2009 Toyota Camry Le Sedan 4-door 2.4l on 2040-cars
Altamonte Springs, Florida, United States
Transmission:Automatic
Vehicle Title:Clear
Body Type:Sedan
Fuel Type:GAS
Mileage: 72,650
Make: Toyota
Sub Model: LE
Model: Camry
Exterior Color: Gray
Trim: LE Sedan 4-Door
Interior Color: Tan
Drive Type: FWD
Warranty: Unspecified
Number of Cylinders: 4
Options: Leather Seats, CD Player
Safety Features: Anti-Lock Brakes, Driver Airbag, Passenger Airbag, Side Airbags
Number of Doors: 4
Power Options: Air Conditioning, Cruise Control, Power Locks, Power Windows, Power Seats
Toyota Camry for Sale
- 2007 toyota camry salvage repairable rebuilder good airbags runs!!!(US $6,900.00)
- 2012 toyota camry se auto cd audio cruise ctrl only 15k texas direct auto(US $18,980.00)
- Le 2.5l cd front wheel drive power steering 4-wheel disc brakes brake assist a/c
- 2009 toyota camry 5 speed manual 76k miles(US $9,800.00)
- 2008 toyota camry le sedan 4-door 2.4l, 44k miles, light blue(US $12,000.00)
- 2003 toyota camry le sedan 4-door 2.4l reliable efficient daily driver
Auto Services in Florida
Z Tech ★★★★★
Vu Auto Body ★★★★★
Vertex Automotive ★★★★★
Velocity Factor ★★★★★
USA Automotive ★★★★★
Tropic Tint 3M Window Tinting ★★★★★
Auto blog
How Charlotte lost to Plano without even knowing it was dealing with Toyota
Thu, 08 May 2014With Toyota set to relocate its North American headquarters to the Dallas, TX suburb of Plano following a top-secret, 100-city search, the cities that missed out can now begin asking themselves what happened during a process they apparently knew little about.
That's a particularly brutal task for Charlotte, which, according to North Carolina's Secretary of Commerce, Sharon Decker, finished second to Plano. While Toyota has been fairly open about what it was looking for in a new headquarters city - direct flights to Japan, proximity to its US production facilities, a lower cost of living, high-quality educational facilities and finding a neutral site suitable to the California, Kentucky and New York-based employees that would be relocated - it's been less open about how the finalist cities, which also included Atlanta and Denver, stacked up against each other.
The Charlotte Observer has a few ideas. Part of the problem is the distinct lack of direct flights between Charlotte and Asia. US Airways, which operates a hub at Charlotte/Douglas International Airport, doesn't fly to Asia.
Audi investing $30.3 billion through 2018 for product expansion
Sun, 29 Dec 2013How does Audi plan to reach two million units in annual sales and pay for the 11 new models it's adding to its lineup - an expansion that may include models named SQ2, Q9 and F-Tron? By increasing its investment to 22 billion euros ($30.3 billion US) between now and 2018. That figure represents an increase of about 500 million euros over the previously planned outlay, according to a report by Automotive News, and that could be due to Audi wishing to goad the momentum that pushed it to 1.5 million annual sales two years ahead of schedule.
It's also about staving off the challenges from BMW and Mercedes-Benz. Now that BMW has been able to turn some of its attention away from its "i" series of Megacity cars, it will reportedly spend more than planned in 2014 as it continues the rollout of ten all-new vehicles and 15 new-generation vehicles through the end of next year. Mercedes, having been dropped to third in the sales race, is preparing to add 13 new cars over the next six years.
Audi's money is going into technology, into product like the next-generation TT and the Q1 and production expansions and upgrades all over the world. The expenditure represents just under a fourth of Volkswagen's 84.2 billion-euro ($115.7 US) outlay devoted to taking the number-one global automaker title away from General Motors and Toyota by 2018.
Mazda's new Mexican plant capacity rises to 230,000
Sat, 05 Jan 2013After the turmoil of last year, 2013 is getting off to a much better start for Mazda. The company has issued a release indicating that the forthcoming plant in Salamanca, Mexico has had its production capacity raised even though it isn't scheduled to go online until March 2014. The original plans called for a 140,000-unit capacity, 90,000 of that allotted for the Mazda2 and Mazda3, the remaining 50,000 for a small car Mazda would build for Toyota that would be based on the Mazda2. The new plans call for raising that by 90,000 units to a total of 230,000 units within two years, by the end of March 2016, and it looks like it will all go toward Mazda production to satisfy growing demand for Skyactiv vehciles. The Mexican plant's opening will be the return of Mazda manufacturing to North America, after Mazda6 production was moved back to Japan last year.
More good news for the company is that it projects 10 billion yen ($114 million) in net income for the financial year that will end in March. That would be a welcome turnaround from the 100-billion-yen loss in the previous financial year, part of a series of three annual losses in a four-year span.
You'll find the press release with the factory update below.