** Only 90k Orig Miles ** (( 3.1l V6...pwr Options )) No Reserve on 2040-cars
Merchantville, New Jersey, United States
Engine:3.1L 189Cu. In. V6 GAS OHV Naturally Aspirated
For Sale By:Dealer
Body Type:Sedan
Transmission:Automatic
Fuel Type:GAS
Make: Buick
Options: Cassette
Model: Century
Safety Features: Anti-Lock Brakes, Driver Side Airbag
Trim: Custom Sedan 4-Door
Power Options: Air Conditioning, Cruise Control, Power Windows
Drive Type: FWD
Doors: 4
Mileage: 90,583
Engine Description: 3.1L V6 SFI OHV 12V
Sub Model: Custom
Number of Doors: 4
Exterior Color: White
Interior Color: Gray
Number of Cylinders: 6
Warranty: Vehicle does NOT have an existing warranty
Buick Century for Sale
1998 buick century limited sedan 4-door 3.1l(US $2,000.00)
1956 buick century 2 door hardtop riviera(US $3,500.00)
2002 custom 3.1l auto dark bronzemist metallic
2004 buick century custom sedan 4-door 3.1l(US $4,995.00)
2002 buick century sedan 1 owner 59k miles(US $5,000.00)
2002 buick century limited sedan 4-door 3.1l
Auto Services in New Jersey
Woodland Auto Body ★★★★★
Westchester Subaru ★★★★★
Wayne Auto Mall Hyundai ★★★★★
Two Guys Autoplex 2 ★★★★★
Toyota Universe ★★★★★
Total Automotive, Inc. ★★★★★
Auto blog
GM laying off 510 amidst slow Cadillac, small car sales
Wed, 12 Nov 2014General Motors is laying off about 510 workers from two factories beginning in January, and it could be months before the automaker needs some of that latent capacity to come back on line. A combination of poor sales and high dealer inventories are prompting the cutbacks, according to Automotive News.
The largest changes come at GM's Lansing Grand River plant, where the Cadillac ATS and CTS are made. An entire shift of about 350 workers is being laid off, but the automaker hopes to find positions for some of them at other nearby factories. The decision leaves just a single shift building vehicles there. According to Automotive News, the move is partially spurred by Johan de Nysschen's plan to make Cadillac a more exclusive brand.
The lost shift will likely return for production of the next-generation Chevrolet Camaro at the plant, according to the report, but GM isn't saying when that will be. A previous announcement from the Canadian Auto Workers union indicated that the Oshawa, Ontario, factory would lose the coupe in late 2015 or early 2016.
Mysterious white powder discovered at GM Orion Assembly
Fri, Sep 2 2016Workers at General Motors Orion Assembly Plant in Orion Township, MI uncovered a mysterious white powder in two different parts of the factory earlier this week, raising concerns about worker safety. "We can confirm that an unknown substance (white powder) was found on the floor outside of Gate 6 at Orion Assembly on Monday, August 29. On Tuesday, August 30, we had a second report of a bottle containing a similar substance found inside the plant," GM spokesperson Dayna Hart told The Oakland Press via email. GM stressed that incident didn't disrupt operations at the plant, and that the company was taking steps to ensure the safety of the sprawling factory's workers. That did include, an anonymous worker told The Oakland Press, closing off parts of the factory for two full days, as drug-sniffing dogs and crews in haz-mat suits descended on the area. "A sample of the substance has been sent to a laboratory for identification and results are expected later this week," Hart said. "All findings and actions have been shared with our employees." Orion Assembly currently builds the Chevrolet Sonic and Buick Verano, and will eventually be responsible for production of the new, all-electric Chevy Bolt early next year. Related Video:
GM cutting Chevy Sonic, Buick Verano production by more than 20%
Sat, Jun 13 2015General Motors' Orion Assembly plant in Michigan is seeing even more production cuts this year to further reduce inventories of the Chevrolet Sonic and Buick Verano. These latest adjustments mean layoffs for about 100 workers in phases starting in July. "GM Orion Assembly will adjust plant production capacity to better align with market demand," the company said in a statement announcing the change. Through May, sales of the Sonic are down 28.5 percent to 29,082 vehicles, and the Verano is off 15.6 percent, with 15,279 sold this year. According to unnamed plant insiders speaking to Automotive News, the assembly rate is slowing at Orion Assembly from the current 33 cars an hour down to 26 an hour, a 21-percent reduction. GM is also reportedly going to keep the plant idle for three weeks during the normal summer shutdown, rather than the usual two. Earlier in the year, the factory was idled for two weeks due to excess supply of the Sonic and Verano. In March, it was closed again for several days for the same reason. The Orion Assembly plant is the future home to the line for the Chevy Bolt EV. GM Statement: GM Orion Assembly will adjust plant production capacity to better align with market demand. A phased layoff of approximately 100 employees will begin in July 2015 and conclude by year-end. Related Video: News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing Buick Chevrolet GM Hatchback Sedan buick verano orion assembly