2007 Chevy 3500 Hd Duramax Dually 4x4 on 2040-cars
Bluefield, West Virginia, United States
Body Type:ALUMINUM FLAT BED
Vehicle Title:Rebuilt, Rebuildable & Reconstructed
Engine:DURAMAX DIESEL
Fuel Type:Diesel
For Sale By:Private Seller
Model: C/K Pickup 3500
Trim: DUALLY
Options: 4-Wheel Drive
Drive Type: 4X4
Safety Features: Driver Airbag, Passenger Airbag
Mileage: 47,632
Power Options: Air Conditioning
Sub Model: 3500HD
Exterior Color: White
Interior Color: Black
Warranty: Vehicle does NOT have an existing warranty
Number of Cylinders: 8
2007 CHEVY 3500 DURAMAX 4X4 DUALLY WITH ALLISON TRANSMISSION
NEW 9 FOOT ALUMINUM FLAT BED
NEW ALUMINUM TOOL BOX
NEW ALUMINUM HYDRAULIC TANK
12,000 LB. HYDRAULIC WINCH
GOOSENECK HITCH
REAR HITCH
TINTED WINDOWS
DEEZEE STEP BARS
**THIS IS TRUCK HAS A RECONSTRUCTED TITLE**
FOR ANY ADDITIONAL INFORMATION ON THIS TRUCK PLEASE CONTACT JAYSON AT 304-320-2938
********DEPOSIT OF $500 MUST BE MADE WITHIN 24 HOURS OF WINNING********
Chevrolet C/K Pickup 3500 for Sale
- Dump truck with 11 ft bed 1994 3500
- 1950 style bagged 78 chevy shop truck full kustom crew cab dually one of a kind
- 1948 chevrolet truck-ck3500(US $45,000.00)
- 2000 chevrolet 3500 one ton diesel crew cab(US $7,750.00)
- No reserve ! chevrolet utility 3500 cold ac runs great att truck high bid wins!
- 1993 chevrolet c3500 crew cab dually 6.5 diesel 4l80e trans
Auto Services in West Virginia
Zim`s Tire & Auto Svc ★★★★★
Taylor Auto Body ★★★★★
Ramey Save A Lot ★★★★★
Price Brothers Garage ★★★★★
Outcast Bug & Buggy Shop ★★★★★
Lee`s Auto & Small Engine Repair ★★★★★
Auto blog
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.
GM to idle car production at five factories as Americans continue CUV love affair
Mon, Dec 19 2016In case you needed another reminder that Americans have fallen out of love with sedans, General Motors today announced plans to idle five factories in January in a bid to cut its inventory to 70 days. Detroit-Hamtramck Assembly ( Buick LaCrosse, Cadillac CT6, Chevrolet Volt and Impala) and Fairfax Assembly in Kansas ( Chevy Malibu) will stop production for three weeks. Lansing Grand River ( Cadillac ATS and CTS, and Chevy Camaro) is going down for two weeks, while Lordstown, OH ( Chevy Cruze) and Bowling Green, KY ( Chevy Corvette) will go idle for a week each, Automotive News reports. GM's shutdown reflects a broader problem with the company's supply – at 847,000 vehicles, the company's supply increased unsteadily from a low of 629,000 units in January of 2016. That's more than a 25 percent increase in the past year. Citing information from Autodata, The Detroit News reports that at the end of November, GM had a 168-day supply of LaCrosses, 177 days' worth of Camaro, 170 days of Corvette, 121 days for Cruze, 119 days for ATS, 132 days for CTS, and 110 days of CT6. Meanwhile, inventory of the company's more popular vehicles is actually below the professionally accepted 60- to 70-day supply, The News reports. The Trax, Colorado pickup, and GM's full-size SUVs are sitting below 50 days and experiencing year-over-year sales increases. GM needs a rethink of its inventory levels, which is something that's apparently coming. "We're going to be responsible in managing our inventory levels," GM spokesman Jim Cain told The News. Another unnamed spokesman told Automotive News the company's day-to-day supplies would "fluctuate before moderating at year-end." But at least one analyst thinks this won't be the last time Detroit needs to stop production to level things out. "Incentives are elevated, residuals are declining, and rates are rising," Brian Johnson, an analyst with Barclays, told The News. "And while GM in particular may benefit in the months ahead from new product launches, it's important to recognize that GM's inventory is elevated at the moment, and it wouldn't surprise us if they need to announce another production cut – which could pressure the stock." Related Video: News Source: The Detroit News, Automotive News - sub. req.Image Credit: Paul Sancya / AP Plants/Manufacturing Buick Cadillac Chevrolet GM GMC Crossover SUV Sedan bowling green cadillac xt6 fairfax
GM cutting production at two plants
Thu, Feb 26 2015General Motors is continuing to adjust to excess supply of some of its brands' models. To get production more in line with the vehicles' actual demand, the automotive giant is idling two of its factories in North America in the coming months. The Orion Assembly plant is going to be down from March 9-13, according to an anonymous plant worker and another insider speaking to Automotive News. The factory builds the Chevrolet Sonic and Buick Verano, but there are plenty of both models sitting on dealer lots, including 216 days worth of Sonics, according to AN. The factory already had two idle periods announced to reduce the excess. In addition, downtime is scheduled at GM's "Flex" line at the Oshawa, Ontario, Canada, plant from April 13-17. This affects supply of the Chevrolet Camaro, Impala, Buick Regal and Cadillac XTS. Among them, the automotive giant has the largest supply of Regals ready for dealers with 213 days worth of them, according to AN. The future for the whole Oshawa factory is cloudy in general, though. There are rumors that it could close entirely in the future because the Camaro is leaving and the Regal and XTS might not last much longer than 2017. The Canadian government and the labor union there intend to put up a fight, though. News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing Buick Cadillac Chevrolet GM orion assembly oshawa plant idle