1963 Chevy Short Bed Stepside Pick Up on 2040-cars
Black Mountain, North Carolina, United States
Engine:383 stroker
Vehicle Title:Clear
Mileage: 89,204
Make: Chevrolet
Exterior Color: Red
Model: C-10
Interior Color: Gray
Trim: Retro Rod
Drive Type: shift kit GM automatic with B&M shifter
Options: Leather Seats
Chevrolet C-10 for Sale
Auto Services in North Carolina
Xtreme Detail ★★★★★
Winston Road Automotive ★★★★★
Whites Tire Svc ★★★★★
Whites Tire Svc ★★★★★
Westgate Imports ★★★★★
West Jefferson Chevrolet ★★★★★
Auto blog
GM cutting production at two plants
Thu, Feb 26 2015General Motors is continuing to adjust to excess supply of some of its brands' models. To get production more in line with the vehicles' actual demand, the automotive giant is idling two of its factories in North America in the coming months. The Orion Assembly plant is going to be down from March 9-13, according to an anonymous plant worker and another insider speaking to Automotive News. The factory builds the Chevrolet Sonic and Buick Verano, but there are plenty of both models sitting on dealer lots, including 216 days worth of Sonics, according to AN. The factory already had two idle periods announced to reduce the excess. In addition, downtime is scheduled at GM's "Flex" line at the Oshawa, Ontario, Canada, plant from April 13-17. This affects supply of the Chevrolet Camaro, Impala, Buick Regal and Cadillac XTS. Among them, the automotive giant has the largest supply of Regals ready for dealers with 213 days worth of them, according to AN. The future for the whole Oshawa factory is cloudy in general, though. There are rumors that it could close entirely in the future because the Camaro is leaving and the Regal and XTS might not last much longer than 2017. The Canadian government and the labor union there intend to put up a fight, though. News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing Buick Cadillac Chevrolet GM orion assembly oshawa plant idle
GM announces net 220 job increase as Trump visits Michigan
Wed, Mar 15 2017GM announced today that about 900 jobs would be added (or, importantly, retained) ahead of President Trump's arrival in Michigan, where he is expected to discuss his plan to roll back fuel economy standards. The timing of the announcement is almost certainly not coincidental, as appending it to a Trump visit gives it a higher profile and dovetails with the President's jobs agenda. It's less likely the decision itself was made for those reasons, but the free PR boost is a nice bonus. As for those 900 jobs themselves, they aren't all new jobs. The only net gain is approximately 220 jobs at the Romulus Powertrain Plant, which produces the 10-speed automatic transmission that's proliferating through the company's lineup. The 180 jobs at Flint Assembly and 500 jobs at Lansing Delta Township are retained jobs – that is to say, spots the company found for workers who would otherwise have been laid off. By the way, the Flint jobs will help with production of heavy-duty pickups, and the Lansing jobs are to produce the Chevrolet Traverse and Buick Enclave. Finding jobs for manufacturing workers in the auto sector, whether new or retained, is admirable. No matter how GM couches it, the company has created or retained a total of 7,000 jobs this year, and its total reinvestment in US production is around $1 billion. But these decisions are business ones, not political ones – timing the announcements to make them seem inspired by economic policy, or the political situation, is simply smart PR. Related Video: Image Credit: Bill Pugliano/Getty Images Celebrities Government/Legal Buick Cadillac Chevrolet GMC
UAW to vote on strike at Kentucky Corvette plant
Tue, 08 Apr 2014The current wait time for a new Chevrolet Corvette Stingray is well, not short. With word of a strike at the Bowling Green, KY factory responsible for seventh-generation sports car, though, that wait time could end up growing substantially.
Now, a strike is still a ways off. UAW Local 2164, which represents the 800 workers responsible for screwing the Corvette together, is set to vote on authorizing a strike today, but even if the employees give the action a go, it's far from a sure thing. According to The Tennessean, both regional and national union officials would need to put their stamp of approval on strike action.
"The membership has to vote to strike, but it's just a step in the process," said Gary Casteel, the UAW's Region 8 director and one of the people that would need to authorize a strike action. Casteel told The Tennessean, "It's purely a local situation, though. They are having some issues with the local management."