2012 St Crew 4x4 Longbed Uconnect Bluetooth Cummins Diesel Lifetime Warranty on 2040-cars
Vernon, Texas, United States
For Sale By:Dealer
Engine:6.7L 408Cu. In. l6 DIESEL OHV Turbocharged
Body Type:Crew Cab Pickup
Transmission:Automatic
Fuel Type:DIESEL
Cab Type (For Trucks Only): Crew Cab
Make: Ram
Warranty: Vehicle has an existing warranty
Model: 2500
Trim: ST Crew Cab Pickup 4-Door
Disability Equipped: No
Drive Type: 4WD
Doors: 4
Mileage: 0
Drive Train: Four Wheel Drive
Sub Model: ST Crew Cab
Inspection: Vehicle has been inspected
Exterior Color: White
Interior Color: Gray
Number of Cylinders: 6
Ram 2500 for Sale
2012 st crew 4x4 longbed uconnect voice command cummins diesel(US $39,153.00)
2012 st crew 4x4 uconnect bluetooth cummins diesel trailer brake controller(US $38,681.00)
2012 st crew 4x4 cummins turbo diesel protection group lifetime warranty(US $36,987.00)
2012 longhorn limited mega 4x4 navigation sunroof leather heated rear dvd diesel(US $52,848.00)
2012 longhorn limited crew 4x4 navigation sunroof leather rear dvd diesel(US $51,888.00)
2012 laramie longhorn crew 4x4 navigation sunroof leather heated cooled diesel(US $49,980.00)
Auto Services in Texas
Zepco ★★★★★
Z Max Auto ★★★★★
Young`s Trailer Sales ★★★★★
Woodys Auto Repair ★★★★★
Window Magic ★★★★★
Wichita Alignment & Brake ★★★★★
Auto blog
Ram pickups to keep it steel through 2020
Fri, 22 Aug 2014One of the hottest topics in the industry these days is automakers' expanding use of aluminum, especially for vehicle bodies and platforms. While the lightweight metal has historically been the preserve of premium brands and sports cars, Ford shocked the industry when it announced that its 2015 F-150 would go aluminum-intensive for its new generation. As it turns out, the material change doesn't even mean a big jump in the prices for most of its trims. Possibly in reaction to the big change, General Motors is said to be using the lightweight metal in its next-gen trucks, too. That only leaves Ram as an open question among the domestics, and at least for now, the company is apparently in no hurry to push tin.
According to Reuters speaking with two, unnamed insiders, the Ram 1500 isn't getting an aluminum infusion until sometime after 2020. That's not to say the truck is going to be stagnant for the next half-decade or more, of course. According to Ram's five-year plan, there's a refresh for the 1500 coming in 2015 and much bigger changes on the way in 2017. Those same sources tell Reuters that further revisions aren't expected until at least 2021, which is when the aluminum could be added.
Fiat Chrysler Automobiles CEO Sergio Marchionne hasn't minced words about his thoughts on using the lightweight metal in pickups. "I have better use of aluminum in this house than a pickup truck," he said in May. Having said that, Marchionne was clear that if the material turns out to be revolutionary in the segment, the company would be willing to follow.
FCA CEO Mike Manley will take undefined new role after PSA merger
Wed, Dec 18 2019MILAN — Fiat Chrysler Chief Executive Mike Manley will remain with the new group set to result from a planned merger with French rival PSA-Peugeot, Chairman John Elkann said on Wednesday. In a letter to Fiat Chrysler (FCA) employees on the day the two companies announced a binding agreement for a $50 billion tie-up to create the world's fourth-largest carmaker, Elkann said he was "delighted" that the combined group would be led by current PSA CEO Carlos Tavares. "And Mike Manley, who has led FCA with huge energy, commitment and success over the past year, will be there alongside him," he said. He did not say what position Manley would hold. Elkann — who will chair the new group — said there was still much to be done to complete the merger. "Over the coming months we must work tirelessly and determinedly to fulfill all the approval requirements needed to finalize the commitment we have signed," he said. Related Video:   Hirings/Firings/Layoffs Chrysler Dodge Fiat Jeep RAM Citroen Peugeot FCA PSA merger Mike Manley carlos tavares
Huge, pricey trucks haul jobs and profits for the Detroit Three
Tue, Feb 5 2019DECATUR, Texas — Mickey McMaster is on his 12th pickup truck. The 61-year old farm equipment dealer in Decatur, Texas, two weeks ago treated himself to a 2019 GMC Denali for around $69,000 — a reward for long hours at work. "For me this is the Cadillac of trucks, it's a real luxury vehicle," McMaster said. "I've worked my way up to afford a truck like this and it shows that I've earned it." McMaster is the kind of customer General Motors Co is banking on as it plans to add 1,000 jobs at a plant in Flint, Michigan that will build a new generation of its largest pickups. Demand from Texas and other heartland states for big pick-ups is providing a lifeline to many workers the No. 1 U.S. automaker is laying off at plants elsewhere. The Detroit Three automakers and thousands of their U.S. workers are counting on customers like McMaster to keep buying bigger and more luxurious pickup trucks even if overall U.S. vehicle demand weakens this year, as most analysts predict. At Flint, GM will build a new generation of its heavy-duty Chevrolet Silverado and GMC Sierras, including luxury models that are some of the most profitable vehicles on the planet. GM, Ford Motor Co and Fiat Chrysler Automobiles NV's Ram division own the segment and are each doubling down with new or redesigned models launching this year. Sales of heavy-duty pickups in the United States have grown to more than 600,000 vehicles a year, up more than 20 percent since 2013, according to industry data. Prices for luxury models can easily top $70,000. GM on Tuesday celebrated the launch of a new generation of heavy-duty GMC and Chevrolet pickups at the assembly plant in Flint, Michigan, that is now building all such trucks for the company. At the same time that GM is laying off thousands of U.S. workers and planning to shutter five North American factories, Flint is hiring. The plant runs on three daily shifts, six days a week. As the new model's assembly system ramps up, the plant's capacity will increase by more than 25 percent, plant manager Mike Perez told Reuters. The Flint plant plans to add 1,000 workers, more than half of the 1,500 factory workers who have asked to transfer from plants GM has targeted for shutdown as part of CEO Mary Barra's restructuring plan. "We're bringing in 50 to 100 people every week," said Perez. Workers last week were still finishing the job of retooling the Flint factory to build the new heavy-duty trucks as part of a $1.5 billion investment project.