1960 Buick Electra 225 4 Door Hardtop Complete on 2040-cars
Aiken, South Carolina, United States
Engine:445 Nailhead
Drive Type: Auto
Make: Buick
Mileage: 68,000
Model: Electra
Exterior Color: Black
Trim: 225
1960 Electra 225 4 Door Hardtop, Complete! 445 Nailhead, Shed Find! Said to be one owner, a doctors wife. The car was parked in 1989 when she wrecked the hood. The odometer shows 68K, believed to be correct. Bill of Sale only! If you have any questions call us at 803-648-9012 Monday-Thursday 8:30-5:30p.m EST and Friday 8:30-5:00p.m EST. Thanks for looking!
Buick Electra for Sale
1967 buick electra custom 7.0l(US $10,000.00)
Buick electra 225 wildcat 455
Classic 1970 electra 225 mint condition inside -a good car for collectors
1959 buick electra 225 convertible 445 engine
Rare 1962 stunning black 225 elactra factory air 2 dr hardtop unrestored driver(US $28,750.00)
1972 buick electra 4 door 43,110 miles
Auto Services in South Carolina
Winn`s Collision Center ★★★★★
Watson Imports ★★★★★
Vintage Auto ★★★★★
Twin Lakes Auto Body & RV Repair ★★★★★
Tire Kingdom ★★★★★
Tim`s Body Shop ★★★★★
Auto blog
GM announces $7 billion Michigan factory investment, most going to EVs
Tue, Jan 25 2022GM announced a $7 billion investment in Michigan manufacturing, much of which is earmarked for EV production. Four sites are included, but the key elements are a new battery cell plant in Lansing and the conversion of GM's existing Orion Township facility to expand production of the forthcoming Chevrolet Silverado EV and its GMC Sierra sibling. GM says it is the largest investment announcement in company history and that it will create 4,000 new jobs. It also says 1,000 jobs will be retained. "We are building on the positive consumer response and reservations for our recent EV launches and debuts, including the GMC Hummer EV, Cadillac Lyriq, Chevrolet Equinox EV and Chevrolet Silverado EV," said GM CEO Mary Barra. GM says the Orion expansion and new battery plant will support an increase in full-size electric truck production capacity to 600,000 units. This is in addition to the Factory ZERO facility in Detroit that will also be constructing the electric Silverado and Sierra. The Orion Township factory current builds the Chevrolet Bolt EV and EUV, and will continue to do so during the plant's conversion. GM did not indicate what will happen with the Bolts once that conversion is complete or whether all will continue to be built at Orion. They do not use the Ultium vehicle architecture. GM will build other EV models at three other factories that are under construction or being converted. They are located in Spring Hill, Tennessee, Ingersoll, Ontario, and Ramos Arizpe, Mexico. GM says that it will have the ability to produce 1 million electric vehicles by 2025. The Ultium Cells Lansing facility is a $2.6 billion joint investment by GM and LG Energy Solution. GM says it alone will create 1,700 jobs once fully operational by late 2024. It will join two other GM Ultium Cells battery factories currently under construction in the United States, one in Ohio and the other in Tennessee. Not all of the $7 billion investment will be for EVs. It also announced $510 million of the total will go toward upgrading the Lansing Delta Township Assembly to produce the next-generation Chevrolet Traverse and Buick Enclave. Money will also go to upgrading Lansing Grand River Assembly.
Movie Review: Black Air: The Buick Grand National Documentary
Thu, 06 Dec 2012As Buick currently claws and scratches its way back into relevance to compete against luxury brands like Lexus and Acura, it's hard to believe that not too long ago, the brand had a car that was mentioned in the same breath as Corvette, Lamborghini and Ferrari. That car? None other than the Buick Grand National. All black with a turbocharged V6 and some of the quickest acceleration of its time, the Grand National, in today's standards, is along the lines of a 2013 Shelby GT500 with both cars essentially being a working man's supercar.
The last Grand National rolled off the assembly line in Flint, MI on December 11, 1987, and to mark the silver anniversary of that somber occasion, Black Air is a documentary of the Grand National from the perspective of the enthusiast, the collector, the media and even from those at General Motors responsible for creating such a sinister legend. Like the car itself, Andrew Filippone Jr. shoots the documentary in a raw fashion, and it definitely helps to show why a low-volume muscle car from the 1980s is still the object of obsession for many automotive enthusiasts to this day.
GM laying off 500 workers to slow Chevy Sonic production
Sat, Oct 24 2015Due to slow sales of the Chevrolet Sonic and Buick Verano, General Motors is cutting a shift at the Orion Township plant that builds the pair. The move lays off about 500 workers, but most of them are expected to get offers to transfer to other factories, Automotive News reports. The move came just a day after GM announced adding 1,200 employees to the Detroit-Hamtramck plant. GM has been trying all year at the Orion Township factory to align production of the Sonic and Verano with their demand. The automaker first attempted idling the plant several times and eventually resorted to laying off about 100 workers. It also reduced the production rate there. With the huge rise in popularity of crossovers, demand for the plant's small cars is on the downturn. According to Automotive News, there's currently a 116-day supply of Sonics and 100 days of Veranos to sell. Delivers tell a similar tale because the Chevy is off 35.2 percent from January to September, and the Buick does little better with a 27.2 percent drop from the same period last year. While the situation at Orion Township might look rough now, big things are on the horizon. Soon, the new Chevy Bolt electric vehicle will be built there when it hits the market around 2017. Plus, the plant will also get a $245-million upgrade and 300 new jobs for another, unannounced vehicle.