1988 Cadillac Seville Sedan 4-door 4.5l on 2040-cars
Sturgeon Bay, Wisconsin, United States
This Cadillac has never been in an accident and has no rust and it hasn't been driven in the winter in 23 years.All electronics work and is original.Does not burn any oil and the tires have 2000 miles on them.
|
Cadillac Seville for Sale
- 2003 cadillac seville sts sedan 4-door 4.6l black
- 1977 cadillac seville base sedan 4-door 5.7l
- 1985 cadillac seville elegante sedan 4-door 4.1l burgundy in and out(US $1,500.00)
- 1979 cadillac seville base sedan 4-door 5.7l(US $5,000.00)
- 1996 ca cadillac seville sts sedan low miles runs drives proceeds to charity nr!(US $1,250.00)
- 1979 cadillac seville - georgian silver w/red leather interior
Auto Services in Wisconsin
Wisconsin Engine Parts Warehouse ★★★★★
West View Repair LLC. ★★★★★
Waukegan Gurnee Glass Company ★★★★★
Stommel Service ★★★★★
Stereo Doctors ★★★★★
Safelite AutoGlass - Green Bay ★★★★★
Auto blog
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.
GM lays off 450 at Lansing Grand River Assembly
Mon, Dec 8 2014General Motors will lay off 450 employees at its Lansing Grand River factory, The Detroit News reports, which is 100 more than the company said it'd be letting go last month. Lansing Grand River Assembly currently builds the Cadillac ATS and CTS, both of which have suffered sluggish sales, with the smaller sedan down 20 percent through last month and the larger model down 2.3 percent, The Detroit News reports. "We are adjusting plant production capacity to better align with market demand. Beginning in January 2015, the plant will operate on a single shift," a GM statement read, before explaining that not all the laid off Grand River employees will be jobless. Of the employees that have been laid off to make room for the single work shift, around 200 will transfer to the Lansing Delta Township factory, home of the Lambda-platform crossovers, GM's statement confirmed. The News expects this one-shift arrangement to continue until at least late next year, when the Alpha-platform Chevy Camaro transitions from General Motors' Oshawa, Ontario factory to Lansing. Cadillac President Johan de Nysschen said at last month's LA Auto Show, "It may not necessarily be permanent, a time may come when we've gained momentum and we can reinstate it. But for now, the adjustment to production capacity is in alignment with our plans for 2015."
Lansing builds its millionth Cadillac
Wed, 18 Sep 2013Cadillacs are built at plants across North America. The Escalade is assembled in Texas, the SRX in Mexico and the XTS in Ontario. But the bulk of Cadillac's lineup - or the smaller members of the family, at least - are built in Michigan. And while the upcoming ELR will be built alongside the Chevy Volt at the Detroit/Hamtramck facility (which incidentally opened with the Cadillac Eldorado back in '86), the majority of those Cadillacs built in Michigan are handled by the Lansing Grand River Assembly Plant.
In fact, Lansing Grand River just celebrated its millionth Cadillac built. The landmark millionth vehicle is a new 2014 CTS sedan in Red Obsession Tintcoat. The facility opened in 2001 and has built Cadillacs almost exclusively since then, assembling the CTS and ATS model lines, though in a couple of years it will also handle production of the Chevy Camaro.