Find or Sell Used Cars, Trucks, and SUVs in USA

2009 Audi A3 Base Hatchback 4-door 2.0l, Nav, Prem Bose Sound, 6-cd, 80k Miles on 2040-cars

US $14,000.00
Year:2009 Mileage:80000
Location:

Starkville, Mississippi, United States

Starkville, Mississippi, United States
Advertising:

Excellent condition, small ding on driver side door, well maintained, all new tires, all maintenance records available, clean title, aways garaged, mostly highway miles
Fully loaded with MMI navigation, 6-CD changer, tire pressure monitor, after market backup camera and parking sensors
Purchased used from Audi dealership as certified pre-owened
This vehicle is available for local pick-up. Additionally, shipping arrangements can be made through uShip. 
Prefer Cash on pick up. Bank to Bank Wire Transfers area also an acceptable form of payment. Cashiers checks or money order MUST Clear before vehicle is picked up. Absolutely NO exceptions.

Audi A3 for Sale

Auto Services in Mississippi

Wade Auto Repair ★★★★★

Auto Repair & Service
Address: 20251 Highway 63, Wade
Phone: (228) 588-2468

Tri-County Auto Repair ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Auto Oil & Lube
Address: Baldwyn
Phone: (662) 841-2204

Pro Tran ★★★★★

Automobile Parts & Supplies, Auto Transmission
Address: 1580 Highway 51 S, Hernando
Phone: (662) 449-3416

LKQ Self Service Auto Parts ★★★★★

Automobile Parts & Supplies, Automobile Salvage, Engines-Supplies, Equipment & Parts
Address: 966 W Mitchell Rd, Independence
Phone: (901) 730-8454

Kcs Exotic Cars ★★★★★

Used Car Dealers
Address: 2020 Fletcher Creek Dr, Mineral-Wells
Phone: (901) 373-7000

Jerry`s Auto Electric ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Automobile Electric Service
Address: 819 Live Oak Ave, Pascagoula
Phone: (228) 762-9533

Auto blog

Another Green Episode | Autoblog Podcast #665

Fri, Feb 19 2021

In this week's Autoblog Podcast, Editor-in-Chief Greg Migliore is joined by Senior Editor, Green, John Beltz Snyder and West Coast Editor James Riswick for an episode dedicated to electric cars. First, they talk about what they've been driving, including the Ford Mustang Mach-E, the new base, rear-wheel-drive Porsche Taycan as well as the Polestar 2. Then they dive into some green news, including the reveal of the Audi E-Tron GT, the new Chevrolet Bolt EV and Bolt EUV and plans to go electric by companies like General Motors and Jaguar Land Rover. Autoblog Podcast #665 Get The Podcast iTunes – Subscribe to the Autoblog Podcast in iTunes RSS – Add the Autoblog Podcast feed to your RSS aggregator MP3 – Download the MP3 directly Rundown What we're driving:Ford Mustang Mach-E Porsche Taycan Polestar 2  News 2022 Audi E-Tron GT revealed as sporty, electric cousin to Porsche Taycan 2022 Chevrolet Bolt EUV introduced along with revised Bolt EV General Motors sets goal of being carbon neutral, largely electric by 2035 Jaguar to sell all-electric cars by 2030, and six electric Land Rovers coming in next five years Feedback Email – Podcast@Autoblog.com Review the show on iTunes Autoblog is now live on your smart speakers and voice assistants with the audio Autoblog Daily Digest. Say “Hey Google, play the news from Autoblog” or "Alexa, open Autoblog" to get your favorite car website in audio form every day. A narrator will take you through the biggest stories or break down one of our comprehensive test drives. Related Video:

VW internal investigation finds 'no evidence' against suspended engineers

Tue, Oct 6 2015

Volkswagen is still working out the chain of events that led to emissions-evading software being installed in 11 million diesel vehicles worldwide and deciding who was responsible for the treachery. So far, the German automotive giant's internal investigation hasn't publicly named many suspects, and three suspended executive-level engineers have been found not to be culpable in the wrongdoing, according to an anonymous insider speaking to Reuters. VW knows that the software began being installed in the EA 189 engine in 2008. The internal investigation has found that the emissions-evading tech was created because the powerplant was found to fail US standards. Plus, the diesel mill wasn't meeting cost targets, according to Reuters. The automaker responded by suspending over 10 employees, but three top engineers among them might not have been involved. Those put on leave include Heinz-Jakob Neusser from VW, Ulrich Hackenberg from Audi, and Wolfgang Hatz who led Porsche's research and group-wide engine development. The internal detective work hasn't turned up any evidence against these three men. In addition to VW's own inquires, government investigators in both the US and Germany are taking a serious look into the company's actions, too. So far, the automaker is setting aside about $7.3 billion to pay to fix the vehicles with the evasive software. Depending on what authorities find, the costs could grow quickly. Beyond the financial implications, the scandal has led to a serious shakeup in VW's corporate structure. Related Video:

Recharge Wrap-up: Schaeffler 48V mild hybrid Audi TT, Georgia Power charging stations

Thu, Oct 1 2015

Schaeffler will test a 48-volt mild hybrid system in the Audi TT. A lithium-ion battery powers an electrified rear axle, which supplements the power provided to the front wheels from the internal combustion engine. The system includes a belt-driven starter generator also running on 48 volts. The car has driver-selected Sport and Eco modes, the latter of which maximizes all-electric driving at low speeds for increased fuel economy. The rear axle can also support the front when more traction is needed. Sport mode wrings out every bit of performance from both the internal combustion and electric motors, with torque vectoring between the rear wheels offering extra stability. Read more at Green Car Congress, or in the press release from Schaeffler. A man has built a near-life-size replica of a Tesla Supercharger out of Legos. Robert Turner's ode to the charging station stands at 42.5 inches tall (which looks impressive standing next to a real Model S), and took over three months to build. Turner showcased his Lego Supercharger at the Brickworld Chicago Lego convention, and he goes into more detail about the painstaking process of forming his creation out of tiny plastic bricks in a video interview. See the Lego Supercharger and read more at The Brothers Brick. Georgia Power is opening 11 new EV charging stations around the state. The charging islands – which are located at various Georgia Power locations – offer DC fast charging with CHADeMo/SAE Combo plugs as well as Level 2 208/240-volt chargers. Customers can pay with either a Georgia Power or ChargePoint card. These first chargers are part of a larger plan by the utility to roll out 61 charging islands throughout Georgia by the end of 2016. See a list of locations and learn more in the press release below. Georgia Power opens 11 new EV charging islands First phase of statewide public charging infrastructure completed ATLANTA, Sept. 30, 2015 /PRNewswire/ -- Georgia Power announced today that the company will open 11 new electric vehicle (EV) charging islands to the public on October 1. The new charging islands, located at Georgia Power properties across the state, mark the completion of the first phase of planned charging infrastructure being developed by the company which will include approximately 61 community charging islands for public use statewide by the end of 2016.