Black Range Rover Hse 4.6 1997 Needs Fuel Pump on 2040-cars
Kennebunk, Maine, United States
1997 range rover hse 4.6 fix pr part out text 207-391-3588 for pics and more info
|
Land Rover Range Rover for Sale
- 2004 land rover range rover hse(US $10,500.00)
- 1995 land rover range rover classic county lwb
- 2012 land rover range rover hse luxury suv $88k+msrp harman/kardon navigation(US $66,800.00)
- 1996 land rover range rover se sport utility 4-door 4.0l(US $14,995.00)
- 2011 land rover range rover sport nav, leather rare color brown interior
- 2006 land rover range rover hse! 22" asanti wheels, headrest tvs!
Auto Services in Maine
Wheel House Auto Salvage ★★★★★
We Care Auto Repair ★★★★★
USA Transmissions ★★★★★
Thayers Complete Auto Service ★★★★★
Portland Collision ★★★★★
Family Motors ★★★★★
Auto blog
Watch a Cayenne Turbo S, Range Rover SVR, and Cherokee SRT drag race
Thu, Mar 17 2016We live in a weird world where high-performance SUVs could win a 60-mile-per-hour sprint against sports cars from just a few years ago. Here, Top Gear sets up a three-way drag race against the Porsche Cayenne Turbo S, Land Rover Range Rover Sport SVR, and Jeep Grand Cherokee SRT, and the results show just how quickly these high-riding models can cross the quarter mile. The Cherokee SRT is the patriotic choice among the three, but it's down on power in this fight. Meanwhile, the Range Rover's menacing growl sounds the best, and the Cayenne Turbo S has the most horsepower. You'll have to watch the video to see which SUV will win this battle. Related Video:
Jaguar Land Rover output at two UK plants hit by chip shortage
Thu, Apr 22 2021LONDON — Output at two of Jaguar Land Rover's (JLR) British car factories will be temporarily halted from Monday, due to COVID-19 supply chain disruption, including a lack of semi-conductors, the firm said on Thursday. "We have adjusted production schedules for certain vehicles which means that our Castle Bromwich and Halewood manufacturing plants will be operating a limited period of non-production from Monday 26th April," the Tata Motors-owned company said. The COVID-19 pandemic has driven up demand for semiconductor chips for use in electronics like computers, as people worked from home, and suppliers are struggling to adjust, hitting output at many automakers. Trade flows have also been affected. On Wednesday, carmaker Stellantis said it would replace digital speedometers with more old-fashioned analogue ones in one of its Peugeot models, as the fallout continues. Renault's finance chief said on Thursday that car production fell by tens of thousands of vehicles in the first quarter as a result of the shortage. Output at JLR's third British car factory in Solihull, central England, will continue, the company said. "We are working closely with affected suppliers to resolve the issues and minimize the impact on customer orders wherever possible." Â
All-electric Jaguar XJ coming soon on platform shared with 'Road Rover'
Mon, Jun 24 2019We've been posting on the likelihood of electric Jaguars for a while now, especially the XJ leading the charge as a new EV flagship. Rumors at the beginning of 2018 predicted an XJ EV on our doorstep by the end of 2018, the 50th anniversary year of the XJ. By April this year, it was looking like the battery-powered XJ would use the I-Pace platform and make an appearance sometime in 2019. Now, Automotive News Europe reports that during Jaguar Land Rover's Investor's Day presentations, the automaker said it would debut a "large SUV and a large premium sedan" on its Modular Longitudinal Architecture (MLA) suitable for EVs, hybrids and traditional ICE-powered cars. The sedan in question is the next-gen XJ. Nick Rogers, JLR's product engineering boss, said electric MLA vehicles will get 90.2-kWh batteries that return range of up to 400 kilometers (292 miles) on the European cycle. That would effectively be the same size battery as the I-Pace, which rides on its own one-off platform, and the same range; in the U.S., the I-Pace is rated at 234 miles. It's said the XJ's design, produced by former Jaguar design chief Ian Callum and his team, has already been cleared. It swaps the four-door body for a five-door, a la the Audi A7, and introduces a new design language for the car and the carmaker. Car and Driver says the new statement sedan aims to be "a cutting-edge alternative to the BMW 7 Series and Mercedes-Benz S-Class," and Autocar saying it will "remain Jaguar's flagship in preference to a large SUV, such as the rumored J-Pace." The point of introducing the EV first is to establish the car's technology and sporting credentials — hopefully before the Porsche Taycan and Audi E-Tron GT arrive. Eventually, an ICE version of the XJ powered by an Ingenium inline-six should come; that will welcome buyers not ready to make the all-EV switch, a necessary move in keeping with the XJ's competition for global sales with the S-Class and 7 Series. However, leaving room in the design for a conventional drivetrain will force compromises that the all-electric competition doesn't face. Production of the current XJ ends at the Castle Bromwich facility on July 5. The new sedan is slated to be "announced in the near future" and built at JLR's plant in Solihull, which assembles Land Rover products. The same MLA platform will support a road-focused Land Rover as a sibling to the XJ, dubbed the "Road Rover" internally.