Find or Sell Used Cars, Trucks, and SUVs in USA

1995 Cadillac Deville Base Sedan 4-door 4.9l 28836 Miles on 2040-cars

US $8,000.00
Year:1995 Mileage:28836 Color: White Diamond /
 Neutral Shale Leather
Location:

Hudson, Wisconsin, United States

Hudson, Wisconsin, United States
Advertising:
Transmission:Automatic
Body Type:Sedan
Vehicle Title:Clear
Engine:4.9L 300Cu. In. V8 GAS OHV Naturally Aspirated
Fuel Type:GAS
For Sale By:Private Seller
Condition:

Used

VIN (Vehicle Identification Number)
: 1g6kd52b9su302832
Year: 1995
Make: Cadillac
Model: DeVille
Trim: Base Sedan 4-Door
Options: Cassette Player, Leather Seats
Safety Features: Anti-Lock Brakes, Driver Airbag, Passenger Airbag
Drive Type: FWD
Power Options: Air Conditioning, Cruise Control, Power Locks, Power Windows, Power Seats
Mileage: 28,836
Sub Model: Deville
Exterior Color: White Diamond
Disability Equipped: No
Interior Color: Neutral Shale Leather
Warranty: Vehicle does NOT have an existing warranty
Number of Cylinders: 8

Great shape car from Florida. Runs and drives well. 

Auto Services in Wisconsin

WE Recycle Auto Parts ★★★★★

Automobile Parts & Supplies, Auto Body Parts, Wheels
Address: 7566 East County Road E, Brule
Phone: (715) 398-6235

Vande Hey Brantmeier Central Garage ★★★★★

Auto Repair & Service, New Car Dealers, Used Car Dealers
Address: 516 N Madison St, Chilton
Phone: (920) 849-9301

Two Guys Automotive ★★★★★

Auto Repair & Service, New Car Dealers, Automobile Parts & Supplies
Address: 4280 S 108th St, Big-Bend
Phone: (414) 235-3465

Tool Shed Inc ★★★★★

Automobile Parts & Supplies, Hardware Stores, Automobile Radios & Stereo Systems
Address: 927 Huntington Ave, Port-Edwards
Phone: (715) 423-5333

Tilsner Collision Center ★★★★★

Automobile Body Repairing & Painting
Address: 1524 Layard Ave, Racine
Phone: (262) 632-8888

Suamico Garage ★★★★★

Auto Repair & Service, Towing
Address: 1790 Riverside Dr, Suamico
Phone: (920) 434-1808

Auto blog

GM adds 1,200 jobs at Detroit-Hamtramck plant

Thu, Oct 22 2015

General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.

2014 Cadillac XTS gets 410-hp twin-turbo V6

Tue, 14 May 2013

General Motors told us so back in March, but it is now official: The twin-turbocharged 3.6-liter V6 announced for the 2014 Cadillac CTS will also join the options list for the 2014 Cadillac XTS. The LF3 engine puts out 410 horsepower and 369 pound-feet of torque in the XTS, however, which is 10 hp and 61 lb-ft down from its application in the CTS. It will be identifiable from the outside by a specific grille treatment and a badge on the decklid. The 3.6-liter V6 with 304 hp and 264 lb-ft holds steady as the standard engine, and both will be yoked to a six-speed automatic transmission with paddle shifters.
Also new for the front-wheel drive model for 2014 are updates that include electric power steering and optional Automatic Parking Assist that can maneuver the sedan into parallel parking spots. The three trims above standard - Luxury, Premium and Platinum - get Intellibeam headlights that automatically switch between high- and low-beam,
The four current trim levels remain but the list of optional extras for the higher specs grows with a rear-seat entertainment system equipped with DVD screens in the front seatbacks, memory settings for the front passenger seat and an armrest in the back seat fitted with radio and sunshade controls. The press release below has more info on all of the changes.

GM, UAW poaching Nissan workers in Tennessee

Tue, Sep 8 2015

General Motors and the United Auto Workers are going on a recruitment drive at the Spring Hill factory in Tennessee, and they're hoping to poach some skilled workers from Nissan's nearby plant in Smyrna, TN. The General and the union even bought a billboard advertising for industrial electricians near the Japanese automaker's facility, according to the Daily News Journal. The reason for the billboard was simple. "GM was short of electricians," said Tim Stannard, the president of the UAW local at Spring Hill, to the Daily News Journal. The factory currently builds the Chevrolet Equinox but has a contract to assemble the next generation of Ecotec engines and the Cadillac XT5, which replaces the SRX. Thanks to the $185-million deal, employment there is expected to double by May 2016, according to Stannard, with roughly 1,800 additional union jobs. Beyond just several billboards, GM has job postings online for the Spring Hill plant looking for workers with specific skills. There has already been some interest in the positions among Nissan employees, Stannard indicated. According to a recent study by the Center for Automotive Research, the average GM worker currently makes $58 an hour, including benefits. Comparatively, Nissan pays an average of $42 an hour with benefits. The General's number could change in the coming weeks because its contract with the UAW is about to expire, and higher wages are among the major negotiating points.