1966 Chevrolet Covair Monza " Corsa Clone" on 2040-cars
Kingman, Arizona, United States
THIS 1966 CHEVROLET CORVAIR MONZA " CORSA CLONE" IS A REALLY NICE CAR. 2ND OWNER CAR . THIS CAR LOOKS NEW. CALL NICK FOR MORE INFO @ 210-643-9488. THANKS. WATCH THE VIDEO BELOW TO SEE IT LIVE THANKS. THE CAR LOOKS LIKE A CORSA AND DOES HAVE A CORSA ENGINE IN IT.
|
Chevrolet Corvair for Sale
- 67 corvair 327 v8 kelmark conversion. project no reserve(US $2,000.00)
- Beautifully restored turbo-charged american racing mags(US $22,888.00)
- 1963 chevrolet corvair/monza convertible**manual top**clean**am/fm cassette*auto
- 1965 corviar, v8 conversion - aluminum 215 cu. in.
- 1962 corvair monza 900 red,2 door
- New lambrecht 1960 corvair
Auto Services in Arizona
Windshield Replacement Phoenix ★★★★★
Valley Express Auto Repair ★★★★★
Tj`s Speedometer Repair ★★★★★
Super Discount Transmissions ★★★★★
Sun Devil Auto ★★★★★
Storm Auto Glass ★★★★★
Auto blog
Weekly Recap: GM plans massive new paint shop at Chevy Corvette factory
Sat, May 23 2015General Motors is laying out some serious green to maintain the Chevy Corvette's expansive color palette. The automaker is breaking ground on a new paint shop this summer that's part of a $439-million investment to upgrade the 34-year-old Bowling Green, KY, factory that builds the Stingray. The massive new structure will total 450,000 square feet, nearly half the size of the current 1-million square-foot facility. Construction is expected to take two years and won't impact Corvette production. The upgrades include new robots that save paint and create a better finish, longer, more efficient ovens to bake in the finish, and LED lighting. There's also a dry scrubbing booth technology with a limestone handling system that eliminates waste. GM has invested $135 million in the factory in last four years for the changeover to build the C7 and to relocate its Performance Build Center to Bowling Green. The improvements continue to modernize the Kentucky factory, which has become a tourist attraction in its own right, as more than 56,000 enthusiasts visited it last year. The upgrades are part of a $5.4-billion investment GM confirmed in April that will remake its US footprint in the next three years. The Bowling Green expansion underscores GM's continued commitment to the Corvette, which sold nearly 38,000 copies around the world last year, an eight-year high. "With this major technology investment, we can continue to exceed the expectations of sports car buyers for years to come," North American manufacturing manager Arvin Jones said in a statement. OTHER NEWS & NOTES Takata recall hits 34 million vehicles The National Highway Traffic Safety Administration expanded the Takata airbag recall to an almost unthinkable 34 million vehicles on Tuesday. The recall is part of an agreement reached by the two sides where Takata admitted some of its airbag inflators have a defect, and the deal compels the company to comply with all future regulatory actions and investigations. Takata's airbag inflators were produced with "a propellant that can degrade over time" and lead to ruptures, NHTSA said. Six deaths have been attributed to the flaw worldwide. Investigations conducted by Takata, automakers, and others have not determined the exact cause of the inflator problem, but NHTSA said moisture appears to alter the propellant's chemical structure. It then ignites too rapidly, creates too much pressure that ruptures the inflator, and blasts shards of metal at passengers.
Lutz dishes dirt on GM in latest Autoline Detroit
Mon, 20 Jun 2011Bob Lutz sits down for Autoline Detroit - Click above to watch video after the jump
Autoline Detroit recently played host to Bob Lutz, and, as is always the case, the former General Motors vice chairman dished out some great commentary. Lutz was promoting his new book Car Guys vs. Bean Counters: The Battle for the Soul of American Business, and talk quickly turned to his role as it related to product development and high-level decision making at GM. While on the topic of brand management, Lutz revealed a few rather interesting tidbits about his former employer:
All Chevrolet vehicles were required to have five-spoke aluminum wheels and a chrome band up front, as part of the Bowtie brand's overall image.
GM cutting production at two plants
Thu, Feb 26 2015General Motors is continuing to adjust to excess supply of some of its brands' models. To get production more in line with the vehicles' actual demand, the automotive giant is idling two of its factories in North America in the coming months. The Orion Assembly plant is going to be down from March 9-13, according to an anonymous plant worker and another insider speaking to Automotive News. The factory builds the Chevrolet Sonic and Buick Verano, but there are plenty of both models sitting on dealer lots, including 216 days worth of Sonics, according to AN. The factory already had two idle periods announced to reduce the excess. In addition, downtime is scheduled at GM's "Flex" line at the Oshawa, Ontario, Canada, plant from April 13-17. This affects supply of the Chevrolet Camaro, Impala, Buick Regal and Cadillac XTS. Among them, the automotive giant has the largest supply of Regals ready for dealers with 213 days worth of them, according to AN. The future for the whole Oshawa factory is cloudy in general, though. There are rumors that it could close entirely in the future because the Camaro is leaving and the Regal and XTS might not last much longer than 2017. The Canadian government and the labor union there intend to put up a fight, though. News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing Buick Cadillac Chevrolet GM orion assembly oshawa plant idle