1983, New White Paint, Ready To Restore, Excellent Running Condition. on 2040-cars
Rowland Heights, California, United States
|
1983 Jeep Wagoneer, All details Listed
|
Jeep Wagoneer for Sale
1989 jeep grand wagoneer base sport utility 4-door 5.9l(US $4,000.00)
1987 jeep grand wagoneer base sport utility 4-door 5.9l 4wd 144000 p/u minnesota(US $2,450.00)
1969 jeep wagoneer base sport utility 4-door(US $11,295.00)
1991 jeep grand wagoneer base sport utility 4-door 5.9l
1971 jeep wagoneer 4wd....extremely rare survivor!!!!!(US $6,500.00)
Beautiful 1982 jeep limited grand wagoneer
Auto Services in California
Zenith Wire Wheel Co ★★★★★
Yucca Auto Body ★★★★★
World Famous 4x4 ★★★★★
Woody`s & Auto Body ★★★★★
Williams Auto Care Center ★★★★★
Wheels N Motion ★★★★★
Auto blog
FCA and UAW deal could mean huge production shakeups
Thu, Sep 17 2015The big labor contract between Fiat Chrysler Automobiles and the United Auto Workers is likely to lead to some very serious production shakeups across the company's North American manufacturing operations. That's according to a new report from Automotive News, which details the sweeping changes at no fewer than five production facilities in Michigan, Illinois, Ohio, Mexico, and Poland. So without further ado, here's what's going where, presented in easy to digest bullet form. Ram 1500 production would move from Warren, MI to Sterling Heights, MI Warren, MI would be retooled for unibody production and would handle the Jeep Grand Wagoneer and could potentially build Grand Cherokees to ease the strain on Detroit's Jefferson North factory Chrysler 200 production would move from Sterling Heights, MI to Toluca, Mexico Dodge Dart production would move from Belvidere, IL to Toluca, Mexic Fiat 500 production, which is currently handled by Toluca, would be concentrated in Poland, where the Euro-spec Cinquecento is built Jeep Cherokee production would move from Toledo, OH to Belvidere, IL to make room for Wrangler and Wrangler Pickup production Like we said, those are some big changes. But, as FCA CEO Sergio Marchionne said in an earlier interview with Automotive News, this kind of shakeup would make a lot of sense. In that August interview the exec said that automakers moved truck production to Mexico because they were "threatened" by the UAW. "The only thing [the UAW] want is to move the truck back. Which is right. If you move the truck back here, which is [the UAW's] domain, [and move] all the cars that we get killed on somewhere else, we could actually make sense of this bloody industry and actually increase the number of people employed in this country and really share wealth because we are making money," Marchionne told AN. News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing UAW/Unions Chrysler Dodge Fiat Jeep RAM Sergio Marchionne FCA toluca warren sterling heights
2018 Jeep Wrangler Rubicon Alaska Cannonball | 14,000 miles to Deadhorse and back
Fri, Jul 27 2018I've never delayed big adventure long enough to fill a bucket. But I do have a bucket item that dates to 1992: drive from Deadhorse, Alaska, to Tierra del Fuego, Argentina. Twenty-six years later, it's time. But first, I needed a vehicle. And a Jeep Wrangler was not my first choice. Growing up as a kid in the Midwest, I loved Jeeps. But around 10 years ago I went on a camping trip to Death Valley with a colleague, testing the early JK Wrangler against the competition. By the end of it, I couldn't justify the ergonomic and physical punishment for the admittedly massive capability. So two years ago, I bought a 1994 Toyota Land Cruiser project truck to make the journey. I paid too much, and the Cruiser revealed itself to be not a garage project, but the Manhattan Project. I took this as a good omen. Adventure begins in the deep end, so why wait to get there? During a break from discovering enough gremlins to reboot the movie franchise, I had dinner with Jeep's West Coast PR guy. I mentioned my plans for a six-month overlanding trek to Alaska. He said, "You know, we've got a new Wrangler coming out — that might be a good test of the chassis." My outside voice said, "That would be interesting." My inside voice said, "Hmmm." Anything's possible after 10 years, right? I might like it. Might. Many plans have gone awry on the way to this moment. It's taken more than a year to lock in a start date, because Jeep couldn't spare a Wrangler Rubicon. Everyone else in America keeps buying them. A suitable Wrangler was found eventually, but now the deed had to be done in three months, not six. What was going to be a comfortably-paced, backwoods roll up to Alaska and back has turned into the Rubicon Overland Cannonball. I know 14 weeks is plenty of time to drive to the Arctic and back. (Tierra del Fuego is officially off the itinerary.) However, the point of this trip is to fit in as much dirt, as many bucket-list trails, and all the wild America possible. That means my route's about 14,000 convoluted miles of criss-crossing the country in all the cardinal directions. And that's assuming everything goes to plan. Until last week, I was doing this trip with a friend from college who lives in Marietta, Georgia. He was the photo/video guy. Then he had a medical emergency, so the only trip he's taking is to the OR and rehab. Now I'm going by myself, and I think it's important to point out that I have no idea what I'm doing. That isn't modesty, that's truth: zero clue.
Stellantis will build four electric vehicles in Italy, say union reps
Wed, Jun 16 2021MILAN — Stellantis will produce four medium-segment electric vehicles, of different brands, at its Melfi plant in southern Italy from 2024, the UILM union said on Tuesday. Since Stellantis was formed at the beginning of this year through the merger of Fiat Chrysler and France's PSA, production in Italy has been under scrutiny for costing more than elsewhere in Europe. "Stellantis announced that Melfi would be the first plant in Italy to get new models, based on post-2022 business plan," UILM said in a statement after workers' representatives met with the carmaker at Italy's industry ministry in Rome. Future production at Melfi will be based on a single enhanced production line that will merge the two existing ones, the union said, adding the restructuring will leave production capacity at the site unchanged at around 400,000 units. UILM's head, Rocco Palombella, said unions had not received all the answers they wanted as Stellantis was still working on its new business plan. "But the positive element is that the company has not absolutely called for structural redundancies," he said after the meeting. Stellantis Chief Executive Carlos Tavares has said the group would present its business plan late this year or in early 2022. Stellantis, the world's fourth-largest carmaker, gave no details about what was discussed at the meeting. In an earlier statement the company said it was working "with determination and speed" to support the energy transition of all its Italian sites. Italy's Industry minister, Giancarlo Giorgetti, however, said in a separate statement after the meeting that Stellantis had yet to decide where it would build its third electric battery plant in Europe. Stellantis, which already has two battery factory projects in France and Germany, has said adding gigafactories in Europe and the United States would be decided this year. The company is holding talks on this with Rome, as Italy is one of its main production hubs in Europe. Related video: Green Plants/Manufacturing Alfa Romeo Fiat Jeep Citroen Opel Peugeot Stellantis
