2014 Cadillac Ats 2.5l on 2040-cars
1400 E Dixie Dr, Asheboro, North Carolina, United States
Engine:2.5L I4 16V GDI DOHC
Transmission:6-Speed Automatic
VIN (Vehicle Identification Number): 1G6AA5RA1E0179010
Stock Num: 7288
Make: Cadillac
Model: ATS 2.5L
Year: 2014
Exterior Color: Red Obsession
Options: Drive Type: RWD
Number of Doors: 4 Doors
Mileage: 2
Since 1991, we've been serving the Asheboro area and plan to continue for many years to come! Wayne Thomas Chevrolet Cadillac: Great Prices, Great Service. That's the Thomas Promise. When you're looking for a Chevrolet or Cadillac dealer that you can trust skip the high pressure big city rush and come to Wayne Thomas Chevrolet Cadillac.
Cadillac Catera for Sale
2013 cadillac ats 2.0l turbo luxury(US $37,135.00)
2014 cadillac ats 2.5l(US $34,340.00)
2014 cadillac ats 2.5l(US $35,140.00)
2013 cadillac ats 3.6l performance(US $48,030.00)
2014 cadillac ats 2.5l luxury(US $40,665.00)
2014 cadillac ats 2.5l luxury(US $38,745.00)
Auto Services in North Carolina
Willmon Auto Sales ★★★★★
Westend Auto Service ★★★★★
West Ridge Auto Sales Inc ★★★★★
Valvoline Instant Oil Change ★★★★★
USA Automotive ★★★★★
Triangle Window Tinting ★★★★★
Auto blog
Cadillac applies to trademark Symboliq, Optiq and Celestiq names
Mon, Jul 27 2020GM Authority found a General Motors trademark filing with the Swiss Federal Institute of Intellectual Property for the phrase "Cadillac Symboliq" and the name "Symboliq." The documents submitted on July 22 were for the category of "Motorized land vehicles, namely automobiles.” It appears the Swiss action was GM following up on what it had done the day before in the U.S. On July 21, GM filed paperwork with the U.S. Patent and Trademark Office to secure three words and three phrases: Symboliq and Cadillac Symboliq, Optiq and Cadillac Optiq, and Celestiq and Cadillac Celestiq. Every name is listed for application to "Motor land vehicles, namely, automobiles." Cadillac recently explained its switch to model names that end in "iq," pronounced "ick," and the fact that the Celestiq name is among the recent trio leads us to believe the automaker has strong intent to use the other two on future products. We know the Celestiq — a large, hand-built, flagship sedan that will follow the Lyriq to market, predicted to retail for close to $200,000 whenever it goes on sale. We also know Cadillac has three more battery-electric products in the works after the XT5-sized Lyriq and "massive" Celestiq. As laid out in a 2019 GM Sustainability Report pitching 20 new electric vehicles across all brands by 2023, from Cadillac we're anticipating an XT4-sized crossover, an XT6-sized three-row crossover, and an electric take on the Escalade. Two of those three could get the Symboliq and Optiq names. The lineup, and more important, Cadillac's vision, will make more sense on August 6 when we finally get to see the Lyriq concept, with its single pane of 33-inch glass forming the instrument and infotainment display across the dash, tall taillights, and 22-inch wheels.  Related Video:
The UAW's 'record contract' hinges on pensions, battery plants
Thu, Oct 12 2023DETROIT - After nearly four weeks of disruptive strikes and hard bargaining, the United Auto Workers and the Detroit Three automakers have edged closer to a deal that could offer record-setting wage gains for nearly 150,000 U.S. workers. General Motors, Ford Motor and Chrysler parent Stellantis have all agreed to raise base wages by between 20% and 23% over a four-year deal, according to union and company statements. Ford and Stellantis have agreed to reinstate cost-of-living adjustments, or COLA. The companies have offered to boost pay for temporary workers and give them a faster path to full-time, full-wage status. All three have proposed slashing the time it takes a new hire to get to the top UAW pay rate. The progress in contract talks follows the first-ever simultaneous strike by the UAW against Detroit's Big Three automakers. The union began the strike on Sept. 15 in hopes of forcing a better deal from each major automaker. But coming close to a deal is not the same thing as reaching a deal. Big obstacles remain on at least two major UAW demands: restoring the retirement security provided by pre-2007 defined benefit pension plans, and covering present and future joint- venture electric vehicle battery plants under the union's master contracts with the automakers. On retirement, none of the automakers has agreed to restore pre-2007 defined-benefit pension plans for workers hired after 2007. Doing so could force the automakers to again burden their balance sheets with multibillion-dollar liabilities. GM and the former Chrysler unloaded most of those liabilities in their 2009 bankruptcies. The union and automakers have explored an approach to providing more income security by offering annuities as an investment option in their company-sponsored 401(k) savings plans, people familiar with the discussions said. Stellantis referred to an annuity option as part of a more generous 401(k) proposal on Sept. 22. Annuities or similar instruments could give UAW retirees assurance of fixed, predictable payouts less dependent on stock market ups and downs, experts said. Recent changes in federal law have removed obstacles to including annuities as a feature of corporate 401(k) plans, said Olivia Mitchell, a professor at the University of Pennsylvania Wharton School and an expert on pensions and retirement. "Retirees want a way to be assured they won't run out of money," Mitchell said.
GM extends production cuts, affects Cadillacs, Camaro and Acadia
Thu, Apr 8 2021General Motors is extending production cuts at some of its North America factories due to a chip shortage that has roiled the global automotive industry, the U.S. carmaker said on Thursday. The move's impact has been baked into GM's prior forecast that the shortage could shave up to $2 billion off this year's profit. GM's Lansing Grand River assembly in Michigan will extend its downtime through the week of April 26. The plant makes Chevrolet Camaros and Cadillac CT4 and CT5 sedans. It has been out of action since March 15. GM's Spring Hill assembly in Tennessee will shut down for two weeks starting the week of April 12. The plant makes the Cadillac XT5, XT6 and GMC Acadia. The company said it has not taken downtime or reduced shifts at any of its more profitable full-size truck or full-size SUV plants due to the shortage. The news was first reported by CNBC. Reporting by Ankit Ajmera in Bengaluru; Editing by Maju Samuel and Sriraj Kalluvila



