1955 Chevrolet Bel Air 150 210 on 2040-cars
Wentzville, Missouri, United States
Restored
383 Stroker V-8 TH400 Auto MSD Ignition Headers/Custom Exhaust Aluminum Radiator Transmission Cooler Electric Fan Mini Tubs in Rear Roll Cage Bucket Seats Power Steering Disc Brakes New Front Suspension Lokar Rear End Aluminum Fuel Tank Aluminum Battery Box Car Cover Runs Perfect Drives Excellent Inspected and Licensed Garage Kept Trade for: Motor Home Boat 66-67 Chevelle SS 396 4-Speed 66-67 GTO 4-Speed 66 Nova SS 4-Speed Call or Text Ken @ 314-974-6482, email @ ken@purposewrecker.com |
Chevrolet Bel Air/150/210 for Sale
1954 chevrolet tin woody wagon 350ci, ac, 700r4 automatic
1954 bel air 2dr sedan(US $30,000.00)
1953 chevrolet rat rod hot rod chevy v-8 camaro 350 turbo 2 door low reserve!!
Hot rod, belair, wagon, 62 wagon, 1962 wagon, lowrider, lead sled, street rod
1957 chevrolet 2 door bel air hard top(US $30,000.00)
1955 chevy 210 vintage station wagon ls1 avalanche v8 original paint
Auto Services in Missouri
Wicked Stickers ★★★★★
Vietti Collision Center ★★★★★
Valvoline Instant Oil Change ★★★★★
Team 1 Auto Body & Glass ★★★★★
Talley`s Collision Repair Service ★★★★★
Tallant`s Auto Body & Hot Rod Shop ★★★★★
Auto blog
Some 2012-13 Chevy Volts may not have enough battery coolant
Mon, Jun 23 2014The 2012 and 2013 model year Chevrolet Volt extended-range plug-in vehicle may have a battery glitch caused by low coolant levels. No recall has been issued and General Motors is taking care of the issue at no cost to drivers. Some of the affected Volts may have lower-than-advisable coolant levels because of some pesky air pockets in the car's cooling circuit. When the coolant levels get too low, the charging system for the battery powering the car's onboard generator (i.e. the Rechargeable Energy Storage System, or the RESS) may be shut down, turning one's Volt into a run-of-the-mill gas-powered car, and a pricey one at that. The Car Connection says GM is advising owners of the '12 and '13 Volts to contact their local Chevy dealer for a free fix. GM representatives didn't immediately respond to a request for comment from AutoblogGreen for more details. We believe this is a separate issue than the one that brought 8,000 Volts back to the dealers for a battery coolant fix, what GM called a "voluntary customer satisfaction effort," a few years ago. General Motors sold 23,094 Chevy Volts last year after selling 23,461 Volts in 2012, so that fix-it list may get fairly lengthy. Check out a GM-Volt.com user thread related to this issue here. *UPDATE: Chevrolet spokesman Randy Fox confirmed in an e-mail to AutoblogGreen that the company issued a service bulletin to dealers that they may need to top off coolant levels on certain Volts because of the issue, and that the vehicle will "return to normal charging operation" once that's done.
Chevy Bolt will go into production in Michigan in 2016 [UPDATE]
Fri, Feb 6 2015While nothing official has been announced, it appears that General Motors may actually put the all-electric Chevy Bolt into production next year. That's the rumor that Reuters is reporting, citing two sources at suppliers for the upcoming $30,000 EV (although that $30,000 number bears some scrutiny). This rumor does fit in with earlier comments that the Bolt would arrive on the market in 2017. If it gets built, the Bolt will share more than a similar-sounding name with the Chevy Volt: the EV will be put together in metro Detroit. Reuters says the 200-mile electric car (and an Opel version) will be made in "an underused small-car plant north of Detroit," which means the Orion Township plant. GM could make between 25,000 and 30,000 Bolts a year there, if what the suppliers are saying is true. We have asked GM for a statement on this story and will update it if we hear back. UPDATE: General Motors manager of electrification technology communications, Kevin Kelly, told AutoblogGreen that, "Bolt EV Concept is just that – a concept. We're currently evaluating the vehicle program, but do not have any production announcements to make at this time."
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.