13' E250 E-250 Cargo Van Work Truck 4.6l Flex Fuel Air Conditioning 1 Owner 8k on 2040-cars
Old Bridge, New Jersey, United States
Ford E-Series Van for Sale
1998 ford econoline wheel chair van
2007 ford e-350 super duty xlt standard passenger van 3-door 5.4l(US $12,000.00)
4x4 ford van 1987(US $2,000.00)
2001 ford e-350 econoline base standard cargo van 2-door 5.4l
2008 ford e-350 super duty base standard cargo van 3-door 6.0l(US $11,500.00)
1998 e-350 cng dedicated low low mile passenger van
Auto Services in New Jersey
Venango Auto Service ★★★★★
Twins Auto Repair Ii ★★★★★
Transmission Surgery & Auto Repair LLC ★★★★★
Tg Auto (Dba) Tj Auto ★★★★★
Szabo Signs ★★★★★
Stuttgart German Car Service ★★★★★
Auto blog
Ford and Chrysler reducing summer plant shutdowns
Wed, 22 May 2013Most domestic automaker assembly plants traditionally take a couple of weeks off during the summer. The shutdowns give each plant time for much needed repairs and maintenance, and in some cases, help better align production with demand. Not this year, though, as demand for many models is outstripping what Ford, Chrysler and General Motors plants can produce.
Ford has announced that it will shorten its annual summer shutdown for most North American plants from two weeks to one. The shorter shutdown will increase the carmaker's annual North American production by 40,000 units on top of the 200,000 extra units that it was already planning to produce this year versus last. Automotive News reports that Ford produced 2.8 million vehicles on this continent in 2012, and that output this year has already increased 13 percent through April.
Chrysler, meanwhile, is also operating at full tilt and plans to run some plants through the summer with no shutdown at all. Those not getting a break include Jefferson North where the Jeep Grand Cherokee and Dodge Durango are assembled, Toledo North that will assemble the new Cherokee, and Conner Avenue, home of SRT Viper production. Other assembly plants will be down for a single week, while all of Chrysler's engine and transmission plants except one in Indiana will continue operating with no shutdown this summer.
Signature Edition Ford Shelby GT500 Super Snake to get limited production run
Mon, Dec 22 2014The upcoming Ford Shelby GT350 Mustang keeps grabbing a horde of headlines thanks in no small part to the pony car's 5.2-liter V8 with a flat-plane crankshaft, magnetic dampers and other go-fast goodies. However, as the new contender enters the ring, Shelby American is saying goodbye to the old GT500 and the company's even more powerful Super Snake version with its new Signature Edition model. Limited to a total of 50 conversions on 2007-2014 coupe or convertible GT500s, the Shelby American Signature Edition packages some of buyers' most common choices into a single vehicle with a few extra touches, as well. The heart of it all is a 3.6-liter Kenne Bell supercharger to replace the V8's standard blower and take power up to a claimed 850 horsepower for the latest models. To keep things running at the proper temp, the mill gets an upgraded radiator, heat exchanger and aluminum cooling tanks, too. The rear brakes are also improved to slow this stallion down. In addition to the boosted power, buyers get some extra style. These special Super Snakes are available in all of the colors available on them from Ford, plus a range of shades for the stripe, and the wide body package can also be added as an additional option. The limited version wears 20-inch forged wheels from Weld that are 9.5-inches wide at the front and 10.5-inches at the rear and feature Signature Edition center caps. Inside, there's a commemorative badge with Shelby's signature on the airbag cover and Signature Edition floor mats. Finally, customers get a day training at the track to learn how to control this beast as part of the package. Orders for the Signature Edition are being accepted through January 31, 2015, and the modded model is priced at $44,995.00, which is in addition to the price of the stock GT500. Read below for Shelby American's full announcement of this limited Mustang. SHELBY AMERICAN'S SIGNATURE EDITION GT500 SUPER SNAKE PACKAGES TO HONOR FINAL 2007-2014 MODEL YEAR CARS NEWS RELEASE FOR IMMEDIATE RELEASE · Shelby American to offer 50 total Signature Edition Ford Shelby GT500 Super Snakes · Special badging and stripe colors offered for every model year for first time in history · Offer expires January 31, 2015 LAS VEGAS – Dec. 20, 2014 –Shelby American, a wholly owned subsidiary of Carroll Shelby International Inc. (CSBI:PK), has unveiled a Signature Edition Super Snake package to honor the end of production for the current generation Ford Shelby GT500.
FCA, Ford idle plants due to semiconductor shortage
Fri, Jan 8 2021DETROIT (Reuters) - Ford and FCA will become the latest automakers to idle production facilities due to a semiconductor shortage. Ford's Louisville Assembly Plant in Kentucky will idle for a week, borrowing a down period from later in the year to compensate. Per Automotive News, FCA is idling its Brampton facility in Ontario, Canada, and one other site which has not yet been identified. Louisville Assembly is the production site for the Ford Escape and Lincoln Corsair SUVs; Brampton Assembly produces the Chrysler 300, Dodge Charger and Dodge Challenger for FCA. A Ford spokeswoman, who declined to identify the semiconductor supplier, confirmed the temporary shutdown to Reuters. In this, FCA and Ford join Nissan and potentially Honda in idling production in the wake of the shortage, which also hit Volkswagen late last year. The shortages are being blamed on consumer demand for silicon after production slowdowns resulting from the coronavirus pandemic. Volkswagen said it had to adjust production schedules in China, Europe and North America to compensate. Nissan said it planned to reduce production of the Note, a hybrid electric car, at its Oppama Plant in Kanagawa prefecture, Japan, but did not give details of the scale of the output cut. The Nikkei newspaper reported that Nissan would slash its Note production at Oppama to about 5,000 units in January, from an initially planned 15,000 units. "A global shortage of semiconductors has affected parts procurement in the auto sector. As a result of this shortage, the Oppama Plant in Japan will adjust production in January, reducing production of the Nissan NOTE," Nissan said in a statement. (This article contains reporting from Reuters.)   Auto News Plants/Manufacturing UAW/Unions Chrysler Dodge Ford













































