Find or Sell Used Cars, Trucks, and SUVs in USA

2015 Land Rover Range Rover on 2040-cars

US $18,550.00
Year:2015 Mileage:60000 Color: Black
Location:

Indio, California, United States

Indio, California, United States

5.0L V8 Engine, Leather Seats, Power Front Seats, Heated/Ventilated Front Seats, Heated Leather Steering Wheel,
Steering Wheel Audio Controls, Cruise Control, Meridian Premium Audio System, Bluetooth, Navigation System, rear
view Camera, Panoramic Sunroof, Power Windows, Power Door Locks, Power Exterior Mirrors, Rear Spoiler, Fog Lights,

Auto Services in California

Yoshi Car Specialist Inc ★★★★★

Auto Repair & Service
Address: 15 Auburn Ave, Baldwin-Park
Phone: (626) 355-2553

WReX Performance - Subaru Service & Repair ★★★★★

Auto Repair & Service
Address: 611 Galaxy Way, Salida
Phone: (209) 661-1017

Windshield Pros ★★★★★

Auto Repair & Service, Windshield Repair, Windows
Address: 7500 Folsom Blvd, Gold-River
Phone: (916) 381-8144

Western Collision Works ★★★★★

Automobile Body Repairing & Painting
Address: 709 N Gramercy Pl, Commerce
Phone: (323) 465-2100

West Coast Tint and Screens ★★★★★

Auto Repair & Service, Door & Window Screens, Window Tinting
Address: Dulzura
Phone: (760) 471-8939

West Coast Auto Glass ★★★★★

Auto Repair & Service, Windshield Repair, Glass-Auto, Plate, Window, Etc
Address: 9157 W Sunset Blvd, Century-City
Phone: (323) 332-6015

Auto blog

Jaguar opens new engine plant in the UK

Thu, 30 Oct 2014

The heads of Jaguar Land Rover are having a busy couple of weeks opening factories. Just days after inaugurating the company's first overseas plant in China, the automaker's new Engine Manufacturing Center in the UK is being inaugurated, as well. The plant near Wolverhampton, England, marks the first time in decades that JLR is building its own powerplants in-house. Further signaling the importance of this launch for the business, Queen Elizabeth II and Prince Philip were on hand and even tweeted about it.
The factory's first major project is to build JLR's latest Ingenium four-cylinders, starting with the 2.0-liter diesel version. "Our new Engine Manufacturing Centre is an important step in advancing the competitiveness and capability of the UK automotive sector. The production of in-house engines will support the expansion of the UK supply chain providing critical mass for inward investment," said Trevor Leeks, plant operations director in the automaker's announcement.
Opening the doors to the Engine Manufacturing Center has been years in the making for JLR. The plant was first announced in September 2011 and broke ground in June 2012. Building it cost the company 500 million pounds ($800 million) and created 1,400 new jobs. Of course, being a state-of-the-art factory, considerations were made to make the place as energy efficient as possible. That meant installing the UK's largest solar array with 21,000 panels to produce about 30 percent of the site's electricity needs.

Ferrari exec to lead Jaguar North America

Tue, 06 Aug 2013

Jaguar has announced that Jeff Curry will be serving as the brand's new North American vice president, effective August 13. The move is a coup for Jag, which lured Curry away from his previous posting as VP of marketing for Ferrari North America, and is further evidence of just how strong Jaguar's comeback has gotten.
Curry has spent over 20 years in the auto industry, and has worked with Audi, SiriusXM and Land Rover, where he made his start in the industry. His primary responsibilities with Jaguar will cover marketing communications, customer relationship management, and product planning.
Jaguar Land Rover's North American president, Andy Goss, heaped praise on the brand's newest addition saying, "Jeff brings with him extensive automotive and luxury marketing experience, critical expertise in leading-edge technologies and a personal passion for automobiles."

Jaguar Land Rover says key models in short supply, some have six-month wait lists

Fri, 08 Aug 2014

Care for a bit more proof that the Jaguar Land Rover portfolio of vehicles is the best it's ever been? Well, the Indian-owned pair of brands saw a record year in 2013, while 2014 has seen a 14-percent increase in sales. The crazy thing is, though, is that figure could be even higher, provided the company had the production capacity.
JLR is running a six-month waiting list on two of its most popular models, the Range Rover Sport (above) and Range Rover. According to Mark White, the company's chief technologist for body engineering, the blame can be placed on the paint shop at the company's Solihull factory, in the UK.
"We will probably max out the paint shop before we max out the body shop. Putting the second body shop in has given us the flexibility to ebb and flow the different models that go through there and meet the capacity demands we've got," White told Automotive News. "However, you always hit a bottleneck somewhere. And the paint shop is probably going to be the next biggest obstacle."