Find or Sell Used Cars, Trucks, and SUVs in USA

2012 Lt W/2lt Used Turbo 1.4l I4 16v Manual Fwd Sedan Onstar on 2040-cars

Year:2012 Mileage:8746 Color: Suspension
Location:

San Antonio, Texas, United States

San Antonio, Texas, United States
Advertising:

Auto Services in Texas

WorldPac ★★★★★

Automobile Parts & Supplies, Automobile Parts, Supplies & Accessories-Wholesale & Manufacturers
Address: 2100 Handley Ederville Rd, Euless
Phone: (817) 590-8332

VICTORY AUTO BODY ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting, Automobile Parts & Supplies
Address: 3841 Apollo Rd, Portland
Phone: (361) 334-5775

US 90 Motors ★★★★★

Used Car Dealers, Wholesale Used Car Dealers
Address: 641 W Old US Highway 90, Balcones-Heights
Phone: (210) 438-9090

Unlimited PowerSports Inc ★★★★★

Auto Repair & Service, Automobile Storage, Boat Storage
Address: 12024 W Highway 290, Bula
Phone: (512) 894-4792

Twist`d Steel Paint and Body, LLC ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting
Address: 457A W Hufsmith Rd, Jersey-Village
Phone: (281) 640-1273

Transco Transmission ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Auto Transmission Parts
Address: 2109 Avenue H, Fulshear
Phone: (281) 342-8772

Auto blog

Refreshed 2014 Camaro confirmed for New York debut

Thu, 07 Mar 2013

We've already seen leaked specs and potential spy shots, but the refreshed 2014 Chevrolet Camaro will make its official debut at the New York Auto Show in a few weeks.
Besides a tweaked exterior and the possibility of a high-output LS7 under the hood, we really don't know much else about the 2014 Camaro, but here's hoping for an improved interior, too.
In addition to the refreshed Camaro, Chevrolet will also be showing off the recently introduced Chevrolet SS, making its debut on the auto show circuit, and we'll also get our first look at the C7 Corvette coupe and convertible side-by-side.

GM patent reveals new two-stage turbocharger

Fri, Jun 24 2016

Modern turbochargers may be some of the best ever made, but performance is something that engineers are always trying to improve. According to GM Inside News, General Motors (GM) is hoping to alleviate some of the negative aspects of a two-stage turbocharger setup with a newly-patented design. The patent, that was filed on May 19, 2016, reveals a clever bypass system that allows the engine, a four-cylinder unit, to optimize both the low-pressure and high-pressure inlets for its respective functions. According to the filing, a conventional two-stage turbocharger setup is engineered to allow both turbines to operate simultaneously at low and mid engine speeds. At high engine speeds, only the low-pressure turbine works. The setup can't isolate either the low or high pressure side, which can impair low-end performance. GM's new two-stage turbocharger setup looks to eliminate this by linking the high-pressure turbo to the exhaust manifold through the high-pressure inlet duct. The low-pressure turbo is attached to the high-pressure turbo by a low-pressure inlet duct, which is linked to a connecting channel. A single actuator that is housed in the exhaust manifold creates a bypass that can opens the high-pressure inlet or close the connecting channel. Depending on what the engine load and speed is, the ECU guides the actuator—a single rotating spindle with discs corresponding to flanges on the high and low pressure sides—to isolate one of the two turbos. Isolating the turbos allow the respective inlets to be engineered for the best possible fluid dynamic performance. The setup should increase performance and decrease lag. There's no word on what car this setup will make an appearance on, but it will most likely be used in premium vehicles before trickling down to the rest of GM's vehicles. Related Video: News Source: GM Inside News, AutoGuide via GM Authority Cadillac Chevrolet GM Technology Sedan turbo patent engine turbocharging

GM adds 1,200 jobs at Detroit-Hamtramck plant

Thu, Oct 22 2015

General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.