1965 Chevy Fleetside Short Bed on 2040-cars
Oakland, California, United States
Body Type:fleetside/short bed
Engine:350ci
Vehicle Title:Clear
Fuel Type:Gasoline
For Sale By:owner
Number of Cylinders: 8
Make: Chevrolet
Model: C-10
Trim: none
Cab Type (For Trucks Only): Regular Cab
Warranty: none
Drive Type: rear 2w
Mileage: 0
Exterior Color: Tan
1965 Chevy shortbed fleetside w/ large rear window. Excellent running truck with 350ci engine and 3 speed sychromesh gearbox - rolling shift into first smoothly - on the floor. Truck drives and feels solid on the road. Last decade or so, mostly used on the ranch for hay. Dual exhaust with H-pipe is solid and quiet for duals. Runs fine cold or warm. Runs at an even temp with no heating issues. Original bed wood is going, but mostly there and rails and HW are there for resto. Manual Brakes function perfectly and clutch grabs with no slippage. Manual Steering feels solid and truck doesn't wander. All lights and signals work well, save for the slightly sticky HL switch with has dirty contacts that sometimes need twisting side to side to switch on. Hood opens and shuts very well, doors open and shut very well (in spite of pictured funky repair) and locks and handle all work perfect. Tires are dry, but roadworthy. See all details for disclosed rusty spots and various stuff you'd want to me to tell you about before you'd buy it, etc. Please ask any questions before bidding. Buyer will be responsible for arrangement of and payment for transport. Seller will help with any arrangements if needed.
Chevrolet C-10 for Sale
- 1969 chevrolet c-10 step side short bed project(US $2,500.00)
- 454 cid v8, th400 3-speed auto, a/c, power steering & brakes, oak bed, bench sea(US $16,995.00)
- 1976 scottsdale k-10.. 4x4.. 33k actual miles. original documentation. 350 v8
- 1969 chevy cst 396 big block(US $2,850.00)
- 70 chevrolet c10 stepside pickup
- 1972 chevy c10 black project pickup truck v8 350 turbo 350 at 8ft bed
Auto Services in California
Yuki Import Service ★★★★★
Your Car Specialists ★★★★★
Xpress Auto Service ★★★★★
Xpress Auto Leasing & Sales ★★★★★
Wynns Motors ★★★★★
Wright & Knight Service Center ★★★★★
Auto blog
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.
Crash victim found still inside car 6 hours after it was towed away [w/video]
Wed, Jan 7 2015Police near Dayton, OH, have quite a confusing case on their hands after the victim of a crash early on New Year's Day couldn't initially be found. Six hours later, the man was discovered lying on the vehicle's floorboard at the tow yard. The unidentified person was admitted to a local hospital in critical condition with possible leg injuries. The police first responded to the scene of the crash around 3:00 am on New Year's Day when a Chevrolet Impala hit a utility pole and drove through a fence, according to WHIO News. The authorities claim that they searched for the man for an hour and a half and came up with nothing. The car was then hauled away to the yard, which was only about 500 feet away. The tow yard worker found the man around 9:00 am and called 911. However, he was clearly dubious about the injured man's predicament and suggested to the operator that he might have returned to the Impala. Police are still investigating the incident. According to WHIO, authorities might have somehow missed the man in the sedan during the search. Alternatively, he could have left the scene of the accident and later returned. Watch the video below for more about this bizarre case. The video meant to be presented here is no longer available. Sorry for the inconvenience. News Source: WHIO via Yahoo Autos Chevrolet Police/Emergency Videos Sedan
GM cutting production at two plants
Thu, Feb 26 2015General Motors is continuing to adjust to excess supply of some of its brands' models. To get production more in line with the vehicles' actual demand, the automotive giant is idling two of its factories in North America in the coming months. The Orion Assembly plant is going to be down from March 9-13, according to an anonymous plant worker and another insider speaking to Automotive News. The factory builds the Chevrolet Sonic and Buick Verano, but there are plenty of both models sitting on dealer lots, including 216 days worth of Sonics, according to AN. The factory already had two idle periods announced to reduce the excess. In addition, downtime is scheduled at GM's "Flex" line at the Oshawa, Ontario, Canada, plant from April 13-17. This affects supply of the Chevrolet Camaro, Impala, Buick Regal and Cadillac XTS. Among them, the automotive giant has the largest supply of Regals ready for dealers with 213 days worth of them, according to AN. The future for the whole Oshawa factory is cloudy in general, though. There are rumors that it could close entirely in the future because the Camaro is leaving and the Regal and XTS might not last much longer than 2017. The Canadian government and the labor union there intend to put up a fight, though. News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing Buick Cadillac Chevrolet GM orion assembly oshawa plant idle