09 K2500hd Lt 6.6l Duramax Z71 6spd Allison 4x4 Short-bed Goose-neck Carfax Tx ! on 2040-cars
Houston, Texas, United States
Vehicle Title:Clear
Fuel Type:Diesel
For Sale By:Dealer
Transmission:Automatic
Make: Chevrolet
Cab Type (For Trucks Only): Crew Cab
Model: Silverado 2500
Warranty: Unspecified
Mileage: 217,562
Sub Model: DIESEL 4WD
Options: CD Player
Exterior Color: Red
Power Options: Power Locks
Interior Color: Gray
Number of Cylinders: 8
Chevrolet Silverado 2500 for Sale
- 2007 chevrolet silverado 2500hd lt1 crew cab 4wd damaged salvage loaded l@@k!!(US $7,900.00)
- 06 chevy silverado 2500 4x4 6.6l turbo diesel crew long 2 owner 80+ pics(US $13,995.00)
- 1991 chevrolet silverado 2500 extended cab pickup 2-door 5.7l rebuilt engine(US $3,950.00)
- 2011 chevy silverado 2500hd crew z71 4x4 diesel nav 40k texas direct auto(US $43,780.00)
- 4x4 crew cab 4 door pick up truck(US $13,999.00)
- 2013 chevy silverado 2500hd lt crew 4x4 diesel long bed texas direct auto(US $38,980.00)
Auto Services in Texas
Zepco ★★★★★
Xtreme Motor Cars ★★★★★
Worthingtons Divine Auto ★★★★★
Worthington Divine Auto ★★★★★
Wills Point Automotive ★★★★★
Weaver Bros. Motor Co ★★★★★
Auto blog
GM recalling 250,000 SUVs over door electronics
Mon, 20 Aug 2012After a door-fire investigation that dates back to February, the National Highway Traffic Safety Administration has officially announced a recall today that affects around 250,000 General Motors SUVs for a faulty driver's door module. The recall applies to the Buick Rainier, Chevrolet Trailblazer, GMC Envoy, Isuzu Ascender and Saab 9-7X from the 2006 and 2007 model years, as well as the 2006 Chevrolet Trailblazer EXT and GMC Envoy XL for vehicles sold and/or registered in the Snow Belt.
Road salt use in these midwestern and northern states can lead to corrosion of the driver's door module on these GMT360 and GMT370 vehicles, which allows water to come in contact with the circuit board. If shorted out, the vehicle's power door locks and power windows will not work, and could possibly lead to overheating and, in some circumstances, a fire. No official word on how many total vehicles caught on fire, but back in June, 28 fires had been reported to the government agency. A fix for the problem is still being worked out, but all affected vehicle owners will be notified by GM.
Scroll down for the official NHTSA statement.
GM cutting production at two plants
Thu, Feb 26 2015General Motors is continuing to adjust to excess supply of some of its brands' models. To get production more in line with the vehicles' actual demand, the automotive giant is idling two of its factories in North America in the coming months. The Orion Assembly plant is going to be down from March 9-13, according to an anonymous plant worker and another insider speaking to Automotive News. The factory builds the Chevrolet Sonic and Buick Verano, but there are plenty of both models sitting on dealer lots, including 216 days worth of Sonics, according to AN. The factory already had two idle periods announced to reduce the excess. In addition, downtime is scheduled at GM's "Flex" line at the Oshawa, Ontario, Canada, plant from April 13-17. This affects supply of the Chevrolet Camaro, Impala, Buick Regal and Cadillac XTS. Among them, the automotive giant has the largest supply of Regals ready for dealers with 213 days worth of them, according to AN. The future for the whole Oshawa factory is cloudy in general, though. There are rumors that it could close entirely in the future because the Camaro is leaving and the Regal and XTS might not last much longer than 2017. The Canadian government and the labor union there intend to put up a fight, though. News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing Buick Cadillac Chevrolet GM orion assembly oshawa plant idle
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.