Find or Sell Used Cars, Trucks, and SUVs in USA

2004 Vw Gti Vr6 2.8l V6 6 Speed Manual Low Mileage Leather Loaded Cpo Warranty on 2040-cars

US $9,900.00
Year:2004 Mileage:35049
Location:

Pompano Beach, Florida, United States

Pompano Beach, Florida, United States

Auto Services in Florida

Workman Service Center ★★★★★

Auto Repair & Service
Address: 2947 Gulf Breeze Pkwy, Gulf-Breeze
Phone: (850) 932-3239

Wolf Towing Corp. ★★★★★

Auto Repair & Service, Towing, Transportation Services
Address: Sun-City-Center
Phone: (813) 928-9389

Wilcox & Son Automotive, LLC ★★★★★

Auto Repair & Service
Address: 62 W. Illiana Street Suite C, Windermere
Phone: (407) 440-2848

Wheaton`s Service Center ★★★★★

Auto Repair & Service, Towing, Tire Dealers
Address: Grassy-Key
Phone: (305) 451-3500

Used Car Super Market ★★★★★

Auto Repair & Service, Used Car Dealers, Wholesale Used Car Dealers
Address: 3120 W Tennessee St, Ochlockonee-Bay
Phone: (850) 575-6702

USA Auto Glass ★★★★★

Automobile Parts & Supplies, Automobile Accessories, Windshield Repair
Address: 30000 S Dixie Hwy, Sunny-Isles-Beach
Phone: (305) 247-9100

Auto blog

Recharge Wrap-up: Mercedes gets F1 efficiency, EV charging in Vermont, VW e-Golf to use Bosch

Mon, Jul 14 2014

Efficiency equals performance, especially in the case of Formula 1 racing. The Mercedes AMC Petronas team points to several key efficiency technologies it uses to get the most out of its cars. And if their utter dominance so far this season is testament to this relationship, perhaps we should pay attention. Mercedes highlights hybrid tech, turbocharging, aerodynamics, lightweight construction, tribology (both in making internal components and lubricants more slippery) and simulation as crucial to getting around the track faster than anyone else. These just happen to be some of the same things that make the cars we drive on public roads more fuel-efficient. Learn more in the press release below. It's a good read. Brammo, maker of sweet electric motorcycles, is teaming up with TEAM Industries to make drivetrains for electric vehicles. TEAM, which specializes in drivetrain technology, will also become an investor in Brammo as part of the partnership. "The electric vehicle market is a growth market," says TEAM CEO and President David Ricke, "and TEAM and Brammo will be providing a wide range of solutions for OEM manufacturers." Read more over at EV World. Vermont celebrated the installation of a new EV charging station as part of a Green Energy Corridor between Boston and Montreal. When finished, drivers will be able to make the whole trip in an EV with access to charging along the way. For $5, customers can charge their vehicle in about 30 minutes at the Red Hen Baking Company in Middlesex. There are currently only about 700 EVs on the road in Vermont. The state has a goal to get 90 percent of its energy from renewable sources by 2050, and getting more EVs on the road is crucial to that mission. Vermont hopes that expanding the charging infrastructure will convince more people to go electric. Read more at Vermont Public Radio's website. For it's new e-Golf, Volkswagen will use Bosch chargers for home installation and ChargePoint stations at its dealerships. Bosch will have various 240-volt options for the home, and will also provide installation. e-Golf customers will also get a free ChargePoint membership, and will have access to the company's network of charging stations worldwide. The 2015 e-Golf goes on sale in the US later this year. Read more in the press release below. Synergies between F1 and Road Car Development: Efficiency equals performance In Formula 1 Racing, performance is everything.

BMW, VW partner with ChargePoint for high-speed charging network

Thu, Jan 22 2015

To promote their plug-in electric vehicles, a number of electric vehicle makers are working overtime to get a charging infrastructure set up. Tesla is famously setting up a network of Superchargers around the world, and today BMW and VW have announced they are partnering with ChargePoint to install almost 100 DC Fast Chargers up and down the US coasts. Installing additional Level 2 chargers is also part of the plan. The new DC Fast Chargers will offer the SAE Combo connectors, which is available on both the e-Golf and the i3. The fast chargers will have "up to two 50 kW DC Fast chargers, or 24 kW DC Combo Fast chargers," BMW says. They will be installed roughly 50 miles apart between Boston and Washington, DC in the east as well as Portland, San Francisco, Los Angeles and San Diego in the west. The 24-kW DC Fast Chargers will fill up an empty i3 or e-Golf to 80 percent in a half-hour or 3.5-4 hours from the Level 2 cords. Speaking at an announcement ceremony at the Washington Auto Show today, ChargePoint CEO Pasquale Romano said that infrastructure investments like this will get more people to realize that they can use an electric vehicle as their only car, and Jorg Sommer, VP of product marketing and strategy for VW North America, said that it's clear that, "The EV is perfect for the daily driver." BMW, Volkswagen and ChargePoint Join Forces to Create Electric Vehicle Express Charging Corridors on the East and West Coasts. · A goal of nearly 100 DC Fast charging ports will be installed to support long distance and metropolitan electric vehicle travel with the BMW i3, Volkswagen e-Golf and other electric cars, along heavily trafficked corridors on both coasts, supported by Level 2 chargers. · These publicly available charging stations will be added to the existing ChargePoint network and can be easily accessed using a ChargePoint® or ChargeNow card. Washington, D.C., January 22, 2015 – At the 2015 Washington Auto Show, two of the top automakers, BMW of North America and Volkswagen of America, together with ChargePoint, the largest electric vehicle charging network, announced an initiative to create express charging corridors along heavily-traveled routes on the East and West Coasts.

Volkswagen lays off 500 Chattanooga workers

Fri, 19 Apr 2013

The redesigned Volkswagen Passat has been a decent seller since its debut in 2011, but sales have apparently dropped off enough that the automaker is trimming some of the employees from its Chattanooga, TN assembly plant. According to Automotive News, Volkswagen will be cutting shifts and laying off 500 contracted workers in response to slowing sales.
Currently, the plant has three teams running 10-hour shifts Monday through Saturday, but starting May 13, this will be reduced down to two teams running 10-hour shifts Monday through Thursday. This will be done to reduce dealer inventory (the article says that VW dealers, on average, have a 97-day supply of Passats) and production capacity (currently running at an annual pace of 170,000 units, which is more than the 150,000 annual units the plant was planned to produce).
This, of course, isn't saying that the Passat has been a failure since VW added 200 full-time employees to the plant in February 2012 to keep up with increased demand. The AN article says that automakers frequently overstaff plants during the launch of a new product - or in this case, a new product and a new plant - but eventually reduce the workers as things run smoother and more efficiently.