1992 Chevy Dually 454 4x4 5 Speed on 2040-cars
Lowville, New York, United States
92 chevy 454 four wheel drive 5 speed I bought the truck to put a plow on it and have since bought one with a plow I have gone threw all the lights and new front brakes and hoses and all new lines in the truck it was converted to carbarated before I bought it runs awesome and drive good as well I have the tail gate for it witch has no rust but needs hinges the truck has the good cast iron 5 speed please email me or call for more info 315-771-eight44eight thanks and good luck |
Chevrolet C/K Pickup 2500 for Sale
- Utility truck bi-fuel gas cng dual fuel chevrolet 2500 air conditioning cruise
- Government surplus vehicle!!! - 1998 chevrolet 2500 4wd ex cab!!
- 1956 chevrolet pickup 3200(US $18,500.00)
- Government surplus vehicle!!! - 2003 chevrolet 2500hd 2wd!
- No res! gmc chevrolet silverado sierra duramax 2500 3500 ford dodge powerstokee
- 1980 c/k 2500 4x4 custom deluxe(US $9,000.00)
Auto Services in New York
X-Treme Auto Glass ★★★★★
Wheelright Auto Sale ★★★★★
Wheatley Hills Auto Service ★★★★★
Village Automotive Center ★★★★★
Tim Voorhees Auto Repair ★★★★★
Ted`s Body Shop ★★★★★
Auto blog
Plug In 2014: VIA makes the case for 'free' plug-in hybrid work vans, trucks
Fri, Aug 1 2014If you're a fleet manager who's been waiting anxiously for the chance to buy a plug-in hybrid van from Via Motors, your wait is almost over. If you work for the right fleet, anyway. David West, the chief marketing efficer for VIA Motors, took AutoblogGreen for a ride around the San Jose Convention Center in a Via van sporting an Electric Blue paint job as part of the Plug In 2014 Conference this week and gave us an update on how things are coming along. The big news is that the Via PHEV van production is going to start by the end of September. Via can currently build two vans an hour at its production plant in Mexico, or about 16 a day and could easily double that. "That would get us to 20,000 a year with two full lines running," West said. "We have the capacity." "There is no way gas can compete with electric." – David West, Via Motors But they can't sell that many quite yet. By the end of December, around 350 Vans will be made, mostly for a $20-million program from the Department of Energy (DOE) and the South Coast Air Quality Management District that will see the vehicles used by fleets that will report energy data to the Idaho National Lab. Via is also finishing up CARB certification for both the van and the company's plug-in hybrid pick-up truck. About 50 percent of Via's technology in the truck will not need to be tested again, since it's the same as what's in the van, but things like crash tests will need to be done twice. Despite the progress, this is not where Via hoped it would be today. The bankruptcy of battery supplier A123, "took about a year off our timeline," West said. "It's been getting a little slow getting it to market, there have been some challenges, particuarly since we had the country's worst recession right in the middle of this wrap up, but it's inevitable in my mind. There is no way gas can compete with electric." Maybe that's why FedEx has expressed an interest in buying around 5,000 units, West said. FedEx already has some pilot vehicles, just like Verizon does, and PG&E wants to replace all of their gas trucks with electric vehicles, which would be another 3,000 sales, he said. Besides the fuel savings, vehicles like these, with easy on-site power generation, could also work wonders in post-disaster situations, he said, since they could replace the need for generators.
First 2014 Chevy Corvette Stingray spotted crashed in the wild
Tue, 12 Feb 2013This restyled blue 2014 Chevrolet Corvette Stingray is wearing manufacturer plates, and it appears to be the same one seen around the internet in various pictures lately. This crash is likely not part of the Chevrolet testing regimen, however. Digital Corvettes forum member gpetry posted the shot with a note: "got this picture e-mailed from a friend in Arizona last week..." No circumstances are given, other than the incident occurred in the thick of a set of curvy roads, and the coupe ping-ponged off a guardrail and into the rock wall. Hopefully everyone involved in the incident walked away.
It may not be a pretty thing to see, a crashed sports car that's not even available for sale yet, but rest easy. Many pre-production cars are used for development and then unceremoniously crushed and scrapped, anyway. If that's the case here, that makes this wrecked 'Vette less of a tragedy and more of a case of exceptional efficiency.
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.