Ex-l W/nav & Rear Dvd Ent Sys, Silver Pearl Metallic, 76,785 Miles, Clean Carfax on 2040-cars
San Juan Capistrano, California, United States
Body Type:Minivan, Van
Vehicle Title:Clear
Engine:3.5L 3471CC V6 GAS SOHC Naturally Aspirated
Fuel Type:Gasoline
For Sale By:Private Seller
Make: Honda
Model: Odyssey
Trim: EX-L Mini Passenger Van 4-Door
Options: Sunroof, Leather Seats, CD Player, Honda Navigation System, Honda DVD Rear Entertainment System
Safety Features: Anti-Lock Brakes, Driver Airbag, Passenger Airbag, Side Airbags
Drive Type: FWD
Power Options: Air Conditioning, Cruise Control, Power Locks, Power Windows, Power Seats
Mileage: 76,800
Exterior Color: Silver
Interior Color: Gray
Warranty: Vehicle does NOT have an existing warranty
Number of Cylinders: 6
Disability Equipped: No
Honda Odyssey for Sale
2003 honda odyssey ex mini passenger van 5-door 3.5l
2008 honda odyssey ex-l sunroof nav rear cam dvd 83k mi texas direct auto(US $17,980.00)
2003 honda odyssey lx mini passenger van 5-door 3.5l(US $6,999.00)
Ex-l 3.5l cd 7 speakers am/fm radio mp3 decoder radio data system xm radio(US $27,000.00)
Get ready for summer! rare "ex-l" package!! moonroof! xm radio! dual climate!
1999 honda odyssey ex mini passenger van 5-door 3.5l(US $2,600.00)
Auto Services in California
Yuki Import Service ★★★★★
Your Car Specialists ★★★★★
Xpress Auto Service ★★★★★
Xpress Auto Leasing & Sales ★★★★★
Wynns Motors ★★★★★
Wright & Knight Service Center ★★★★★
Auto blog
Honda production knocked offline by ransomware cyberattack
Tue, Jun 9 2020Honda has suspended automobile and motorcycle production at several facilities around the globe due to a suspected ransomware cyberattack. According to reports in Japan, domestic production is back online and shipments are flowing out of its Japanese plants. Facilities in Ohio, where popular models like the Accord and CR-V are produced along with the Acura ILX, TSX and NSX, as well as those in Turkey, India and Brazil are reportedly still offline. "On Sunday, June 7, Honda experienced a disruption in its computer network that has caused a loss of connectivity, thus impacting our business operations," Honda said in a statement. "Our information technology team is working quickly to assess the situation." The suspected attack affected Honda’s production globally starting on Monday, forcing some plants to stop operations as the company needed to ensure that its quality control systems were not compromised. In addition, the automaker confirmed via Twitter that its Customer Service and Financial Services are currently unavailable. At this time Honda Customer Service and Honda Financial Services are experiencing technical difficulties and are unavailable. We are working to resolve the issue as quickly as possible. We apologize for the inconvenience and thank you for your patience and understanding. — Honda Automobile Customer Service (@HondaCustSvc) June 8, 2020 The Telegraph (subscription required) in the UK reports that Honda's servers were infected with the EKANS (that's snake spelled backwards) malware, which encrypts data until payment is made to the attackers, who then provide the decryption key. Related Video:
180,000 new vehicles are sitting, derailed by lack of transport trains
Wed, 21 May 2014If you're planning on buying a new car in the next month or so, you might want to pick from what's on the lot, because there could be a long wait for new vehicles from the factory. Locomotives continue to be in short supply in North America, and that's causing major delays for automakers trying to move assembled cars.
According to The Detroit News, there are about 180,000 new vehicles waiting to be transported by rail in North America at the moment. In a normal year, it would be about 69,000. The complications have been industry-wide. Toyota, General Motors, Honda and Ford all reported experiencing some delays, and Chrysler recently had hundreds of minivans sitting on the Detroit waterfront waiting to be shipped out.
The problem is twofold for automakers. First, the fracking boom in the Bakken oil field in the Plains and Canada is monopolizing many locomotives. Second, the long, harsh winter is still causing major delays in freight train travel. The bad weather forced trains to slow down and carry less weight, which caused a backup of goods to transport. The auto companies resorted to moving some vehicles by truck, which was a less efficient but necessary option.
Honda will build 2014 Accord Hybrid in Ohio
Thu, 10 Jan 2013Honda has announced that it will invest $23 million in its Marysville, Ohio facility to support production of the upcoming 2014 Accord Hybrid sedan. According to the manufacturer, this means approximately 50 new jobs will be created, and the whole investment will result in a 95,000-square-foot expansion of the Marysville plant.
The Accord Hybrid joins the decidedly homely Accord PHEV (pictured) this fall, using a 2.0-liter i-VTEC Atkinson cycle four-cylinder engine mated to a 124-kilowatt electric motor. Honda has yet to release official power or fuel economy figures for the non-plug-in hybrid version of the Accord.
Honda currently operates four manufacturing facilities in Ohio, with the combined capacity to build up to 700,000 cars and light trucks each year. The Japanese automaker also has a facility in Greensburg, Indiana, where the Civic Hybrid and Acura ILX Hybrid are built.