1957 Chevrolet Bel Air/150/210 Hardtop on 2040-cars
Transmission:Automatic
Fuel Type:Gasoline
For Sale By:Dealer
Vehicle Title:Clean
Engine:--
VIN (Vehicle Identification Number): vc57n125236
Mileage: 53045
Interior Color: Black
Warranty: Unspecified
Trim: Hardtop
Number of Seats: 2
Make: Chevrolet
Exterior Color: Red
Model: Bel Air/150/210
Features: --
Power Options: --
Chevrolet Bel Air/150/210 for Sale
- 1955 chevrolet bel air/150/210 restomod(US $108,000.00)
- 1955 chevrolet bel air/150/210(US $19,199.00)
- 1957 chevrolet bel air/150/210(US $155,000.00)
- 1962 chevrolet bel air/150/210(US $37,962.00)
- 1955 chevrolet 210 delray club coupe(US $100.00)
- 1955 chevrolet bel air/150/210(US $5,000.00)
Auto blog
Plug In 2014: VIA makes the case for 'free' plug-in hybrid work vans, trucks
Fri, Aug 1 2014If you're a fleet manager who's been waiting anxiously for the chance to buy a plug-in hybrid van from Via Motors, your wait is almost over. If you work for the right fleet, anyway. David West, the chief marketing efficer for VIA Motors, took AutoblogGreen for a ride around the San Jose Convention Center in a Via van sporting an Electric Blue paint job as part of the Plug In 2014 Conference this week and gave us an update on how things are coming along. The big news is that the Via PHEV van production is going to start by the end of September. Via can currently build two vans an hour at its production plant in Mexico, or about 16 a day and could easily double that. "That would get us to 20,000 a year with two full lines running," West said. "We have the capacity." "There is no way gas can compete with electric." – David West, Via Motors But they can't sell that many quite yet. By the end of December, around 350 Vans will be made, mostly for a $20-million program from the Department of Energy (DOE) and the South Coast Air Quality Management District that will see the vehicles used by fleets that will report energy data to the Idaho National Lab. Via is also finishing up CARB certification for both the van and the company's plug-in hybrid pick-up truck. About 50 percent of Via's technology in the truck will not need to be tested again, since it's the same as what's in the van, but things like crash tests will need to be done twice. Despite the progress, this is not where Via hoped it would be today. The bankruptcy of battery supplier A123, "took about a year off our timeline," West said. "It's been getting a little slow getting it to market, there have been some challenges, particuarly since we had the country's worst recession right in the middle of this wrap up, but it's inevitable in my mind. There is no way gas can compete with electric." Maybe that's why FedEx has expressed an interest in buying around 5,000 units, West said. FedEx already has some pilot vehicles, just like Verizon does, and PG&E wants to replace all of their gas trucks with electric vehicles, which would be another 3,000 sales, he said. Besides the fuel savings, vehicles like these, with easy on-site power generation, could also work wonders in post-disaster situations, he said, since they could replace the need for generators.
Recharge Wrap-up: U of M wins Solar Challenge, family attempts record-breaking e-bike ride
Thu, Aug 14 2014The University of Michigan Solar Car Team has won the 2014 American Solar Challenge. It is the team's eighth national championship, its fifth in a row, and its first using Siemens' product lifecycle management (PLM) software. The race took place over 1,722 miles and seven days traveling across eight states. The team's car, called "Quantum," outpaced the nearest competitor by four hours. Looking forward, Michigan Solar Car Project Manager Pavan Naik says, "The switch to Siemens tools will give us the ability to model and simulate everything and truly allow us to optimize the performance of our new vehicle. As we start on our quest to win the World Solar Challenge in 2015, we'll be leveraging a full complement of PLM solutions." Read more in the press release below. The EcoCar3 competition, in which teams will convert Chevrolet Camaros into hybrid electric cars, begins in September. The various college teams will have four years to lessen the car's environmental impact as much as possible while maintaining performance and, of course, that cool Camaro design. EcoCar3, which is put on by the US Department of Energy and General Motors, kicks off with a workshop in Novi, Michigan from September 16 - 18. Read more at the DOE website at the dedicated EcoCar3 site or watch the announcement video at our previous post. Zap and Jonway Auto are shifting to a high rate of EV production. Zap already has two lines creating the Urbee EV to met demand, and is switching over a third to make electric minivans and SUVs. The company aims to produce 30,000 EVs by 2015 for the Chinese market. Zap says it has a backlog of 25,000 Urbee orders. Read more in the press release below. A family of four hopes to make a world record-breaking, 6,000-mile electric bike journey this fall. The family, which recently drove from Argentina to Montana in a pickup with a camper, will ride from Montana to Maine, then down the East Coast to Florida in an attempt to break the record for longest electric bicycle ride. They'll use two bikes. The Father, Thomas, will ride one of the bikes carrying one of the children, while the rest of the family rides in a support vehicle, with the mother, Dylan, riding the second bike when they can find others to drive. They have started a crowdfunding campaign for some of the equipment needed to document the trip. See the video below or read more at Treehugger.
Experimental mid-engine XP-819 Corvette going up for auction
Sun, 17 Feb 2013It seems to be commonplace that when a new Corvette is in development, rumors swirl about a possible mid-engine layout. As is the case of Chevy's most recent C7 Corvette, these rumors never pan out.
In any case, the idea for a 'Vette with an engine mounted behind the driver can probably all be traced back to a single car, the 1964 XP-819 prototype. Built as an "engineering exercise" back in 1964, the prototype was designed with a rear-mounted engine. History tells us that the idea of a rear-engine Corvette fizzled, and the XP-819 was eventually cut up into pieces and stored at a shop in Daytona Beach, FL.
After sitting for untold years, a restoration project started on the car, and while it isn't yet fully completed, the current owner of the car, Mid America Motorworks, will have the car on display at the 2013 Amelia Island Concours d'Elegance as a "driveable chassis" with hopes of having a fully completed car ready to bring to next year's show.