2000 Chevy 3500 Truck, Runs Great, Only 108,000 Miles on 2040-cars
Forest, Ohio, United States
Vehicle Title:Clear
Engine:350 c.i.
Fuel Type:Gasoline
For Sale By:Private Seller
Transmission:Automatic
Make: Chevrolet
Cab Type (For Trucks Only): Regular Cab
Model: C/K Pickup 3500
Warranty: Vehicle does NOT have an existing warranty
Trim: pick up
Options: Cassette Player, Leather Seats
Drive Type: 2 wheel drive
Safety Features: Anti-Lock Brakes, Driver Airbag, Passenger Airbag
Mileage: 108,000
Power Options: Air Conditioning, Cruise Control
Exterior Color: White
Interior Color: Gray
Number of Cylinders: 8
Disability Equipped: No
Selling or trading my 2000 1 ton chevy. Truck runs great but I do not need 2 trucks. Engine runs great, transmission shifts great, tires are in excellent condition. Tires are 10 ply tires not cheap car tires. Alternator and battery less than one year old. Comes with fifth wheel rails installed in bed. (fifth wheel available for extra cost). Air Conditioning and Heat both work great, Rear Reese style hitch was new 2 years ago. Truck has rust on wheel wells, cab corners and bottom of doors. Has new electric brake box installed last summer. Truck needs one 1 of the inside door handles hooked back up. The tailgate needs new hinges (can be purchased at autozone), Seats are in pretty good shape with some wear. Interior is in good condition. Let me know if you have any other questions. Thank you and happy bidding.
Chevrolet C/K Pickup 3500 for Sale
1987 chevrolet dually 4x4 crew cab 1 ton
It is a heavy duty c3500 with 6.5 desiel engine.(US $5,500.00)
1988 chevy 3500 with boss v snow plow
2000 chevrolet 3500 silverado 4wd quad cab(US $5,600.00)
1976 chevy 3500 dump truck
1990 chevrolet c/k pickup c3500, 1 ton dually and pop-up camper(US $3,900.00)
Auto Services in Ohio
Whitesel Body Shop ★★★★★
Walker`s Transmission Service ★★★★★
Uncle Sam`s Auto Center ★★★★★
Trinity Automotive ★★★★★
Trails West Custom Truck 4x4 Super Center ★★★★★
Stone`s Auto Service Inc ★★★★★
Auto blog
Should heavy-duty pickup trucks have window stickers with fuel mileage estimates?
Sat, Sep 23 2017If you were to stroll into your nearest Chevrolet, Ford, GMC, Nissan, or Ram dealership, you'd find a bunch of pickup trucks. Most of those would have proper window stickers labeled with things like base prices, options prices, location of manufacture, and, crucially, fuel economy estimates. But you'd also run across a number of heavy-duty trucks with no such fuel mileage data from the Environmental Protection Agency. The EPA doesn't require automakers to publish the valuable miles-per-gallon measurement for vehicles with gross weight ratings that exceed 8,500 pounds. That makes it difficult for consumers to compare behemoths powered by turbocharged diesel engines – between one another, and between smaller, gasoline-fueled trucks. Consumer Reports doesn't think it should be this way, and it's spearheading an effort (PDF link) to get the government to require manufacturers to publish fuel economy estimates. In its own testing, CR found that heavy-duty pickups powered by Ford's Power Stroke, GM's Duramax, and FCA's Cummins diesel engines (which doesn't include the Ram's EcoDiesel) get worse fuel mileage than their lighter-duty gas-powered siblings. We're not so sure HD-truck buyers are unaware of this fact – big diesels don't really come into their own until big loads are placed in their beds or attached to their trailer hitches. Under heavy workloads, the diesel trucks will almost certainly return greater efficiency than a similar gas-powered truck. What's more, HD trucks with lumbering diesels in general make the driver feel more confident while towing due to greater torque at low engine RPM than gas trucks. They also offer greater max-weight limits. Still, we agree EPA fuel mileage estimates should be offered for heavy-duty pickups. And we think the comparisons provided by Consumer Reports might be interesting to potential buyers. Click here to see the results of CR's tests, and let us know what you think using the poll below. Related Video: Featured Gallery 2017 Ford F-Series Super Duty: First Drive View 22 Photos News Source: Consumer Reports Government/Legal Green Read This Chevrolet Ford GMC Nissan RAM Fuel Efficiency Truck Commercial Vehicles Diesel Vehicles poll gmc sierra hd chevy silverado hd
Buick Encore, Chevy Trax reportedly dead after 2022
Fri, Mar 18 2022The Buick Encore will not get an encore, and the Chevrolet Trax is dead in its tracks. Separate unverified reports say the two crossovers, which are essentially identical underneath the sheetmetal, will retire at the end of the 2022 model year without being directly replaced. Citing anonymous sources, enthusiast website GM Authority wrote that production of the Encore and the Trax is scheduled to end in the third quarter of 2022. Both models are manufactured in Bupyeong-gu, South Korea, and General Motors will reportedly use the extra production capacity to build more examples of the Trailblazer, which outsold the Encore and the Trax combined by a significant margin in 2021. General Motors hasn't commented on the report, but we wouldn't be surprised if the end is indeed near for the Encore and the Trax. Buick released the Encore for the 2013 model year, and Chevrolet launched the Trax for 2015, but the model made its debut as the Opel Mokka in 2012. It's at the end of its life cycle, and sales figures reflect this: 20,072 units of the Encore were sold in America in 2021, a drop of 52% compared to 2020, while 42,590 examples of the Trax found a home, a 60% decline. It's further proof that Americans don't like small cars. Viewed in that light, the decision not to replace either crossover makes perfect sense. If the report is accurate, the Encore GX (which is not related to the Encore in any way) will enter the 2023 model year as Buick's entry-level model. The situation is a little more complicated at Chevrolet: The pocket-sized Spark is on its way out in 2022 as well, meaning that the Trailblazer will become the entry point into the range. It's a different story in Europe: Opel, which is now part of the Stellantis group, released the second-generation Mokka in June 2020.
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.






