1968 Chevrolet Chevy Ii Nova on 2040-cars
Fort Pierce, Florida, United States
Engine:5.7L 350Cu. In. V8 GAS Naturally Aspirated
Body Type:U/K
Vehicle Title:Clear
Fuel Type:GAS
Exterior Color: White
Make: Chevrolet
Interior Color: Black
Model: Chevy II
Number of Cylinders: 8
Trim: Nova
Drive Type: U/K
Mileage: 19,629
The car comes with a 406 small block chevy
The block is a 509 casting 2 bolt gm 400 block, if you know about 400 this is the block you want
Eagle forged rotating assembly
Brodix Track 1 Heads
Crane chrome moly roller rockers
Herbert Solid Roller Cam part number c6kf, the cam is designed for a small NOS plate system, its has never been sprayed
.598- .625 lift cam
Team G intake
Holley 750 cfm carb, with a preform main body
Hooker super comp headers aluma coated, 1 7/8 pipes, 3.5 inch pipe to dynatech muffles with down dumps
The car is setup with a turbo 400 transmission
manual valve body
4500 stall COAN converter
and its setup with a Cheetah Shifter
Chevrolet Nova for Sale
Auto Services in Florida
Yesterday`s Speed & Custom ★★★★★
Wills Starter Svc ★★★★★
WestPalmTires.com ★★★★★
West Coast Wheel Alignment ★★★★★
Wagen Werks ★★★★★
Villafane Auto Body ★★★★★
Auto blog
GM, UAW poaching Nissan workers in Tennessee
Tue, Sep 8 2015General Motors and the United Auto Workers are going on a recruitment drive at the Spring Hill factory in Tennessee, and they're hoping to poach some skilled workers from Nissan's nearby plant in Smyrna, TN. The General and the union even bought a billboard advertising for industrial electricians near the Japanese automaker's facility, according to the Daily News Journal. The reason for the billboard was simple. "GM was short of electricians," said Tim Stannard, the president of the UAW local at Spring Hill, to the Daily News Journal. The factory currently builds the Chevrolet Equinox but has a contract to assemble the next generation of Ecotec engines and the Cadillac XT5, which replaces the SRX. Thanks to the $185-million deal, employment there is expected to double by May 2016, according to Stannard, with roughly 1,800 additional union jobs. Beyond just several billboards, GM has job postings online for the Spring Hill plant looking for workers with specific skills. There has already been some interest in the positions among Nissan employees, Stannard indicated. According to a recent study by the Center for Automotive Research, the average GM worker currently makes $58 an hour, including benefits. Comparatively, Nissan pays an average of $42 an hour with benefits. The General's number could change in the coming weeks because its contract with the UAW is about to expire, and higher wages are among the major negotiating points.
GM throttles back Chevy Malibu, Buick LaCrosse production over swollen inventories
Wed, 06 Feb 2013As inventory of the Chevrolet Malibu and Buick LaCrosse continues to pile up, General Motors will be idling its Fairfax Assembly Plant for two weeks, according to Automotive News. This move comes about a month after the plant was shut down for three weeks in late December and early January for the same reason. As of January 31, the GM had a 94-day supply of Malibu stock while the LaCrosse was a little worse with a 117-day supply.
Just last week, GM announced that it would be investing $600 million in upgrading this plant, but it's unclear what future plans the company has in store for Fairfax considering slow sales of both the plant's models. We do expect a refreshed and more luxurious LaCrosse shortly and an early design update for the Malibu to be announced at some point this year, although we have had no official word as to when either will happen.
GM cutting Chevy Sonic, Buick Verano production by more than 20%
Sat, Jun 13 2015General Motors' Orion Assembly plant in Michigan is seeing even more production cuts this year to further reduce inventories of the Chevrolet Sonic and Buick Verano. These latest adjustments mean layoffs for about 100 workers in phases starting in July. "GM Orion Assembly will adjust plant production capacity to better align with market demand," the company said in a statement announcing the change. Through May, sales of the Sonic are down 28.5 percent to 29,082 vehicles, and the Verano is off 15.6 percent, with 15,279 sold this year. According to unnamed plant insiders speaking to Automotive News, the assembly rate is slowing at Orion Assembly from the current 33 cars an hour down to 26 an hour, a 21-percent reduction. GM is also reportedly going to keep the plant idle for three weeks during the normal summer shutdown, rather than the usual two. Earlier in the year, the factory was idled for two weeks due to excess supply of the Sonic and Verano. In March, it was closed again for several days for the same reason. The Orion Assembly plant is the future home to the line for the Chevy Bolt EV. GM Statement: GM Orion Assembly will adjust plant production capacity to better align with market demand. A phased layoff of approximately 100 employees will begin in July 2015 and conclude by year-end. Related Video: News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing Buick Chevrolet GM Hatchback Sedan buick verano orion assembly