars
Somerset, Pennsylvania, United States
UP FOR AUCTION IS MY 1996 CHEVY TAHOE. GREAT CONDITION INSIDE AND OUT FOR BEING 17 YEARS OLD. I BOUGHT THIS CAR ABOUT 1 YEAR AGO AND LOVED IT. STRONG RUNNING MOTOR, 4X4 WORKS GREAT AND THE GUY I BOUGHT IT OFF OF KEPT EXCELLENT RECORDS. MOST OF THE USUAL STUFF HAS BEEN REPLACED LIKE THE GAS TANK, EXHAUST, AND A THE LIST GOES ON AND ON. BRAND NEW FRONT BRAKES, NEWER TIRES 75% LEFT, REMOTE START, CRUISE CONTROL, COLD AC, POWER WINDOWS AND LOCKS, KEYLESS ENTRY, TOW HITCH, SIRIUS READY - CAR KIT IS INSTALLED. IT DOES HAVE A VERY SMALL WATER LEAK SOMEWHERE. I HAD TO ADD WATER ABOUT EVERY 500-1000 MILES. CAN'T FIND THE LEAK AND IT DOES NOT HAVE ANY IN THE OIL OR ANY ON THE GROUND. PUT STOP LEAK IN IT AND SEEMS TO BE HOLDING FOR NOW. DOES NOT LEAK ANY OIL ON THE GROUND. GOOD SOLID MOTOR. THE BATTERY SEEMS TO BE GETTING LOW ON IT FROM SITTING AND MAY NEED A NEW ONE SOON. THIS IS A LOW RESERVE AUCTION AND I AM SURE THAT YOU WILL GET WHAT IS DESCRIBED.
|
Chevrolet Tahoe for Sale
11 chevrolet tahoe 4x4 1500 lt leather, roof, nav, rear entertainment, lift
2010 chevy tahoe ltz nav rear cam 7-pass 20" wheels 26k texas direct auto(US $36,980.00)
2008 chevrolet tahoe 4wd 1500 ltz black
2011 chevy tahoe lt lifted leather rear cam dvd 29k mi texas direct auto(US $34,980.00)
2007 chevrolet tahoe lt - loaded!!!
2007 used 5.3l v8 16v automatic rwd suv premium
Auto Services in Pennsylvania
Wood`s Locksmithing ★★★★★
Wiscount & Sons Auto Parts ★★★★★
West Deptford Auto Repair ★★★★★
Waterdam Auto Service Inc. ★★★★★
Wagner`s Auto Service ★★★★★
Used Auto Parts of Southampton ★★★★★
Auto blog
GM struggles to sell small cars, plans to lay off 2,084 employees at two plants
Thu, Nov 10 2016Due to low demand for some of its vehicles, General Motors plans to cut 2,084 jobs at its assembly plants in Lordstown, OH and Lansing, MI. At the same time, the automaker also announced plans to invest approximately $900 million in three of its facilities – the Toledo Transmission Operations in Ohio, Bedford Casting Operations in Indiana, and Lansing Grand River in Michigan - for future products. GM will discontinue the third shift at both the Lansing Grand River plant and the Lordstown, OH plant. The Cadillac ATS, Cadillac CTS, and Chevrolet Camaro are made at the automaker's plant in Michigan, which currently has 2,700 employees. The move to eliminate the third shift affects 810 hourly workers, as well as 29 salaried employees, starting on January 16th. The plant in Lordstown, OH currently has 4,500 employees and makes the Chevrolet Cruze sedan. The plan to discontinue the third shift will affect 43 salaried workers and 1,202 hourly employees and will start on January 23rd. As Fortune points out, sales of the Cruze are down 20 percent through October, while sales of the Cadillac ATS and CTS were down 17 percent through the same period of time. In addition to cutting the third shift at both assembly plants, the automaker plans to invest a total of $900 million between three of its facilities for unnamed future products. GM's Toledo Transmission Operations will receive $667.6 million, the Lansing Grand River Assembly plant will receive $211 million, and the automaker's Bedford Casting Operations will get $37 million. Last year, GM cut roughly 500 jobs from its Orion Township factory due to slow sales of the Chevrolet Sonic and Buick Verano, with surging crossover and SUV sales as the most likely culprit. With GM posting much healthier sales figures for the Chevrolet Equinox and Cadillac XT5 compared to the ATS, CTS, and Cruze, it looks like compact SUVs are to blame for this year's layoffs as well. Related Video: News Source: Fortune, General MotorsImage Credit: REUTERS / Rebecca Cook Hirings/Firings/Layoffs Plants/Manufacturing Cadillac Chevrolet GM Coupe Sedan Lordstown Ohio
UAW rejects GM contract proposal but makes a counter offer
Tue, Oct 1 2019The United Auto Workers union said a new comprehensive offer made by General Motors Co late Monday to end a two-week-old strike was not acceptable and said it had made a new counterproposal. UAW vice president Terry Dittes said in a letter to members "there are many important issues that remain unresolved." The union is awaiting GM's next proposal. He said GM's offer came up short on many issues. Dittes said GM made a "comprehensive proposal" at 9:40 p.m. Monday. "This proposal that the company provided to us on day 15 of the strike did not satisfy your contract demands or needs. There were many areas that came up short like health care, wages, temporary employees, skilled trades and job security to name a few." Dittes is the union's vice president for GM relations and the UAW's lead negotiator in these contract talks. "We have responded today with a counterproposal and are awaiting GM's next proposal to the union," he wrote. "Regardless of what is publicized in print or social media, etc., there are still many important issues that remain unresolved." The strike, in its third week, has cost GM more than $1 billion, according to J.P. Morgan analyst Ryan Brickman. He said the cost per day in potential profit is $82 million. However, another analysis, by East Lansing-based consultant Anderson Economic Group, put the losses at $25 million a day. And the effects of the strike are expanding. GM said Tuesday the strike has created a parts shortage that forced the automaker to halt production at its pickup and transmission plants in Silao, Mexico, temporarily laying off 6,000 workers. Silao is where GM builds its highly profitable four-door crew cab Chevy Silverado and GMC Sierra pickups. The strike has also forced GM to idle some Canadian workers, and many suppliers have been forced to halt operations. About 48,000 UAW members went on strike on Sept. 16 seeking higher pay, greater job security, a bigger share of the leading U.S. automaker’s profit and protection of their healthcare.Â
GM laying off 500 workers to slow Chevy Sonic production
Sat, Oct 24 2015Due to slow sales of the Chevrolet Sonic and Buick Verano, General Motors is cutting a shift at the Orion Township plant that builds the pair. The move lays off about 500 workers, but most of them are expected to get offers to transfer to other factories, Automotive News reports. The move came just a day after GM announced adding 1,200 employees to the Detroit-Hamtramck plant. GM has been trying all year at the Orion Township factory to align production of the Sonic and Verano with their demand. The automaker first attempted idling the plant several times and eventually resorted to laying off about 100 workers. It also reduced the production rate there. With the huge rise in popularity of crossovers, demand for the plant's small cars is on the downturn. According to Automotive News, there's currently a 116-day supply of Sonics and 100 days of Veranos to sell. Delivers tell a similar tale because the Chevy is off 35.2 percent from January to September, and the Buick does little better with a 27.2 percent drop from the same period last year. While the situation at Orion Township might look rough now, big things are on the horizon. Soon, the new Chevy Bolt electric vehicle will be built there when it hits the market around 2017. Plus, the plant will also get a $245-million upgrade and 300 new jobs for another, unannounced vehicle.