2011 Volkswagen Jetta Base Sedan 4-door 2.0l on 2040-cars
Philadelphia, Pennsylvania, United States
Engine:2.0L 1984CC 121Cu. In. l4 GAS SOHC Naturally Aspirated
Vehicle Title:Rebuilt, Rebuildable & Reconstructed
Body Type:Sedan
Fuel Type:GAS
For Sale By:Private Seller
Sub Model: BASE
Make: Volkswagen
Exterior Color: Silver
Model: Jetta
Interior Color: Black
Trim: Base Sedan 4-Door
Drive Type: FWD
Options: CD Player, AUX
Number of Cylinders: 4
Safety Features: Anti-Lock Brakes, Driver Airbag, Passenger Airbag, Side Airbags
Power Options: Air Conditioning, Power Locks, Power Windows
Mileage: 21,027
HELLO
Volkswagen Jetta for Sale
- 2013 vw 2.0l tdi turbo 2l i4 16v automatic fwd sedan premium sunroof bluetooth(US $25,000.00)
- The car that every one is looking for (rare) 2010 vw turbo diesel 6 speed(US $15,500.00)
- 2013(13)jetta se silver/black fact w-ty only 5k keyless cruise mp3 save huge!!!(US $16,995.00)
- 2013(13)jetta se white/black fact w-ty only 13k keyless cruise mp3 save huge!!!(US $15,995.00)
- Sel w/sunroo 2.5l nav cd traction control front wheel drive power steering a/c(US $16,993.00)
- 2012 vw jetta sedan 2.0; 4 cylinder engine! great fuel economy! one owner
Auto Services in Pennsylvania
YBJ Auto Sales ★★★★★
West View Auto Body ★★★★★
Wengert`s Automotive ★★★★★
University Collision Center ★★★★★
Ultimate Auto Body Inc ★★★★★
Stewart Collision Service ★★★★★
Auto blog
BMW, VW partner with ChargePoint for high-speed charging network
Thu, Jan 22 2015To promote their plug-in electric vehicles, a number of electric vehicle makers are working overtime to get a charging infrastructure set up. Tesla is famously setting up a network of Superchargers around the world, and today BMW and VW have announced they are partnering with ChargePoint to install almost 100 DC Fast Chargers up and down the US coasts. Installing additional Level 2 chargers is also part of the plan. The new DC Fast Chargers will offer the SAE Combo connectors, which is available on both the e-Golf and the i3. The fast chargers will have "up to two 50 kW DC Fast chargers, or 24 kW DC Combo Fast chargers," BMW says. They will be installed roughly 50 miles apart between Boston and Washington, DC in the east as well as Portland, San Francisco, Los Angeles and San Diego in the west. The 24-kW DC Fast Chargers will fill up an empty i3 or e-Golf to 80 percent in a half-hour or 3.5-4 hours from the Level 2 cords. Speaking at an announcement ceremony at the Washington Auto Show today, ChargePoint CEO Pasquale Romano said that infrastructure investments like this will get more people to realize that they can use an electric vehicle as their only car, and Jorg Sommer, VP of product marketing and strategy for VW North America, said that it's clear that, "The EV is perfect for the daily driver." BMW, Volkswagen and ChargePoint Join Forces to Create Electric Vehicle Express Charging Corridors on the East and West Coasts. · A goal of nearly 100 DC Fast charging ports will be installed to support long distance and metropolitan electric vehicle travel with the BMW i3, Volkswagen e-Golf and other electric cars, along heavily trafficked corridors on both coasts, supported by Level 2 chargers. · These publicly available charging stations will be added to the existing ChargePoint network and can be easily accessed using a ChargePoint® or ChargeNow card. Washington, D.C., January 22, 2015 – At the 2015 Washington Auto Show, two of the top automakers, BMW of North America and Volkswagen of America, together with ChargePoint, the largest electric vehicle charging network, announced an initiative to create express charging corridors along heavily-traveled routes on the East and West Coasts.
VW using other manufacturing locations as leverage in battle with TN [w/video]
Sat, 26 Apr 2014We've reached a new step in the ongoing drama at Volkswagen's factory in Chattanooga, TN. The United Auto Workers recently dropped its opposition to the union vote and agreed that it wouldn't hold another ballot for at least a year. Now, the new question becomes where VW is going to build its forthcoming midsize SUV.
Earlier, it had been considered all but certain that the SUV, likely a production version of the CrossBlue concept (pictured above), would be built in Tennessee. However, it seems the Chattanooga factory might have competition to produce it. In emails obtained by The Detroit News, VW's lawyer wrote to the Tennessee economic development department in January saying, "While we understand there are some 'non-deal' issues that are causing a delay in the TN solution, VW has been successful in reaching agreement on terms at the alternative locations."
As previously reported, the state of Tennessee allegedly offered VW about $300 million in incentives to build the vehicle there and create an estimated 1,350 jobs, but it later rescinded the deal. Newly leaked documents from NewsChannel 5 (WTVF-TV) in Nashville allegedly show just how close that offer was to being completed. It appears that VW actually sent the government the first draft of a memorandum of understanding agreeing to the incentives, but the state removed the offer in late January.
VW's Skoda says Ukraine partner making wire harnesses again
Tue, Mar 22 2022PRAGUE — Skoda Auto, part of the Volkswagen Group, said on Tuesday its supply partner in Ukraine had decided to restart production of wire harnesses which should allow the Czech carmaker to resume production of its electric ENYAQ iV model. Russia's invasion of Ukraine has added to supply chain problems for global automakers — which were already struggling with semiconductor shortages that have cut production — with a break in deliveries of wire harnesses from the war-torn country. While Skoda, the Czech Republic's biggest exporter, said it expects the supply of semiconductors to improve in the second half of 2022, it said the war in Ukraine and supply bottlenecks will put a significant burden on its operating business. Skoda's 2021 deliveries fell 12.6% year-on-year and earlier this month it stopped production of the ENYAQ because of harness shortages, saying that two other models were at risk because of the lack of availability of the component. "Our partner ... in Ukraine decided to restart production of wire harnesses this week, with full service and full security for workers there," Karsten Schnake, Skoda's board member for purchasing, said during its online 2021 earnings presentation. Wire harnesses form a key part of a car's electrical system, which group and guide cables inside the vehicle. "We decided to double the production in case something is going wrong, and this production will be ramped up in an alternative factory," Schnake said, adding that work there would start in three or four weeks. "Hopefully we can restart production of ENYAQ one or two weeks later when we have wire harnesses," Schnake said. Skoda delivered 878,200 cars worldwide in 2021, the first time that this had fallen below the 1 million mark since 2013. Nevertheless, the VW group brand's sales revenue rose 3.9% to 17.7 billion euros ($19.5 billion) in 2021 and operating profit rose 43.2% to 1.1 billion euros ($1 billion) as it took cost measures. Skoda did not give a financial or production outlook, saying there were still considerable uncertainties as a result of the conflict in Ukraine and the impact on its Russian operations. Skoda, like VW, has suspended production and other business activities in Russia, which was its second-largest market last year, with 90,400 vehicles delivered. ($1 = 0.9089 euros) (Reporting by Jason Hovet, Editing by Louise Heavens, Kirsten Donovan and Alexander Smith) Related video: Green Plants/Manufacturing Volkswagen Skoda Electric ukraine war