2007 Chevrolet Silverado 2500 Hd (classic) on 2040-cars
Dora, Alabama, United States
Body Type:Pickup Truck
Vehicle Title:Clear
Engine:V8 6.0
Fuel Type:Gasoline
For Sale By:Private Seller
Make: Chevrolet
Model: Silverado 2500
Cab Type (For Trucks Only): Extended Cab
Trim: LT
Options: 4-Wheel Drive, CD Player
Drive Type: 4wd
Safety Features: Anti-Lock Brakes, Driver Airbag, Passenger Airbag
Mileage: 89,200
Power Options: Air Conditioning, Cruise Control, Power Locks, Power Windows
Sub Model: LT
Exterior Color: Gray
Interior Color: Black
Disability Equipped: No
Number of Cylinders: 8
6.0 V8. Automatic. 4x4. No mechanical problems. No damage. Well taken care of. 3" lift 305 Nitto Terra Grappler tires. Moto Metal wheels. 89,xxx miles spray in bed liner. Tool box comes with it. Westin bull bar. 2007 Classic HD. Great truck all around. It will definitely turn some heads.
Call or text with any questions. Mike 205-948-6-seven-two-8
Chevrolet Silverado 2500 for Sale
2014 ltz crew 4x4 z71 navigation leather heated duramax diesel rear camera(US $53,575.00)
2007 chevrolet silverado 2500hd classic
2007 chev silverado 2500hd crew cab ltz 6.6l duramax turbo diesel 4x4 shrortbed
Ltz 6.6l duramax sunroof rear assist rear camera heated and cooled leather seats
2009 chevrolet ltz - 4x4 - truck - diesel!!!(US $43,995.00)
2005 white chevrolet silverado 2500hd(US $16,750.00)
Auto Services in Alabama
Waldrop Motor Inc ★★★★★
Super Lube-301 ★★★★★
Stephens Service Station ★★★★★
Samz Auto Service Center ★★★★★
Sales Ford Lincoln Mercury Inc ★★★★★
River Park Transmission ★★★★★
Auto blog
GM cutting Chevy Sonic, Buick Verano production [UPDATE]
Sun, Jan 25 2015UPDATE: A previous version of this story indicated that Orion Assembly would be idled for seven weeks, from February 16 through April 6. This was incorrect. The factory will instead only be idled for the weeks of February 16 and April 6. The story has been edited to reflect this. General Motors has announced that the factory responsible for the Buick Verano and Chevrolet Sonic will be idled for the weeks of February 16 and April 6, with blame being placed on excess supply. The Orion Assembly plant, about 45 minutes north of GM's Renaissance Center headquarters, employs about 1,800 people, but they'll be given a pair of furloughs as inventories of the sub-compact Sonic and premium compact Verano reach 127 days and 84 days, respectively. That works out to 26,600 Chevys and 9,800 Buicks waiting for buyers. According to Automotive News, the compact Chevy sales bested the industry average in 2014, jumping up nine percent versus the the overall segment's eight-percent gain, while the Buick sedan's sales were down four percent. When asked about the shutdown, a GM spokesman told AN that it will "build to market demand," while also pointing out that the company did not comment on production plans. News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing Buick Chevrolet GM buick encore orion assembly
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.
GM, UAW poaching Nissan workers in Tennessee
Tue, Sep 8 2015General Motors and the United Auto Workers are going on a recruitment drive at the Spring Hill factory in Tennessee, and they're hoping to poach some skilled workers from Nissan's nearby plant in Smyrna, TN. The General and the union even bought a billboard advertising for industrial electricians near the Japanese automaker's facility, according to the Daily News Journal. The reason for the billboard was simple. "GM was short of electricians," said Tim Stannard, the president of the UAW local at Spring Hill, to the Daily News Journal. The factory currently builds the Chevrolet Equinox but has a contract to assemble the next generation of Ecotec engines and the Cadillac XT5, which replaces the SRX. Thanks to the $185-million deal, employment there is expected to double by May 2016, according to Stannard, with roughly 1,800 additional union jobs. Beyond just several billboards, GM has job postings online for the Spring Hill plant looking for workers with specific skills. There has already been some interest in the positions among Nissan employees, Stannard indicated. According to a recent study by the Center for Automotive Research, the average GM worker currently makes $58 an hour, including benefits. Comparatively, Nissan pays an average of $42 an hour with benefits. The General's number could change in the coming weeks because its contract with the UAW is about to expire, and higher wages are among the major negotiating points.