1953 Ford F100 Short Bed Pick Up on 2040-cars
Waukegan, Illinois, United States
Body Type:Pickup Truck
Vehicle Title:Clear
Engine:Mustang V8
Fuel Type:Gasoline
For Sale By:Dealer
Number of Cylinders: 8
Make: Ford
Model: F-100
Trim: 2 Door
Options: power steering, Leather Seats
Drive Type: Rear wheel drive
Mileage: 0
Sub Model: F 100
Number of Doors: 2
Exterior Color: Blue
Warranty: Vehicle does NOT have an existing warranty
Ford F-100 for Sale
1971 ford f-100 ranger(US $3,300.00)
1956 ford f-100 pickup truck
1967 ford f100 shortbed(US $3,500.00)
Very nice red short box with rebuilt motor runs great
1972 ford f100 "custom" 2wd short wheel base automatic(US $4,500.00)
1959 ford f100 completely restored v8(US $16,900.00)
Auto Services in Illinois
White Eagle Auto Body Shop ★★★★★
Tremont Car Connection ★★★★★
Toyota Of Naperville ★★★★★
Today`s Technology Auto Repair ★★★★★
Suburban Tire Auto Repair Center ★★★★★
Steve`s Tire & Service Center ★★★★★
Auto blog
Ford recalling 126,000 Fusions and Milans over wheel separation concern
Fri, 09 Dec 2011Ford has announced a recall of certain Ford Fusion and Mercury Milan vehicles after an investigation by the National Highway Traffic Safety Administration. A total of 128,616 2010 and 2011 models equipped with steel wheels may have been manufactured with wheel studs that could crack and split over time. If that happens, the vehicle may experience a wheel separation.
According to The Detroit News, the company is aware of a total of 30 wheel separation incidents, one of which occurred on the front of the vehicle. Even so, no injuries have been reported as a result of the defect.
The problem apparently stems from the fact that the mounting pads on the vehicles' steel wheels may have been faulty from the factory. In addition, the wheel mounting face on rear disc brakes may not have been installed properly. Ford will inspect the rear disc face and replace them as necessary. In addition, the company will replace all of the vehicle's wheel studs free of charge. Head to the NHTSA website for more information, and click past the jump to view the full recall notice.
Ford idling Michigan Assembly Plant to trim Focus, C-Max supply
Tue, 22 Oct 2013Ford will be putting the brakes on production at its Michigan Assembly Plant in Wayne, MI, idling production during the weeks of October 28 and December 16. Ford is citing the first drop in US sales in 27 months, a 4.2-percent dip in September, as the impetus for trimming their supplies, according to Automotive News.
Ford's deft management of its supplies has been part of its success over the years, and seeing supplies of Focus and C-Max, the two vehicles built at MAP, rise from 58 and 108 days, respectively, to 71 and 122 days over the span of a month was apparently all that was need to justify the trimming. As AN points out, the rule of thumb for many automakers is to maintain a 60-day supply of vehicles.
"Ford has been focused on keeping their pricing in check. Their operating margin is in double digits. Nobody else is there and they're obviously very proud of that," Alan Baum, an auto analyst with Baum & Associates told AN. Keeping the supply chain operating smoothly and not increasing supplies too much is crucial to that healthy profit margin. After all, a large supply lowers prices ,which, in turn, cuts profit. So while this news might not be great for employees at MAP, who now have an extra two weeks of vacation time, it's far from a sign of problems in Dearborn. Quite the opposite, actually.
Ford workers vote to ratify new four-year UAW contract
Sat, Nov 16 2019DETROIT — The United Auto Workers union said on Friday that rank-and-file members at Ford have voted in favor of a new four-year labor contract with the No. 2 U.S. automaker. The UAW will now focus on Fiat Chrysler Automobiles (FCA), the sole remaining Detroit automaker without a new labor contract. Talks with FCA are expected to begin on Monday, a UAW spokesman said. The union said 56.3% of Ford's hourly workers voted to approve the deal, which allowed the company to avoid a strike like the one that cost its larger rival General Motors about $3 billion (GBP2.3 billion). UAW leaders said earlier this month that Ford under the deal agreed to invest more than $6 billion in its U.S. plants, and to create or retain more than 8,500 UAW jobs. The deal also includes pay raises and lump-sum payments over the life of the contract, a pathway to full-time employment for temporary employees and unchanged healthcare coverage. Workers at GM approved a deal in late October that ended a contentious 40-day U.S. strike, the longest automotive labor stoppage since 1970. Detailed terms of the Ford deal — released just a week after GM workers approved their new contract — echoed those agreed to with GM, as the union typically uses the first deal as a template for those that follow. UAW leaders managed contract negotiations with Ford and GM, including the lengthy strike, while struggling with an ongoing federal corruption probe. To date, 10 people have pleaded guilty in connection with the criminal investigation into illegal payoffs. Just last week former UAW vice president and former GM board member Joseph Ashton was charged with conspiracy to commit money laundering and wire fraud. Earlier this month the UAW said that its president, Gary Jones, who had been linked to the ongoing corruption probe, was taking a leave of absence. Rory Gamble, the union's acting head, said last week he will examine every department of the union in response to the spreading federal corruption probe to prevent future misuse of members' dues.