Find or Sell Used Cars, Trucks, and SUVs in USA

1965 Chevrolet El Camino Base Standard Cab Pickup 2-door 350 V-8 on 2040-cars

Year:1965 Mileage:0
Location:

Las Vegas, Nevada, United States

Las Vegas, Nevada, United States

This is a really nice project car for someone who does not want to start off with a large investment. Nice body put together from my body shop. Engine I pulled a while ago to do a frame off restoration, but you know how that went. Too many projects and no time to due it correctly. The 350 ran great prior to being pulled out and has been covered since. The body as shown has alternate quarter panels which are all straight and ready for prep and paint. Transmission and rear end are all stock and will work nicely once the motor is re-installed. The interior although rough has not been changed, needs the usual door panels, liner, rugs etc to make it correct. Nice thing on Elkie's is only needs the front cab without the need for backseat. Email me if you have questions, this car sells on the low end for 4K and if restored can reach high teens or higher based on your efforts. The car is being sold without reserve and will make a nice inexpensive investment.

Auto Services in Nevada

Yee Bros. Automotive ★★★★★

Automobile Parts & Supplies, Auto Body Parts
Address: 1590 E 2nd St, Verdi
Phone: (775) 329-9191

Ultimate Automotive ★★★★★

Auto Repair & Service, New Car Dealers, Auto Transmission
Address: 1220 Greg St, Spanish-Springs
Phone: (775) 358-2770

Transmission Warehouse ★★★★★

Automobile Parts & Supplies, Auto Transmission, Automobile Accessories
Address: 3030 Contract Ave, Las-Vegas
Phone: (702) 474-7273

Top Dent Repair ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting, Automobile Detailing
Address: 4350 Arvile St, unit C22a, Henderson
Phone: (702) 981-0620

Sparks Muffler Service ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Mufflers & Exhaust Systems
Address: 26 E Freeport Blvd, Lockwood
Phone: (775) 359-1946

Sierra Window Tinting ★★★★★

Auto Repair & Service, Window Tinting, Glass Coating & Tinting
Address: 1660 Greg St, Spanish-Springs
Phone: (775) 747-5942

Auto blog

Recharge Wrap-up: EVs poll well in Portland, Tesla seeks office space

Tue, Aug 5 2014

In a poll of drivers in Portland, more than 80 percent said they would be driving an EV in the next 10 years if they weren't already. The poll was small and not scientific, with just 218 votes cast, but it does reflect a slice of a certain population with changing attitudes toward electric mobility, and 80 percent is an impressive figure. Additionally, 43 percent of respondents planned to have an EV in the next five years, and only 18 percent said they prefer gasoline-powered vehicles. With EVs in many ways repeating the adoption process that hybrids went through a decade ago, the five- or ten-year timeframe for more widespread use seems only natural. Read more at the Portland Business Journal. San Francisco Mayor Ed Lee parks like an idiot, or rather, his security detail does. His Chevrolet Volt has been ticketed for parking six times since he took office. Granted, those street-sweeping signs are tough to keep track of, but his car has been photographed blocking at a bus stop while grabbing a burrito (who hasn't sinned in the name of a delicious burrito?), and was even caught parked in a crosswalk. The tickets were all dismissed. Read more from the SF Gate. Tesla is looking for office space in Silicon Valley. As the electric car company continues to search for a place to build its $4- to $5-billion battery Gigafactory, it also needs some real estate to expand its operations near its Palo Alto home. Tesla has expanded from 3,000 to 6,000 California-based employees since the end of 2012, and plans to add 500 more by the end of the year. It is currently looking for 200,000 to 300,000 square feet of office space close to its Fremont factory, according to sources in the real estate industry. Read more at the Silicon Valley Business Journal. Related Gallery 2014 Chevrolet Volt View 11 Photos News Source: Portland Business Journal, SF Gate, Silicon Valley Business JournalImage Credit: Paul Sakuma / AP Green Chevrolet Tesla Electric recharge wrapup portland silicon valley parking ticket

Surprise! GM putting aluminum in next-gen pickups

Wed, Aug 5 2015

Last month, General Motors launched a series of ads touting the benefits of steel over aluminum – specifically, with regard to the Chevy Silverado versus the Ford F-150. (Kind of. We're not sure what a grizzly bear has to do with anything.) We took issue with the ads, with editor in chief Mike Austin saying they "reek of insecurity, and distract from the Silverado's strengths that could be used for positive advertising." But what bothers us more, is that yet another report surfaced claiming anti-aluminum GM will indeed use the weight-saving material in its next-generation fullsize trucks. On Tuesday, GM announced a $877-million investment for its truck plant in Flint, MI. But Reuters says that huge overhaul is because the trucks will use "substantially different equipment than the tools GM uses today." The report specifically states, "People familiar with the company's plans say GM's next-generation pickups and SUVs will make use of various materials, including aluminum and lightweight steel, to shed weight and gain fuel efficiency to meet tougher federal standards." The Silverado already uses a few aluminum components in the engine and hood, and if more widespread use will help GM build its best fullsize trucks ever, then that's great. Honestly, we have no reason to doubt that aluminum will be used in the next Silverado and GMC Sierra. We just hope GM remembers that nothing is ever truly deleted from the bowels of the Internet when it launches the subsequent "look how great aluminum is!" campaign. Related Video: News Source: Reuters Green Plants/Manufacturing Chevrolet GM GMC Truck aluminum steel

GM, Pilot will build EVgo fast chargers at 500 truck stops across U.S.

Thu, Jul 14 2022

All of our maps showing electric vehicle charging stations across the U.S. are going to need an update. Today, General Motors, Pilot and EVgo announced plans to work together on a nationwide DC fast charging network. The plan calls for 2,000 charging stalls that can deliver up to 350 kW to be installed at up to 500 Pilot and Flying J travel centers in the U.S. The goal is to have DC fast chargers available in 50-mile intervals across the country. The new charging stations will feature GM's "Ultium Charge 360" branding and "Pilot Flying J" logos but will not be limited to drivers of GM EVs. The plugs will use CCS connectors and be available to anyone. GM EV owners can take advantage of benefits, including the ability to make exclusive reservations, get discounts on charging costs and streamline the charging process with Plug and Charge and in-vehicle apps that can provide real-time charger availability. The first installation phase will take place in 2023, and "the bulk of the installations" should be completed by 2025, EVgo CEO Kathy Zoi said during a conference call with reporters announcing the plan. "We're gonna get going immediately and commence all of that engineering and planning stuff," she said. "We've got a pretty orderly plan." Pilot CEO Shameek Konar said the company expects the new EV charging stations to coexist with the current fuel infrastructure. "An average Pilot Flying J location is about 10 acres," Konar said. "This will be in addition to all of our gas pumps. The way I think about it is, this is a new source of energy that is going to coexist with gas for quite some time. We can debate how long, but we need to serve both groups of customers." Installing DC fast chargers at hundreds of Pilot's travel centers — aka truck stops — means there should be food, drinks, restrooms, WiFi and even showers available while you wait for an EV to charge. Pilot recently announced its “New Horizons” plan that will invest $1 billion in upgrading Pilot travel centers with more premium amenities, including expanded seating and lounge areas. While the exact amount of time it will take to charge an EV using these new stations will vary on the EV and its current state of charge, most EVs can refill from a low state of charge to around 80 percent in 20-30 minutes on a fast charger. The new stations are future-proofed to deliver up to 350 kW, a charge rate that few EVs today can handle.