GM cutting production at two plants
Thu, Feb 26 2015The Orion Assembly plant is going to be down from March 9-13, according to an anonymous plant worker and another insider speaking to Automotive News. The factory builds the Chevrolet Sonic and Buick Verano, but there are plenty of both models sitting on dealer lots, including 216 days worth of Sonics, according to AN. The factory already had two idle periods announced to reduce the excess.
In addition, downtime is scheduled at GM's "Flex" line at the Oshawa, Ontario, Canada, plant from April 13-17. This affects supply of the Chevrolet Camaro, Impala, Buick Regal and Cadillac XTS. Among them, the automotive giant has the largest supply of Regals ready for dealers with 213 days worth of them, according to AN.
The future for the whole Oshawa factory is cloudy in general, though. There are rumors that it could close entirely in the future because the Camaro is leaving and the Regal and XTS might not last much longer than 2017. The Canadian government and the labor union there intend to put up a fight, though.
- News Source: Automotive News - sub. req.
- Image Credit: Bill Pugliano / Getty Images
By Chris Bruce
See also: Lexus tops JD Power Vehicle Dependability Study again, Buick bests Toyota, Cadillac CT6 to get twin-turbo V8, Buick tops in Consumer Reports' annual brand rankings.