A Collectable Gem With The Original Mileage Of 23,000 Km. All Original!!! on 2040-cars
North York, Ontario, Canada
Body Type:Coupe
Fuel Type:Gasoline
Year: 1984
VIN (Vehicle Identification Number): IG6AL578XEE634384
Mileage: 23000
Date of 1st Registration: 20240503
Exterior Color: Burgundy
Model: Eldorado
Car Type: Collector Cars
Make: Cadillac
Cadillac Eldorado for Sale
1973 cadillac eldorado(US $12,900.00)
1987 cadillac eldorado(US $1,000.00)
1970 cadillac eldorado(US $5,200.00)
1994 cadillac eldorado(US $6,000.00)
1987 cadillac eldorado(US $11,200.00)
1958 cadillac eldorado(US $23,900.00)
Auto blog
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.
GM recalling 8.4M cars, 8.2M related to ignition problems
Mon, 30 Jun 2014General Motors today announced a truly massive recall covering some 8.4 million vehicles in North America. Most significantly, 8.2 million examples of the affected vehicles are being called back due to "unintended ignition key rotation," though GM spokesperson Alan Adler tells Autoblog that this issue is not like the infamous Chevy Cobalt ignition switch fiasco.
For the sake of perspective, translated to US population, this total recall figure would equal a car for each resident of New Hampshire, Rhode Island, Montana, Delaware, South Dakota, Alaska, North Dakota, the District of Columbia, Vermont and Wyoming. Combined. Here's how it all breaks down:
7,610,862 vehicles in North America being recalled for unintended ignition key rotation. 6,805,679 are in the United States.
2014 Cadillac CTS Vsport [w/video]
Mon, 16 Sep 2013Bridging The Gap With Power And Poise
As you read these words, West Coast Editor Michael Harley is preparing to drive the brand-new 2014 Cadillac CTS along the gorgeous, sun-drenched roads of Southern California. And while I'll wait for Harley's full report before I put words in his mouth, I'm willing to bet he enjoys the hell out of Cadillac's new CTS. In fact, I'm sure of it.
I say this with confidence because, about a month ago, I spent the better part of a day flogging the new CTS Vsport around the 2.9-mile Milford Road Course - a challenging circuit laid out in the infield of an oval test track at GM's proving grounds in southeast Michigan. The MRC was built about a decade ago after Bob Lutz was lured out of retirement to work closely with GM's product development team, and thus, this circuit is known informally as the "Lutz Ring." The main objective of the MRC was to have an in-house facility for engineers to fine-tune vehicle dynamics, without having to constantly schlep cars over to Germany's infamous Nürburgring. (Of course, they still do.)