04 Cadillac Seville Sls 4.6l Dohc V8 Northstar Engine Leather Heated Seats Caddy on 2040-cars
Ramsey, New Jersey, United States
Cadillac Seville for Sale
1994 cadillac seville sls sedan 4-door 4.6l leather
1999 cadillac seville sls california car from new 84000 miles clean just $3999(US $3,999.00)
2002 cadillac seville sts , top of the line , low miles , ex clean
1995 cadillac sts 4.6l 45k miles, white diamond,1 owner car, always garaged
1985 cadillac seville - 26k actual miles! - all original! - line ticket - lqqk
Cadillac, seville, 2002, black, 54,000 miles, new michelin tires, one owner
Auto Services in New Jersey
Yellow Bird Auto Diagnostic ★★★★★
White Horse Auto Pke ★★★★★
Vulcan Motor Club ★★★★★
Ultimate Drive Auto Repair ★★★★★
Sparx Auto ★★★★★
Same Old Brand ★★★★★
Auto blog
GM cutting production at two plants
Thu, Feb 26 2015General Motors is continuing to adjust to excess supply of some of its brands' models. To get production more in line with the vehicles' actual demand, the automotive giant is idling two of its factories in North America in the coming months. The Orion Assembly plant is going to be down from March 9-13, according to an anonymous plant worker and another insider speaking to Automotive News. The factory builds the Chevrolet Sonic and Buick Verano, but there are plenty of both models sitting on dealer lots, including 216 days worth of Sonics, according to AN. The factory already had two idle periods announced to reduce the excess. In addition, downtime is scheduled at GM's "Flex" line at the Oshawa, Ontario, Canada, plant from April 13-17. This affects supply of the Chevrolet Camaro, Impala, Buick Regal and Cadillac XTS. Among them, the automotive giant has the largest supply of Regals ready for dealers with 213 days worth of them, according to AN. The future for the whole Oshawa factory is cloudy in general, though. There are rumors that it could close entirely in the future because the Camaro is leaving and the Regal and XTS might not last much longer than 2017. The Canadian government and the labor union there intend to put up a fight, though. News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing Buick Cadillac Chevrolet GM orion assembly oshawa plant idle
Hotter Cadillac ATS-V+ could use LS7 power
Tue, May 26 2015Rumor has it Cadillac is working on an even hotter version of the ATS-V, possibly called ATS-V+. And the latest intel from Motor Trend suggests this new model might have a great, big V8 under the hood. The V8 in question is the high-revving, naturally aspirated 7.0-liter LS7 from the Camaro Z/28. The hand-built engine makes 505 horsepower and 481 pound-feet of torque in the Z/28 – a nice increase over the 464 hp and 445 lb-ft in the standard ATS-V, which uses a twin-turbocharged 3.6-liter V6. Motor Trend says the ATS-V+ will come to market with an eight-speed automatic transmission, as well as the seven-speed manual 'box from the Corvette. A dual-clutch transmission will come to market later. Of course, we'll believe it when we see it. But an LS7-powered ATS-V sure sounds like a great package to us. Here's hoping.
Cadillac confirms new flagship to be built in Detroit next year
Fri, 19 Sep 2014
"The objective for this upcoming model is to lift the Cadillac range by entering the elite class of top-level luxury cars." - Johan de Nysschen
Cadillac confirmed Friday morning it will build its new flagship sedan, expected to be called the LTS, starting in late in 2015 in Detroit.