2009 Bmw X6 Xdrive 50i-bmw Certified Pre-owned-loaded-rear Ent-nav-sport Package on 2040-cars
Winter Park, Florida, United States
BMW X6 for Sale
2009 xdrive50i used turbo 4.4l v8 32v automatic all-wheel drive suv premium(US $32,991.00)
Xdrive 50i 300 miles! vermilion red
2011 bmw x6 activehybrid sport utility 4d warranty low 34k miles 480hp loaded(US $45,500.00)
2012 bmw x6 awd 4dr 50i traction control leather seats security system(US $56,431.00)
X6 primium
2012 xdrive50i used turbo 4.4l v8 32v automatic all-wheel drive suv premium(US $53,694.00)
Auto Services in Florida
Y & F Auto Repair Specialists ★★★★★
X-quisite Auto Refinishing ★★★★★
Wilt Engine Services ★★★★★
White Ford Company Inc ★★★★★
Wheels R US ★★★★★
Volkswagen Service By Full Throttle ★★★★★
Auto blog
BMW reacquires original factory as classic center
Thu, 27 Feb 2014BMW was barely two years old when it started manufacturing airplane engines in a factory on Moosacher Strasse in Munich. Two years after that, it sold the factory to Knorr-Bremse AG, a leading manufacturer of brakes for trains and commercial vehicles, and BMW moved into a new facility on Lerchenauer Strasse. There it expanded into the industrial giant we know today, building engines for cars, trucks, motorcycles, boats and planes. It's taken the better part of a century to get that original factory back, but that's exactly what BMW has done, reacquiring the expanded facility from Knorr-Bremse this month.
The factory on Moonsacher Strasse will now serve as the headquarters for BMW Group Classic, the division that handles archives and historical vehicles for BMW, Mini and Rolls-Royce. From there, just a stone's throw from corporate headquarters and its main plant (as well as BMW Welt and the BMW Museum), the classic division's operations will include a restoration workshop, vintage parts store, the company's archives, administration as well as a place to hold events. In addition, there will be an exhibition space for historical vehicles from the company's considerable collection.
At the heart of the new/old campus is the gatehouse, which is a protected heritage site and will serve as a gateway into the company's history. Read the full details in the press release below.
Why are all US-bound BMW i3 EVs with range extenders stuck at port?
Tue, May 20 2014The first BMW i3 EVs have been delivered in the US, but in a quirk of the rules, none of them have been the range-extended versions. Long-time BMW electric vehicle driver Tom Moloughney discovered this fact the hard way. His i3 REx has been sitting at a New Jersey port for over a week and he's getting impatient. The problem is something Moloughney calls a "Monroney Hold." So, instead of sitting there fuming, Moloughney did a bit of research and discovered that the problem is something he calls a "Monroney Hold." He says that "the EPA certification has not been completed so BMW doesn't have a Monroney label (window sticker) to post in the window before the car leaves the port, which is required by law. The range extender option changes (shortens) the car's electric range, and also requires an official MPG rating so BMW couldn't use the same Monroney label as they did for the all electric i3." You can read more on his website, but it turns out that the story isn't so simple. For one thing, the EPA testing has been finished. Washington State representative Chad Magendaz told Moloughney that he asked the EPA for an official statement and got the following from Linc Wehrly, Director of the Light-Duty Vehicle Center Compliance Division: "EPA tested the i3 REx and provided the results of that testing to BMW on May 13th. EPA is not aware of anything that would prevent BMW from importing the vehicles since May 13th." Then there's the official word from BMW. Spokesman Dave Buchko told AutoblogGreen that: We are moving as quickly as possible to release the first BMW i3 Range-Extender models to BMW i Centers. Receipt of test data from the EPA is one step, but not the final step, in the process of receiving certification from the EPA. Rules do not permit the release of vehicles for sale until EPA labels are finalized, produced and affixed to any vehicle. Barring any unforeseen delays, we expect that to happen by the end of this week. We have never certified a vehicle like this before. We are taking every precaution to make sure that everything is done in a timely, but more importantly correct manner. In that Monroney labels cannot be produced until the EPA certification process is complete, the characterization [of a "Monroney Hold"] is not technically incorrect, but there is more to it than that, as is often true in life. On a lighter note, BMW donated a loaded i3 to Brad Pitt's Make It Right charity foundation as a fundraiser. Read about that below.
BMW discussing new plant with Mexican authorities
Mon, 19 Aug 2013Drawn in by low wages and manufacturing costs, BMW could be the next automaker to set up a manufacturing facility in Mexico. Automotive News is reporting that the German automaker has had discussions with local Mexican governments regarding a possible assembly plant, but there is no word as to when a decision may come down. Last we heard, BMW was reportedly looking to build the 3 Series in Mexico.
A key determining factor for this new plant is a free-trade agreement between the US and Europe, which according to the article, would give BMW better "flexibility and cost structure" to open another plant in North America. In terms of luxury automakers, Audi is currently building a new plant in Mexico and Mercedes-Benz is considering opening one in conjunction with Nissan for the CLA-Class, and in the bigger picture, Honda and Mazda are also preparing to kick off vehicle production in Mexico.