1960 Custom Elcamino Frame On Restoration Power Steering Power Brakes And A/c on 2040-cars
Sarasota, Florida, United States
Chevrolet El Camino for Sale
- 1971 chevrolet el camino (no reserve)
- 2 1959 elcamino projects(US $6,500.00)
- 1965 cheverolet el camino stock restoration(US $21,500.00)
- Show-n-go==fully restored=1964 el camino=((4-speed))=leather=65 66 67 68 69 70(US $18,997.00)
- 1986 chevrolet el camino ss v8 original new fuel system clean title
- 1968 chevrolet el camino. 327 v8, auto, ps, pb. look!(US $12,850.00)
Auto Services in Florida
Youngs` Automotive Service ★★★★★
Winner Auto Center Inc ★★★★★
Vehicles Four Sale Inc ★★★★★
Valvoline Instant Oil Change ★★★★★
USA Auto Glass ★★★★★
Tuffy Auto Service Centers ★★★★★
Auto blog
Conquest and controversy conclude the 2014 Rolex 24 at Daytona [spoilers]
Sun, 26 Jan 2014If you don't wish to know who won the 2014 Rolex 24 at Daytona, you should avert your eyes right now. We'll even give you a double-space to skedaddle...
For those of you still with us, the first race in the United SportsCar Championship (USCC) is done, but the discussions about it certainly won't end for a while. Daytona Prototypes claimed the first four overall places, the top spot taken by the No. 5 Action Express Coyote-Chevrolet Corvette DP driven by Joao Barbosa, Christian Fittipaldi, Sebastien Bourdain and Burt Friselle. The 16th and final caution of the race bunched the field up for an eight-minute sprint to the flag, so the first place getter finished just 1.4 seconds ahead of the No. 10 Wayne Taylor Racing Dallara-Chevrolet Corvette DP driven by Max Angelelli. Third place went to Brian Friselle in the No. 9 Action Express Chevrolet Corvette DP, 20 seconds down. Chevrolet power hasn't taken the overall win since 2003, eleven years later it scores a one-two-three-four. The No. 6 Muscle Milk/Pickett Racing ORECA-Nissan 03 scored fifth place, the top LMP2 finisher.
The Prototype Challenge class win went to the No. 54 CORE Autosport team of Colin Braun, Jon Bennett, Mark Wilkins and James Gue.
GM will make Chevy Volt production announcement tomorrow
Mon, Apr 7 2014Thing are apparently happening to get the next-generation Chevy Volt ready for public consumption. The most obvious proof is in a preview of an announcement (possibly coming tomorrow) that the two main places where General Motors gets the Volt ready -the Detroit-Hamtramck Assembly Plant and the Brownstown Township battery assembly facility - will be getting big money upgrades and lots of new positions. The Hamtramck plant builds the Volt and its fancier cousin, the Cadillac ELR, as well as the global versions of the Volt. The Detroit News reports that GM will add 1,400 jobs and spend roughly $450 million at the two locations in order to build the redesigned Volt. What's less clear is exactly what the updates will bring us. We've heard that the new volt will be a 2016 model and come on a new chassis. Speculation in The Detroit News about tomorrow's announcement runs the gamut from a new compact PHEV with less electric range and a lower price (which makes sense) to an updated Volt with more electric range (heard it before) to a new all-electric vehicle (the moon shot). If there's any hints to be gleaned in the international Volts, there are also reports coming in that the Opel brand will get an all-electric vehicle that is cheaper than the Ampera. Read into that what you will. We pestered GM's Kevin Kelly on the new Volt (again) and he said (again) that he couldn't give out any more detail other than what's been reported. He just told AutoblogGreen that there will be an announcement tomorrow and that it will be about the Hamtramck and Brownstown facilities and involve the Volt. So, stay tuned.
GM, Pilot will build EVgo fast chargers at 500 truck stops across U.S.
Thu, Jul 14 2022All of our maps showing electric vehicle charging stations across the U.S. are going to need an update. Today, General Motors, Pilot and EVgo announced plans to work together on a nationwide DC fast charging network. The plan calls for 2,000 charging stalls that can deliver up to 350 kW to be installed at up to 500 Pilot and Flying J travel centers in the U.S. The goal is to have DC fast chargers available in 50-mile intervals across the country. The new charging stations will feature GM's "Ultium Charge 360" branding and "Pilot Flying J" logos but will not be limited to drivers of GM EVs. The plugs will use CCS connectors and be available to anyone. GM EV owners can take advantage of benefits, including the ability to make exclusive reservations, get discounts on charging costs and streamline the charging process with Plug and Charge and in-vehicle apps that can provide real-time charger availability. The first installation phase will take place in 2023, and "the bulk of the installations" should be completed by 2025, EVgo CEO Kathy Zoi said during a conference call with reporters announcing the plan. "We're gonna get going immediately and commence all of that engineering and planning stuff," she said. "We've got a pretty orderly plan." Pilot CEO Shameek Konar said the company expects the new EV charging stations to coexist with the current fuel infrastructure. "An average Pilot Flying J location is about 10 acres," Konar said. "This will be in addition to all of our gas pumps. The way I think about it is, this is a new source of energy that is going to coexist with gas for quite some time. We can debate how long, but we need to serve both groups of customers." Installing DC fast chargers at hundreds of Pilot's travel centers — aka truck stops — means there should be food, drinks, restrooms, WiFi and even showers available while you wait for an EV to charge. Pilot recently announced its “New Horizons” plan that will invest $1 billion in upgrading Pilot travel centers with more premium amenities, including expanded seating and lounge areas. While the exact amount of time it will take to charge an EV using these new stations will vary on the EV and its current state of charge, most EVs can refill from a low state of charge to around 80 percent in 20-30 minutes on a fast charger. The new stations are future-proofed to deliver up to 350 kW, a charge rate that few EVs today can handle.