2007 Chevrolet Avalanche Crew Cab Pickup Ltz 4x4 on 2040-cars
Curryville, Missouri, United States
Vehicle Title:Clear
Fuel Type:Gasoline
For Sale By:Private Seller
Engine:5.3 V8 Flex Fuel
Transmission:Automatic
Make: Chevrolet
Model: Avalanche
Options: Sunroof, 4-Wheel Drive, Leather Seats, CD Player
Trim: LTZ Crew Cab Pickup 4-Door
Safety Features: Anti-Lock Brakes, Driver Airbag, Passenger Airbag, Side Airbags
Drive Type: 4WD
Power Options: Air Conditioning, Cruise Control, Power Locks, Power Windows, Power Seats
Mileage: 68,482
Exterior Color: Silver
Interior Color: Tan
Number of Doors: 4
Number of Cylinders: 8
Chevrolet Avalanche for Sale
2005 (05) blue ls! leather heated seats all power sunroof loaded(US $13,995.00)
Chevrolet : 2005 avalanche 2500 lt 4x4 8.1l leather roof 67k miles clean carfax
2005 chevrolet avalanche(US $34,995.00)
Custom 4x4 fully automatic chevy avalanche 2500
2003 chevrolet avalanche 1500 z71 crew cab pickup 4-door 5.3l(US $13,450.00)
2005 chevrolet avalanche 1500 z71 crew cab pickup 4-door 5.3l(US $14,995.00)
Auto Services in Missouri
Yocum Automotive ★★★★★
Wright Automotive ★★★★★
Winchester Cleaners ★★★★★
Taylor`s Auto Salvage ★★★★★
STS Car Care & Towing ★★★★★
Stepney`s Towing ★★★★★
Auto blog
Feds open investigation into Chevy Express, Ford Freestar rust issues
Wed, 28 Dec 2011'Tis the season... for road salt. And with that, comes rust. And what does rust bring? Well, for Ford and General Motors, a National Highway Traffic Safety Administration investigation. According to The Detroit News, NHTSA is looking into potential recalls issues with Chevrolet Express vans and Ford Freestar minivans.
The feds have received five complaints that rust has caused leaking fuel filler pipes on 2003 Express vans. Separately, seven complaints have been filed over excessive rust in the rear wheel wells of 2004 Ford Freestar and Mercury Monterey minivans. The Freestar and Monterey went out of production in 2007. Neither issue has resulted in any crashes or injuries, according to the report.
Want a V8 on the cheap? Buy a work truck
Thu, Aug 3 2017In case you didn't notice, V8 cars have gotten pretty expensive. If you want a modern muscle car like the Dodge Challenger R/T, Ford Mustang GT, or Chevy Camaro SS, you'll need between $34,000 and $38,000 for a stripped out example of one. The cheapest of those is the Challenger, and the priciest is the Camaro. These are also the cheapest V8 cars the companies offer. But if you absolutely have to have a V8 for less, there is an option, work trucks. As it turns out, all of the Big Three offer their most basic work trucks with V8s. And because they're so basic, they're pretty affordable, especially when sticking with the standard two-wheel drive. A Ram 1500 Tradesman with a V8 can be had for as little as $29,840, which is a little more than $4,000 less than a Challenger R/T. For a bit more at $30,275, you can have a Chevy Silverado W/T, almost $8,000 less than a Camaro SS. The most expensive is the V8 Ford F-150 starts at a starting price of $30,670, which is a bit over $5,000 less than the Mustang. Of course you'll be in an ultra bare bones vehicle with few comforts, and the price will go up if you add stuff, but we're bargain hunting here, and sacrifices are sometimes necessary. Besides, what you lose in comfort, you gain in loads of cargo space and towing (try to look at the bright side). Also, as a side note, all three trucks are available with optional electronic locking rear differentials. At the discounted price of these trucks, you still get a heaping helping of power. The most potent of the trio is the Ram 1500 Tradesman with 395 horsepower and 410 pound-feet of torque generated by a 5.7-liter V8. Compared with the Challenger R/T, the Ram is up by 20 horsepower and they're tied for torque. The value proposition is even more stark between the two vehicles when looking at the price per horsepower. Each pony in the Ram costs $75.54, while the Challenger charges you $90.91. The Challenger is also more expensive per horsepower than its close competitors. The F-150's 5.0-liter V8 is just barely behind the Ram with 395 horsepower and 400 pound-feet of torque. That's still more power than the Challenger, and it matches the torque of the 2017 Mustang GT. On the down side, it still would be down 20 horsepower on that same 2017 Mustang, and it's behind by 60 horsepower and 20 pound-feet on the new 2018 Mustang GT. The F-150 also just edges out the Mustang in the dollar per horsepower measure.
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.