Find or Sell Used Cars, Trucks, and SUVs in USA

Portfolio Heated Cooled Nav Navigation Massage Panoramic Streaming Sat B&w Audio on 2040-cars

US $48,995.00
Year:2011 Mileage:36936 Color: Black
Location:

Chantilly, Virginia, United States

Chantilly, Virginia, United States
Advertising:

Auto Services in Virginia

Whitten Brothers Mazda ★★★★★

Auto Repair & Service, New Car Dealers, Automobile Body Repairing & Painting
Address: 900 Johnston Willis Drive, Moseley
Phone: (866) 595-6470

West Broad Audi ★★★★★

Auto Repair & Service, New Car Dealers, Automobile Body Repairing & Painting
Address: 9001 W Broad St, Manakin-Sabot
Phone: (804) 270-9000

Watkin`s Garage ★★★★★

Auto Repair & Service
Address: 104 S Henry St, Spencer
Phone: (336) 573-9115

Virginia Auto Ctr ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting, Automobile Parts & Supplies
Address: 17906 Fraley Blvd, Lake-Ridge
Phone: (703) 441-2020

Victory Lane Auto Sales ★★★★★

Auto Repair & Service, New Car Dealers, Automobile Body Repairing & Painting
Address: 3245 Boulevard, Pocahontas
Phone: (804) 524-0640

Van`s Garage ★★★★★

Auto Repair & Service
Address: 77 Wayside Dr, Weyers-Cave
Phone: (540) 234-8294

Auto blog

Jaguar models could rev with inline-six engines again

Tue, Apr 19 2016

Rumors are swirling once again that Jaguar might return an inline-six engine to its lineup. Autocar claims Jaguar Land Rover will use the modular Ingenium engine family to create a 3.0-liter straight-six. The new motor will replace the automaker's current V6. As with the Ingenium 2.0-liter four-cylinder, JLR will likely offer the powerplant in gasoline- and diesel-fueled versions. A rumor in May 2015 also suggested JLR would create an Ingenium-based turbocharged 3.0-liter inline-six and a 1.5-liter three-cylinder unit. According to Autocar, the engine bay in the XE, XF, and F-Pace can already fit the longer engine. The automaker isn't talking, though. "We can't comment on future product one way or another," company spokesperson Nathan Hoyt told Autoblog. Jaguar built much of its performance legacy with straight-six-powered vehicles. While the C-Type and D-Type were winning races with the engine layout, practically every Jaguar production model used them as well. Today, straight-sixes are less common. BMW continues to use them, and Mercedes-Benz reportedly also plans to offer one soon. While Autocar's report is still just a rumor, the move to an inline-six could be advantageous for JLR. For example, using an Ingenium-derived design could simplify manufacturing by allowing the company to build the powerplant in one factory alongside the 2.0-liter version. Returning to a design with such an important heritage for Jaguar would also make life easy for the brand's marketing team because it could link the new engine to past racing glory. Related Video:

Jaguar XE SV Project 8 slices record Nuburgring lap down to 7:18.361

Wed, Jul 24 2019

No production four-door vehicle has ever come close to breaking a seven-minute lap on Germany's Nuburgring (we see you WRX STI Type RA NBR), but manufacturers are slowly inching toward the achievement a few seconds at a time. Jaguar announced that it returned to the famed racetrack with its XE SV Project 8 and clocked a 7:18.361 lap, a new sedan record that's 2.9 seconds faster than the Project 8's previous record.  When Jaguar debuted the Project 8 in 2017, it had the makings of a specialty car that would slither into the shadows as quickly as it blasted onto the scene. But it's been quite the opposite. Jaguar has continued development of the vehicle and offers three different versions, including a touring variant. Production has lasted into the 2019 model year, and we recently tested one to get a handle of just how monstrous the thing truly is.  Much can change and be learned in two years, though, and Jaguar wanted to follow up its first trip to the Nurburgring, where it posted a record-setting time of 7:21.23. Under the guidance of Project 8 development driver Vincent Radermecker, the Jag ran the circuit in 7:18.361 on July 8, 2019. It did so in two-seat track pack spec and on Michelin Pilot Sport Cup 2 R tires. Jaguar made sure to clarify a detail about the run and the time. The 2017 time was done on the then-used 20.6-kilometer (12.8 miles) setup, and so was this time. But starting in 2019, the Nurburgring began officially recording times on the full 20.832-kilometer (12.94 miles) lap. Using the 20.832 lap, the Project 8 recorded a time of 7:23.164. With that run, the 592-horsepower supercharged Project 8 is the first vehicle to set an official whole lap record in the mid-range production car class. Watch the 7:18 run in 360-degree video below.   This content is hosted by a third party. To view it, please update your privacy preferences. Manage Settings.

Here's today's round of auto plant closures in response to coronavirus

Fri, Mar 20 2020

More automakers have shuttered factories, as businesses everywhere work to slow the spread of the Covid-19 coronavirus — and as the pandemic slows sales and disrupts parts supply chains. On Friday, the following closures were announced: • Volvo will close its factories in Sweden and the United States from March 26 to April 14. Volvo's U.S. facility, in Charleston, South Carolina, makes the S60 sedan. Its assembly plant in Torslanda, Sweden, turns out the XC90, SC60, and V90. Other Swedish facilities make engines and component parts. A Volvo factory in Ghent, Belgium, that builds the XC40 and V60 closed earlier this week and is expected to remain offline until April 6. Volvo's four factories in China have been reopened after a shutdown earlier this year. • Jaguar Land Rover announced that it will suspend production at its assembly plants in the UK over the coming week. The shutdown is expected to last until April 20. Elsewhere, production continues at the company's factories in India and Brazil, and JLR's joint-venture plant in China reopened at the end of February. • Bentley is closing its factory in Crewe, England, for four weeks, effective today. • Bugatti has put its atelier in Molsheim, France, on hiatus. No date was given for when assembly of its supercars might resume. • Mercedes-Benz on Monday will shut down its SUV factory in Alabama and its van assembly plant in South Carolina. Both will remain closed for a minimum of two weeks. Tesla yesterday revealed that it will suspend operations at its Fremont, California, vehicle assembly plant next week, on order from local officials there. Yesterday's factory closure announcements also included the U.S. assembly plants for Toyota (until April 6), Volkswagen (through March 29), Subaru (through March 29), and Hyundai (no time period specified). They join GM, Ford, Chrysler, Honda, Nissan, and Harley-Davidson, which earlier this week announced the suspension of production at their facilities. Plants/Manufacturing Bentley Bugatti Jaguar Land Rover Mercedes-Benz Volvo coronavirus