1966 Chevrolet Caprice 2-door Hard Top With A 396 - Runs/drives *no Reserve* on 2040-cars
Grand Coulee, Washington, United States
Chevrolet Caprice for Sale
- 1975 chevrolet caprice classic convertible - rare options - low reserve impala
- 1994 chevrolet caprice classic wagon 4-door 5.7l
- 1989 chevrolet caprice classic car 5.0l 305 survivor 54,000 miles clean excellen
- 1972 chevrolet caprice base hardtop 4-door 6.6l(US $25,000.00)
- Two one hard top one chop top no rust(US $3,800.00)
- 1994 chevrolet caprice classic wagon 4-door 5.7l(US $6,500.00)
Auto Services in Washington
Wolfsburg Motorwerks ★★★★★
Wise Chuck Motors ★★★★★
Three Lakes Automotive ★★★★★
Taylor Brake Service ★★★★★
T V G Inc ★★★★★
Superior Auto Body INC ★★★★★
Auto blog
2015 Chevy Spark will have lighter, smaller battery
Thu, May 15 2014As General Motors gets ready to release the 2015 Chevy Spark EV, it is retooling the Brownstown Battery Assembly to build a new battery system for the chirpy little electric car. The new Spark will lose a few pounds and kWh from its lithium-ion pack, but it will keep all of it's performance specs. The current Spark EV uses a 21-kWh lithium-ion battery pack with bits made by A123 Systems (known as B456 Systems during bankruptcy). For the 2015 model, GM is going to build a 19-kWh battery system in-house that will use 192 LG Chem cells. Losing a bit of energy capacity means that the battery system for the 2015 Spark EV will be 86 pounds lighter but it will keep the EPA-rated 82-mile range and 119 MPGe. The 2015 Spark EV also keeps its $26,685 (plus destination) starting price from the 2014 model. The car will once again qualify for a federal tax credit of up to $7,500. LG Chem also supplies the cells for GM's other plug-in vehicles from its facility in Western Michigan. The Brownstown production line currently builds the battery packs for the Chevy Volt, the Opel Ampera and the Cadillac ELR. You can read our first drive of the 2014 Chevy Spark here. Brownstown Battery Assembly Expands Capabilities Will build battery system for 2015 Chevrolet Spark EV 2014-05-14 DETROIT – General Motors will bring all its electric vehicle battery building capabilities in-house with production of battery systems for the 2015 Chevrolet Spark EV at its battery assembly plant in Brownstown, Mich. "Using our in-house engineering and manufacturing expertise enabled us to deliver a battery system that is more efficient and lighter than the 2014 Spark EV without sacrificing range," said Larry Nitz, executive director of GM global transmission and electrification engineering. "Our successful working relationship with LG Chem has allowed us to deliver a new battery system for the Spark EV that helps us to better leverage our economies of scale." A newly designed battery system features an overall storage capacity of 19 kWh and uses 192 lithium ion cells. The cells are produced at LG Chem's plant in Holland, Mich. The battery system weight of 474 lbs. is 86 pounds lighter than the system in the 2014 Spark EV. The Spark EV battery is built on a dedicated production line at Brownstown, which also manufactures complete battery packs for the Chevrolet Volt, Opel Ampera and Cadillac ELR.
Weekly Recap: Racing legend Jim Hall explains Chevy's futuristic Chaparral concept
Sat, Nov 22 2014"I said our cars are built to be winners." – Jim Hall Racing legend Jim Hall never thought he'd be a video game consultant, but when Chevrolet asked for his advice to create a futuristic Chaparral for the Vision Gran Turismo series, he was eager to help. He reviewed early sketches and suggested some changes that made it onto the concept, including the addition of a camera that's mounted onto a mast over the cabin to aid the driver. The Chevy Chaparral 2X Vision Gran Turismo concept was revealed this week at the Los Angeles Auto Show and will be part of a downloadable update for PlayStation 3's Gran Turismo 6 in December. Theoretically, at least, it uses a laser-beam propulsion system and an air-powered generator to produce 900 horsepower in the video game. It's capable of sprinting to 60 miles per hour in 1.5 seconds en route to a top speed of 240 mph. Those gaudy performance specs – even in the virtual world – came at Hall's urging. "I said our cars are built to be winners," Hall told Autoblog on the floor of the Los Angeles show. The 79-year-old drove Lotus racecars in Formula One before launching the successful Chaparral Cars in the 1960s. Like his innovative Can-Am racers, the Vision Gran Turismo project has an eye toward the future. It also introduces the iconic Chaparral name to a new generation of fans, and hopefully, Hall says, gets them excited about engineering and design. "It emulates what we did in the '60s," he said. And what they did back then still resonates. Chaparral Racing and Chevy partnered more than 45 years ago for development work on the composite monocoque chassis, lightweight alloy powertrains, automatic gearboxes and active aerodynamics. "He [Hall] walked right back into this and was able to apply thinkings and learnings," said Clay Dean, General Motors executive director of advanced design. The Chevy Chaparral 2X Vision Gran Turismo concept was created at GM's North Hollywood advanced design studio, and it will be on display at the show through November. Other News and Views Sebastian Vettel joins Ferrari team in 2015 Ferrari confirmed that four-time Formula One World Champion Sebastian Vettel will join the Scuderia for the 2015 season, jettisoning Ferrari's current ace, two-time champ Fernando Alonso. Vettel has been F1's most successful driver since Michael Schumacher, though he's struggled to match his previous accomplishments in 2014.
LG Chem's troubled Chevy Volt battery plant hiring once again
Thu, Sep 25 2014The Michigan battery plant known for paying its workers to do nothing has turned things around and is now hiring more workers, specifically to do something. South Korea-based LG Chem, which runs the factory to supply the Chevrolet Volt extended-range plug-in vehicle with its lithium-ion batteries, held a job fair recently to bring on 40 new employees in order to meet higher battery demand, according to WZZM, the ABC affiliate for Grand Rapids, MI. The LG Chem factory is in Holland, MI, about 30 miles west of Grand Rapids, and it made its first batteries last year. Prior to that, though, the factory gained notoriety after a US Department of Energy (DOE) probe found that workers there were getting paid to do, well, nothing. That's because demand for the battery packs was so low that it cost less for the plant to sit idle. The DOE was conducting the probe because of its financial grant to LG Chem. But that was then and today is today. LG Chem is looking to ramp up production in advance of the second-generation Volt. That 2016 model-year version is said to have a longer all-electric range and better performance and will ride on a new chassis, but few official details have surfaced. We will know more when we get our first look at the car at the Detroit Auto Show in January.