1971 Chevrolet El Camino Restored - No Reserve!! on 2040-cars
New Baltimore, Michigan, United States
Transmission:Automatic
Fuel Type:Gasoline
Vehicle Title:Clean
Engine:350
VIN (Vehicle Identification Number): 134801L134918
Mileage: 88150
Interior Color: Black
Number of Seats: 2
Trim: Restored - No Reserve!!
Make: Chevrolet
Drive Type: RWD
Engine Size: 5.7 L
Model: El Camino
Exterior Color: Silver
Car Type: Classic Cars
Number of Doors: 2
Chevrolet El Camino for Sale
- 1967 chevrolet el camino(US $15,000.00)
- 1960 chevrolet el camino(US $6,500.00)
- 1985 chevrolet el camino clean car fax amazing condition laser straight!!(US $10,000.00)
- 1986 chevrolet el camino ss 18" riddler's 245/45/18 no disappointments mint!!(US $15,000.00)
- 1967 chevrolet el camino ss 427 clone(US $20,000.00)
- 1964 chevrolet el camino(US $24,975.00)
Auto Services in Michigan
Zoomers Express Care ★★★★★
Wetmore`s Inc ★★★★★
Westnedge Auto Repair ★★★★★
Warren Transmission ★★★★★
Village Ford ★★★★★
Vehicle Accessories ★★★★★
Auto blog
GM cutting production at two plants
Thu, Feb 26 2015General Motors is continuing to adjust to excess supply of some of its brands' models. To get production more in line with the vehicles' actual demand, the automotive giant is idling two of its factories in North America in the coming months. The Orion Assembly plant is going to be down from March 9-13, according to an anonymous plant worker and another insider speaking to Automotive News. The factory builds the Chevrolet Sonic and Buick Verano, but there are plenty of both models sitting on dealer lots, including 216 days worth of Sonics, according to AN. The factory already had two idle periods announced to reduce the excess. In addition, downtime is scheduled at GM's "Flex" line at the Oshawa, Ontario, Canada, plant from April 13-17. This affects supply of the Chevrolet Camaro, Impala, Buick Regal and Cadillac XTS. Among them, the automotive giant has the largest supply of Regals ready for dealers with 213 days worth of them, according to AN. The future for the whole Oshawa factory is cloudy in general, though. There are rumors that it could close entirely in the future because the Camaro is leaving and the Regal and XTS might not last much longer than 2017. The Canadian government and the labor union there intend to put up a fight, though. News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing Buick Cadillac Chevrolet GM orion assembly oshawa plant idle
Stolen '57 Chevy Returned To Owner After 30 Years
Fri, Feb 21 2014Three decades after it was stolen, a 1957 Chevrolet Bel Air has been returned to a Northern California man - in better shape than when he originally owned it. The Santa Rosa Press Democrat reports Ian "Skip" Wilson was shocked to get a call from the California Highway Patrol informing him that his long-lost Chevy was taken off an Australia-bound cargo ship. The 65-year-old says the car has had a lot of work done on it since it disappeared from his Lake County home in 1984. It was returned with a monogrammed interior, 17-inch racing wheels, rack-and-pinion steering and a 350-horsepower V-8 engine. The retired mechanic says the two-door was in sorry shape when he bought it for $375 in 1975 with plans for fixing it up. Related Gallery 2014 Chevrolet Corvette Stingray Test Drive View 9 Photos Weird Car News Chevrolet Safety
GM cutting Chevy Sonic, Buick Verano production by more than 20%
Sat, Jun 13 2015General Motors' Orion Assembly plant in Michigan is seeing even more production cuts this year to further reduce inventories of the Chevrolet Sonic and Buick Verano. These latest adjustments mean layoffs for about 100 workers in phases starting in July. "GM Orion Assembly will adjust plant production capacity to better align with market demand," the company said in a statement announcing the change. Through May, sales of the Sonic are down 28.5 percent to 29,082 vehicles, and the Verano is off 15.6 percent, with 15,279 sold this year. According to unnamed plant insiders speaking to Automotive News, the assembly rate is slowing at Orion Assembly from the current 33 cars an hour down to 26 an hour, a 21-percent reduction. GM is also reportedly going to keep the plant idle for three weeks during the normal summer shutdown, rather than the usual two. Earlier in the year, the factory was idled for two weeks due to excess supply of the Sonic and Verano. In March, it was closed again for several days for the same reason. The Orion Assembly plant is the future home to the line for the Chevy Bolt EV. GM Statement: GM Orion Assembly will adjust plant production capacity to better align with market demand. A phased layoff of approximately 100 employees will begin in July 2015 and conclude by year-end. Related Video: News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing Buick Chevrolet GM Hatchback Sedan buick verano orion assembly