1957 Chevy Bel Air . 2 Door Post -- Mini Tubbed on 2040-cars
Clinton Township, Michigan, United States
Body Type:Sedan
Vehicle Title:Clear
Engine:8
Fuel Type:Gasoline
For Sale By:Private Seller
Model: Bel Air/150/210
Trim: Belair
Options: CD Player
Drive Type: 454
Power Options: Power Seats
Mileage: 0
Exterior Color: Silver
Interior Color: Gray
Warranty: Vehicle does NOT have an existing warranty
Number of Cylinders: 8
Number of Doors: 2
Chevrolet Bel Air/150/210 for Sale
- 1957 chevy 2dr 150 series project black widow clone
- 283 v8, 2 tone, auto, 25k, near mint, one owner, garage kept, no winters(US $7,200.00)
- Blue & white classic '55 chevy, super good daily driver
- 1957 chevrolet 210 2-door post chevrolet hot rod
- 1959 chevrolet biscayne barnfind
- 1957 chevrolet 210(US $14,500.00)
Auto Services in Michigan
Xpert Automotive Repair ★★★★★
White`s Muffler & Brakes ★★★★★
Westwood Auto Parts ★★★★★
West Michigan Collision ★★★★★
Wells-Car-Go ★★★★★
Ward Eaton Towing ★★★★★
Auto blog
Chevrolet Colorado ZR2 concept suggests a diesel off-road future
Thu, Nov 20 2014"It takes the Colorado to a whole new place." – Mark Reuss The Chevrolet Colorado looks set to gain a more capable off-road version, with the company previewing a potential design direction with a ruggedized concept Wednesday at the Los Angeles Auto Show. Called the Colorado ZR2, the concept brings back the name used on off-road-tuned S-10 and Blazer models in the 1990s and 2000s. The ZR2 has a track that's four inches wider than the Colorado Z71, which is currently the line's most capable off-roader. The ZR2 is fitted with a new grille, power-dome hood, custom wheel flares and off-road-style fascia that reduces overhang and has flip-out aluminum tow hooks. It's all slathered in an outdoorsy hue dubbed Cyprus Green. The are electronic locking front and rear differentials, skid plates and mono-tube coilover shock absorbers. It all rolls (or crawls) on 275/65R18 off-road tires wrapped around custom 18-inch aluminum wheels. There's also a spare tire assembly mounted in the bed, which has a spray-in liner and 48-inch lift jack should things go afoul on the trail. "It takes the Colorado to a whole new place," Mark Reuss, General Motors executive vice president of global product development, said at the reveal. Power comes from the 2.8-liter Duramax diesel engine making 181 horsepower and 369 pound-feet of torque. This engine will arrive later in the year in the production Colorado. While the ZR2 remains only a concept, it suggests a new path for the Colorado – one we hope Chevy decides to take. Chevrolet Introduces Colorado ZR2 Concept Aggressively styled, more capable and driven by new 2.8L Duramax diesel engine LOS ANGELES – Chevrolet today introduced the Colorado ZR2 concept – a vision of how Chevrolet could take the all-new midsize truck's off-road capability to the next level. It also showcases the new 2.8L Duramax diesel engine that will arrive in the Colorado lineup later next year. The aggressively styled concept builds on the capabilities of the production Colorado Z71 and advances the legacy of Chevrolet's previous ZR2 production models. "From the bold stance to the trail-ready special equipment, the Colorado ZR2 is all about the fun of driving where the pavement ends – and doing it in characteristic Chevy style," said Tony Johnson, Colorado marketing manager.
GM cutting Chevy Sonic, Buick Verano production [UPDATE]
Sun, Jan 25 2015UPDATE: A previous version of this story indicated that Orion Assembly would be idled for seven weeks, from February 16 through April 6. This was incorrect. The factory will instead only be idled for the weeks of February 16 and April 6. The story has been edited to reflect this. General Motors has announced that the factory responsible for the Buick Verano and Chevrolet Sonic will be idled for the weeks of February 16 and April 6, with blame being placed on excess supply. The Orion Assembly plant, about 45 minutes north of GM's Renaissance Center headquarters, employs about 1,800 people, but they'll be given a pair of furloughs as inventories of the sub-compact Sonic and premium compact Verano reach 127 days and 84 days, respectively. That works out to 26,600 Chevys and 9,800 Buicks waiting for buyers. According to Automotive News, the compact Chevy sales bested the industry average in 2014, jumping up nine percent versus the the overall segment's eight-percent gain, while the Buick sedan's sales were down four percent. When asked about the shutdown, a GM spokesman told AN that it will "build to market demand," while also pointing out that the company did not comment on production plans. News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing Buick Chevrolet GM buick encore orion assembly
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.