GM laying off 500 workers to slow Chevy Sonic production
Sat, Oct 24 2015GM has been trying all year at the Orion Township factory to align production of the Sonic and Verano with their demand. The automaker first attempted idling the plant several times and eventually resorted to laying off about 100 workers. It also reduced the production rate there.
With the huge rise in popularity of crossovers, demand for the plant's small cars is on the downturn. According to Automotive News, there's currently a 116-day supply of Sonics and 100 days of Veranos to sell. Delivers tell a similar tale because the Chevy is off 35.2 percent from January to September, and the Buick does little better with a 27.2 percent drop from the same period last year.
While the situation at Orion Township might look rough now, big things are on the horizon. Soon, the new Chevy Bolt electric vehicle will be built there when it hits the market around 2017. Plus, the plant will also get a $245-million upgrade and 300 new jobs for another, unannounced vehicle.
By Chris Bruce
See also: GM adds 1,200 jobs at Detroit-Hamtramck plant, Nissan Sentra, Buick LaCrosse to headline LA Auto Show, New Takata problem results in recall of 414 GM vehicles.