Find or Sell Used Cars, Trucks, and SUVs in USA

1967 Short Bed Fleetside Factory A/c 283 Power Glide Power Steering Bucket Seats on 2040-cars

Year:1967 Mileage:333493
Location:

O'Fallon, Missouri, United States

O'Fallon, Missouri, United States
Advertising:

 1967 chevy in excellent condition. Light blue with white roof. Factory air conditioning and bucket seats. 8 cylinder engine with automatic transmission. Buyer responsible for shipping. Call or email Chris at: (314) 280-1752

Auto Services in Missouri

Yocum Automotive ★★★★★

Auto Repair & Service, Auto Oil & Lube, Tire Dealers
Address: 906 US Highway 60 E, Halltown
Phone: (417) 732-6430

Wright Automotive ★★★★★

Auto Repair & Service, Auto Oil & Lube, Truck Service & Repair
Address: 109 James St, Rayville
Phone: (816) 532-8982

Winchester Cleaners ★★★★★

Auto Repair & Service, Drapery & Curtain Cleaners, Dry Cleaners & Laundries
Address: 14622 Manchester Rd, Saint-Ann
Phone: (636) 227-7884

Taylor`s Auto Salvage ★★★★★

New Car Dealers, Automobile Body Repairing & Painting, Used Car Dealers
Address: 6898 Saint Charles Rock Rd, Overland
Phone: (314) 726-6181

STS Car Care & Towing ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Towing
Address: 6507 W Florissant Ave, Jennings
Phone: (314) 658-9559

Stepney`s Towing ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting, Automobile Parts & Supplies
Address: Brentwood
Phone: (314) 713-2079

Auto blog

GM will make Chevy Volt production announcement tomorrow

Mon, Apr 7 2014

Thing are apparently happening to get the next-generation Chevy Volt ready for public consumption. The most obvious proof is in a preview of an announcement (possibly coming tomorrow) that the two main places where General Motors gets the Volt ready -the Detroit-Hamtramck Assembly Plant and the Brownstown Township battery assembly facility - will be getting big money upgrades and lots of new positions. The Hamtramck plant builds the Volt and its fancier cousin, the Cadillac ELR, as well as the global versions of the Volt. The Detroit News reports that GM will add 1,400 jobs and spend roughly $450 million at the two locations in order to build the redesigned Volt. What's less clear is exactly what the updates will bring us. We've heard that the new volt will be a 2016 model and come on a new chassis. Speculation in The Detroit News about tomorrow's announcement runs the gamut from a new compact PHEV with less electric range and a lower price (which makes sense) to an updated Volt with more electric range (heard it before) to a new all-electric vehicle (the moon shot). If there's any hints to be gleaned in the international Volts, there are also reports coming in that the Opel brand will get an all-electric vehicle that is cheaper than the Ampera. Read into that what you will. We pestered GM's Kevin Kelly on the new Volt (again) and he said (again) that he couldn't give out any more detail other than what's been reported. He just told AutoblogGreen that there will be an announcement tomorrow and that it will be about the Hamtramck and Brownstown facilities and involve the Volt. So, stay tuned.

First 2014 Chevy Corvette Stingray spotted crashed in the wild

Tue, 12 Feb 2013

This restyled blue 2014 Chevrolet Corvette Stingray is wearing manufacturer plates, and it appears to be the same one seen around the internet in various pictures lately. This crash is likely not part of the Chevrolet testing regimen, however. Digital Corvettes forum member gpetry posted the shot with a note: "got this picture e-mailed from a friend in Arizona last week..." No circumstances are given, other than the incident occurred in the thick of a set of curvy roads, and the coupe ping-ponged off a guardrail and into the rock wall. Hopefully everyone involved in the incident walked away.
It may not be a pretty thing to see, a crashed sports car that's not even available for sale yet, but rest easy. Many pre-production cars are used for development and then unceremoniously crushed and scrapped, anyway. If that's the case here, that makes this wrecked 'Vette less of a tragedy and more of a case of exceptional efficiency.

Huge, pricey trucks haul jobs and profits for the Detroit Three

Tue, Feb 5 2019

DECATUR, Texas — Mickey McMaster is on his 12th pickup truck. The 61-year old farm equipment dealer in Decatur, Texas, two weeks ago treated himself to a 2019 GMC Denali for around $69,000 — a reward for long hours at work. "For me this is the Cadillac of trucks, it's a real luxury vehicle," McMaster said. "I've worked my way up to afford a truck like this and it shows that I've earned it." McMaster is the kind of customer General Motors Co is banking on as it plans to add 1,000 jobs at a plant in Flint, Michigan that will build a new generation of its largest pickups. Demand from Texas and other heartland states for big pick-ups is providing a lifeline to many workers the No. 1 U.S. automaker is laying off at plants elsewhere. The Detroit Three automakers and thousands of their U.S. workers are counting on customers like McMaster to keep buying bigger and more luxurious pickup trucks even if overall U.S. vehicle demand weakens this year, as most analysts predict. At Flint, GM will build a new generation of its heavy-duty Chevrolet Silverado and GMC Sierras, including luxury models that are some of the most profitable vehicles on the planet. GM, Ford Motor Co and Fiat Chrysler Automobiles NV's Ram division own the segment and are each doubling down with new or redesigned models launching this year. Sales of heavy-duty pickups in the United States have grown to more than 600,000 vehicles a year, up more than 20 percent since 2013, according to industry data. Prices for luxury models can easily top $70,000. GM on Tuesday celebrated the launch of a new generation of heavy-duty GMC and Chevrolet pickups at the assembly plant in Flint, Michigan, that is now building all such trucks for the company. At the same time that GM is laying off thousands of U.S. workers and planning to shutter five North American factories, Flint is hiring. The plant runs on three daily shifts, six days a week. As the new model's assembly system ramps up, the plant's capacity will increase by more than 25 percent, plant manager Mike Perez told Reuters. The Flint plant plans to add 1,000 workers, more than half of the 1,500 factory workers who have asked to transfer from plants GM has targeted for shutdown as part of CEO Mary Barra's restructuring plan. "We're bringing in 50 to 100 people every week," said Perez. Workers last week were still finishing the job of retooling the Flint factory to build the new heavy-duty trucks as part of a $1.5 billion investment project.