Find or Sell Used Cars, Trucks, and SUVs in USA

2005 Cadillac Xlr, Custom 20's, Corsa Exhaust on 2040-cars

US $38,000.00
Year:2005 Mileage:46000
Location:

Lincoln, Nebraska, United States

Lincoln, Nebraska, United States
Advertising:

This is a 2005 Cadillac XLR. Only seen rain a few times. Never seen snow. Stored in a climate controlled warehouse or garage. 46,000 on ODO. 

Near perfect minus a tiny chip in the paint on the hood. 

This car has been babied and is in perfect working condition. This was NOT a daily driver. 
Comes with 8 months left on XM radio. 
Custom 20 inch rims with 1 inch stagger in back. Only 5k on Tires. 
Custom Corsa Exhaust that sounds AMAZING. Custom XLR Floormatts. 

Also comes with stock exhaust and stock wheels with like new run flat tires. 

Please ask any questions I can take more pictures as well. 

Auto Services in Nebraska

Wynn`s Body Shop ★★★★★

New Car Dealers, Automobile Body Repairing & Painting, Used Car Dealers
Address: 222 S Chestnut St, Monroe
Phone: (866) 595-6470

Skorohod Service ★★★★★

Auto Repair & Service, Gas Stations, Towing
Address: Walton
Phone: (402) 466-1616

Great Plains Auto Body ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting, Automobile Parts & Supplies
Address: 1328 35th Ave, Boys-Town
Phone: (712) 256-8100

Capital City Auto Recyclers ★★★★★

Automobile Parts & Supplies, Used & Rebuilt Auto Parts
Address: 100 W P St, Panama
Phone: (402) 475-2982

Automotive Service Solutions, LLC ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Auto Oil & Lube
Address: 2808 Spruce Acres, Brule
Phone: (308) 284-4465

Auto Accents ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting, Automobile Customizing
Address: 5621 S 50th St, Waverly
Phone: (402) 328-2726

Auto blog

Cadillac prices new ATS-V from $61,460*

Tue, Feb 10 2015

It's official, Art & Science students: Cadillac has opened the order books for the new ATS-V, and while it was at it, has told us how much we should expect to shell out for the privilege. Pricing starts at $61,460 for the 2016 Cadillac ATS-V sedan (*plus tax, title, license, dealer fees and any optional equipment). Go for the sleeker (but less practical) ATS-V coupe and you'll be looking at $63,660 (with the same conditions). For all that scratch, you'll be looking at a 3.6-liter twin-turbo V6 driving 455 horsepower and 445 pound-feet of torque through a six-speed manual or eight-speed automatic transmission, for a 0-60 time of 3.9 seconds and a top speed of 189 miles per hour. The ATS-V also features Brembo brakes, magnetorheological dampers, launch control and rev-matching with no-lift shifting. Cadillac has still yet to tell us how much gas its new performance model will guzzle, but it's got time before production gears up in the spring and the online configuration tool launches in April. Cadillac Opens Ordering for 2016 ATS-V Dual-purpose performance luxury compact designed for the track, touring 2015-02-10 DETROIT – Cadillac dealers have begun accepting orders for the 2016 ATS-V – the brand's inaugural luxury compact performance car starting production this spring. Available in sedan and coupe forms, the twin-turbocharged ATS-V offers a dual-purpose luxury performance experience: a car with true track capability straight from the factory with sophisticated road manners. Powered by the segment's highest-output six-cylinder engine – the Cadillac Twin Turbo rated at 455 horsepower (339 kW) and 445 lb-ft of torque (603 Nm) – the ATS-V achieves 0-60 performance in 3.9 seconds and a top speed of 189 mph. The Cadillac Twin Turbo engine is backed by a six-speed manual – with Active Rev Match, no-lift shifting and launch control – or a paddle-shift eight-speed automatic transmission featuring launch control and Performance Algorithm Shift. "The V-Series is the ultimate expression of Cadillac's re-ignited product substance and the passion at the core of our brand," said Johan de Nysschen, Cadillac president. "The ATS-V expands the V-Series lineup, bringing a new kind of performance character to Cadillac. Lightweight, agile and potent, the ATS-V will make an ideal pairing with the larger and even more powerful all-new 2016 CTS-V midsize sedan, which arrives later this summer," he said.

GM cutting production at two plants

Thu, Feb 26 2015

General Motors is continuing to adjust to excess supply of some of its brands' models. To get production more in line with the vehicles' actual demand, the automotive giant is idling two of its factories in North America in the coming months. The Orion Assembly plant is going to be down from March 9-13, according to an anonymous plant worker and another insider speaking to Automotive News. The factory builds the Chevrolet Sonic and Buick Verano, but there are plenty of both models sitting on dealer lots, including 216 days worth of Sonics, according to AN. The factory already had two idle periods announced to reduce the excess. In addition, downtime is scheduled at GM's "Flex" line at the Oshawa, Ontario, Canada, plant from April 13-17. This affects supply of the Chevrolet Camaro, Impala, Buick Regal and Cadillac XTS. Among them, the automotive giant has the largest supply of Regals ready for dealers with 213 days worth of them, according to AN. The future for the whole Oshawa factory is cloudy in general, though. There are rumors that it could close entirely in the future because the Camaro is leaving and the Regal and XTS might not last much longer than 2017. The Canadian government and the labor union there intend to put up a fight, though. News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing Buick Cadillac Chevrolet GM orion assembly oshawa plant idle

GM laying off more than 4,000 workers Monday morning

Sat, Feb 2 2019

According to reports from Automotive News, The Detroit News, and CNN, General Motors plans to begin laying off more than 4,000 salaried workers starting Monday morning. In a statement to AN, a spokesperson for the automaker said, "We are not confirming timing. Our employees are our priority. We will communicate with them first." We've been expecting layoffs at General Motors since November, 2018. At the time, the Detroit-based automaker announced it would seek to shed 8,100 salaried employees, shut down five assembly plants in North America, and kill off several slow-selling models. One month earlier, GM offered buyout packages to 18,000 workers and said it would seek to cut its global workforce by 25 percent. A spokesperson said at the time the moves were "proactive steps to get ahead of the curve by accelerating our efforts to address overall business performance." The cost-cutting moves are expected to save GM up to $2.5 billion in 2019 and as much as $6 billion by 2020. David Kudla, CEO and chief investment strategist of Mainstay Capital Management, referred to the impending culling as "Black Monday" and told The Detroit News that the layoffs would begin around 7:30 a.m. and continue in waves throughout the coming days and weeks. GM plans to deliver on its fourth-quarter and full-year 2018 earnings report on Wednesday. President Donald Trump plans to deliver the annual State of the Union address a day earlier on Tuesday. We expect to hear plenty more from both sides over the next several days.