Find or Sell Used Cars, Trucks, and SUVs in USA

1923 Ford Tbucket on 2040-cars

US $32,500.00
Year:1923 Mileage:389
Location:

Advertising:

 Ford T-Bucket. This is a very nice high end build 1923 tbucket with a new  GM 350 engine, 2 holly carbs , polished  tunnel ram. everything on engine is chrome or polished aluminum . engine has less then 100 miles on it. currie polished rear end housing  gears are 370 with posi, with 31 spline axles, polished drive shaft .b&m 350 transmission . polished disc brakes all a round ,chrome front end the interior job is done in black ultra leather with flames .this car is like new with lots of chrome and lost of room . chrome tilt wheel and cd player  .paint is house of kolor blue with ghost flames .car is very dependable and ready to show and go. This tbucket is nice and smooth driving hotrod. Tbucket passed NSRA inspection  w/sticker .tbucket was mostly hauled to car shows and cruised around town .We don't need any help in selling or advertising this car.
 

Price - $ 32,500  OBO
 

479-970-9631 located in Russellville AR.

Auto blog

2015 Ford F-150 begins rolling off line at second factory

Sun, Mar 15 2015

Ford needs more F-150s. Yeah, we just told you that a few days ago. The Blue Oval is reporting that its trucks are spending a mere 18 days on dealer lots, following a January that was the truck's best month in over a decade. Considering both of those facts, the timing is perfect for Ford to ramp up production of its all-aluminum truck by bringing its Kansas City, MO factory online. KC Assembly has been building F-150s for decades, and completed a $1.1-billion expansion to accommodate the all-aluminum 2015 truck (as well as for work on the Transit van). Similar to what was done at Ford's Dearborn, MI factory, the Blue Oval spent 13 weeks upgrading the plant's body shop, paint shop and a road-test course. Over 900 jobs were added as part of the update. Combined with the equally upgraded plant in metro Detroit, Ford can build 700,000 trucks per year. "The all-new F-150 has surpassed our expectations – setting new standards for fullsize truck capability, technology and efficiency," Joe Hinrichs, Ford's Americas president said in a statement. "With production starting at Kansas City Assembly, we are better poised to start meeting growing customer demand for our pickup." Scroll down for the official press blast from the Blue Oval. Related Video: KANSAS CITY ASSEMBLY PLANT COMES ON LINE AS SECOND U.S. FACTORY BUILDING ALL-NEW FORD F-150 2015 Ford F-150 starts production at Kansas City Assembly Plant; along with three shifts in operation at Dearborn Truck Plant, Ford is now producing even more units of the toughest, smartest, most capable F-150 ever All-new F-150 is turning more than four times faster than the overall full-size pickup truck segment; In addition to producing all F-150 models and cab configurations, Kansas City exclusively builds specialty F-150s with 8-foot cargo boxes and heavy payload packages to meet the needs of commercial fleet customers Kansas City Assembly Plant facilities transformed with the latest in manufacturing technology to build the first mass-produced truck in its class featuring a high-strength, military-grade, aluminum-alloy body and bed CLAYCOMO, Mo., March 13, 2015 – Ford today marks the official start of production of the all-new 2015 F-150 at Kansas City Assembly Plant, which joins Dearborn Truck Plant in building the toughest, smartest, most capable F-150 ever. This means Ford has expanded production of the first mass-produced light-duty pickup truck with a high-strength, military-grade, aluminum-alloy body.

All the details on Plug In 2014 electric vehicle conference you could ever want

Wed, Aug 6 2014

One of the best parts of the Plug In 2014 Conference in San Jose, CA last week was getting to listen in on thoughts about the state of the plug-in vehicle industry from people who have been involved with it for ages. They bristle when you call them the "Old Guard" (learned that one the hard way), but these are the people who have been through a number of ups and downs with plug-in vehicles, so they've got what we call perspective. Their knowledge was on full display in the three plenary sessions, which the Plug In Conference organizers have given us permission to share with you. Each is at least 90 minutes long, so make sure to set some time aside to enjoy the discussions after you download them (any help with making them streamable would be appreciated). Follow us below to see what we've got to offer. Opening Plenary (audio link). "The Road Ahead – Delivering on a Vision for Sustainable Transportation." Moderated by Mark Duvall (director of energy utilization at EPRI, the Electric Power Research Institute, and a long-time EV advocate), this panel featured: Jack Broadbent, Executive Officer / APCO, Bay Area Air Quality Management District Pat Romano, President & Chief Executive Officer, ChargePoint, Inc. Aaron Johnson, Senior Director, Customer Programs, Pacific Gas and Electric Company Brendan Jones, Director, EV Sales Operations & Infrastructure Deployment, Nissan North America, Inc. David W. Cash, Commissioner, MassDEP Dan Sperling, Director, Institute of Transportation Studies, University of California, Davis Highlights: Educating drivers to "get over the gas station" is a key strategy, how Level 2 and DC Fast Charging are really "a new paradigm," that there have been well over 214,000 EVs sold in US as of July 2014 and where Nissan sees huge potential for more EV sales (Northeast US and medium-size cities like St. Louis and Pittsburgh). Wednesday Morning Plenary (audio link). "Getting to the Mass Market – A Discussion of Ideas for Widespread PEV Adoption." Moderated by John Gartner, research director for smart transportation at Navigant Research.

Ford idling Michigan Assembly Plant to trim Focus, C-Max supply

Tue, 22 Oct 2013

Ford will be putting the brakes on production at its Michigan Assembly Plant in Wayne, MI, idling production during the weeks of October 28 and December 16. Ford is citing the first drop in US sales in 27 months, a 4.2-percent dip in September, as the impetus for trimming their supplies, according to Automotive News.
Ford's deft management of its supplies has been part of its success over the years, and seeing supplies of Focus and C-Max, the two vehicles built at MAP, rise from 58 and 108 days, respectively, to 71 and 122 days over the span of a month was apparently all that was need to justify the trimming. As AN points out, the rule of thumb for many automakers is to maintain a 60-day supply of vehicles.
"Ford has been focused on keeping their pricing in check. Their operating margin is in double digits. Nobody else is there and they're obviously very proud of that," Alan Baum, an auto analyst with Baum & Associates told AN. Keeping the supply chain operating smoothly and not increasing supplies too much is crucial to that healthy profit margin. After all, a large supply lowers prices ,which, in turn, cuts profit. So while this news might not be great for employees at MAP, who now have an extra two weeks of vacation time, it's far from a sign of problems in Dearborn. Quite the opposite, actually.