Find or Sell Used Cars, Trucks, and SUVs in USA

Ltz Low Miles 4 Dr Sedan Gasoline 2.0l Dohc 16v Turbo Silver Ice Metallic on 2040-cars

Year:2013 Mileage:19709
Location:

Rick Hendrick Chevrolet, 1500 Savannah Hwy., Charleston, SC 29407

Rick Hendrick Chevrolet, 1500 Savannah Hwy., Charleston, SC 29407
Advertising:

Auto blog

Surprise! GM putting aluminum in next-gen pickups

Wed, Aug 5 2015

Last month, General Motors launched a series of ads touting the benefits of steel over aluminum – specifically, with regard to the Chevy Silverado versus the Ford F-150. (Kind of. We're not sure what a grizzly bear has to do with anything.) We took issue with the ads, with editor in chief Mike Austin saying they "reek of insecurity, and distract from the Silverado's strengths that could be used for positive advertising." But what bothers us more, is that yet another report surfaced claiming anti-aluminum GM will indeed use the weight-saving material in its next-generation fullsize trucks. On Tuesday, GM announced a $877-million investment for its truck plant in Flint, MI. But Reuters says that huge overhaul is because the trucks will use "substantially different equipment than the tools GM uses today." The report specifically states, "People familiar with the company's plans say GM's next-generation pickups and SUVs will make use of various materials, including aluminum and lightweight steel, to shed weight and gain fuel efficiency to meet tougher federal standards." The Silverado already uses a few aluminum components in the engine and hood, and if more widespread use will help GM build its best fullsize trucks ever, then that's great. Honestly, we have no reason to doubt that aluminum will be used in the next Silverado and GMC Sierra. We just hope GM remembers that nothing is ever truly deleted from the bowels of the Internet when it launches the subsequent "look how great aluminum is!" campaign. Related Video: News Source: Reuters Green Plants/Manufacturing Chevrolet GM GMC Truck aluminum steel

Conquest and controversy conclude the 2014 Rolex 24 at Daytona [spoilers]

Sun, 26 Jan 2014

If you don't wish to know who won the 2014 Rolex 24 at Daytona, you should avert your eyes right now. We'll even give you a double-space to skedaddle...
For those of you still with us, the first race in the United SportsCar Championship (USCC) is done, but the discussions about it certainly won't end for a while. Daytona Prototypes claimed the first four overall places, the top spot taken by the No. 5 Action Express Coyote-Chevrolet Corvette DP driven by Joao Barbosa, Christian Fittipaldi, Sebastien Bourdain and Burt Friselle. The 16th and final caution of the race bunched the field up for an eight-minute sprint to the flag, so the first place getter finished just 1.4 seconds ahead of the No. 10 Wayne Taylor Racing Dallara-Chevrolet Corvette DP driven by Max Angelelli. Third place went to Brian Friselle in the No. 9 Action Express Chevrolet Corvette DP, 20 seconds down. Chevrolet power hasn't taken the overall win since 2003, eleven years later it scores a one-two-three-four. The No. 6 Muscle Milk/Pickett Racing ORECA-Nissan 03 scored fifth place, the top LMP2 finisher.
The Prototype Challenge class win went to the No. 54 CORE Autosport team of Colin Braun, Jon Bennett, Mark Wilkins and James Gue.

GM adds 1,200 jobs at Detroit-Hamtramck plant

Thu, Oct 22 2015

General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.