2012 Dodge Challenger Sxt on 2040-cars
1215 Hwy 71 South, Fort Smith, Arkansas, United States
Engine:3.6L V6 24V MPFI DOHC
Transmission:5-Speed Automatic
VIN (Vehicle Identification Number): 2C3CDYAG0CH294029
Stock Num: 22040
Make: Dodge
Model: Challenger SXT
Year: 2012
Exterior Color: Black
Interior Color: Dark Slate Gray
Options: Drive Type: RWD
Number of Doors: 2 Doors
Mileage: 23801
Your satisfaction is our business! The Smith Chevrolet Cadillac Company EDGE! Put down the mouse because this 2012 Dodge Challenger is the car you`ve been searching for. You just simply can`t beat a Dodge product. Smith Chevrolet Cadillac is located in Fort Smith, AR. We are a full service dealership including New and Pre-Owned cars and trucks, service, parts, and body shop! Call or email our Internet Sales Team and let them tell you about our Market Based Pricing and our Internet specials. www.smithchevyland.com
Dodge Challenger for Sale
2013 dodge challenger srt-8(US $40,000.00)
2014 dodge challenger sxt(US $26,881.00)
2014 dodge challenger sxt(US $27,066.00)
2014 dodge challenger sxt(US $27,066.00)
2014 dodge challenger sxt(US $27,148.00)
2013 dodge challenger r/t(US $28,995.00)
Auto Services in Arkansas
Tint Pro & Accessories ★★★★★
Tim`s Auto Body ★★★★★
Swain`s Service Center ★★★★★
Seeburg Muffler & Brake ★★★★★
Seeburg Muffler & Brake ★★★★★
River City Motors II ★★★★★
Auto blog
Dodge launches 1 of 1 Viper configurator
Fri, Apr 17 2015Get comfortable because you might be spending a good chunk of time in front of the computer on this. The configurator for the 2015 Dodge Viper GTC 1 of 1 is now online, and it's a ton of fun to play around with. Mechanically, the GTC is just like every current Viper with a 645-horsepower, 8.4-liter V10. But for the special editions Dodge lets buyers tinker with practically everything aesthetic thing. For the exterior alone, the choices include some 8,000 available body colors, two stripe styles in innumerable shades, two hood designs and various brake caliper hues. Plus, there are 16 upholstery colors inside, and options like red seat belts and carbon fiber trim. Dodge reckons there are over 25 million possible combinations, and the models are available to customers on a first-come-first serve basis for each model year. Although, two people wanting identical cars seems pretty unlikely. The configurator is a beauty too. It makes all of these myriad options extremely easy to pick from, and there are even four resolution settings to see your creation in the best possible way. Prices for the GTC start at $94,995 and deliveries are set to start in the second quarter of the year. Although, even if you have no intention of buying one, specifying these custom coupes is still highly entertaining.
Stellantis reports surprising 2020 results, is 'off to a flying start'
Wed, Mar 3 2021MILAN — Low global car inventories and cost cuts should boost Stellantis's profit margins this year, though a shortage of semiconductors and investments in electric vehicles could weigh on results, the newly-formed automaker said on Wednesday. The forecast came as Stellantis, created by the January merger of Peugeot-maker PSA and Fiat Chrysler (FCA), reported better-than-expected results for 2020 that sent its shares up around 3% in morning trading. "Stellantis gets off to a flying start and is fully focused on achieving the full promised synergies (from the merger)," Chief Executive Carlos Tavares said in a statement. Stellantis is the world's fourth largest carmaker, with 14 brands including Fiat, Peugeot, Opel, Jeep, Ram and Maserati. It said 2021 results should be helped by three new high-margin Jeep vehicles in North America and a strong pricing environment there. The U.S. market has driven profits for years at FCA and starts off as the strongest part of Stellantis. The group's guidance assumes no more significant lockdowns caused by the global COVID-19 pandemic, which shuttered auto plants around the world last spring. Stellantis should also get a lift as its starts to implement a plan aimed at delivering over 5 billion euros a year in savings, without closing any plants. Tavares has also pledged not to cut jobs. But a pandemic-related global shortage of semiconductors, used for everything from maximizing engine fuel economy to driver-assistance features, could hurt business. Auto industry executives have said the shortage should ease by the second half of 2021. Stellantis said its "electrification offensive" could also weigh on results this year. Automakers are racing to develop electric vehicles to meet tighter CO2 emissions targets in Europe and this week Volvo joined a growing number of carmakers aiming for a fully-electric line-up by 2030. Stellantis plans to have fully-electric or hybrid versions of all of its vehicles available in Europe by 2025, broadly in line with plans at top rivals such as Volkswagen and Renault-Nissan, although Stellantis has further to go to meet that goal. The carmaker is targeting an adjusted operating profit margin of 5.5%-7.5% this year. That compares with a 5.3% aggregated margin last year: 4.3% at FCA and 7.1% at PSA excluding a controlling stake in parts maker Faurecia, which is set to be spun-off from Stellantis shortly.
Chrysler investing $20M in Toledo plant to support 9-speed auto production
Sun, 28 Apr 2013In 2011, Chrysler announced a $72-million investment in its Toledo Machining Plant to modernize production of the eight- and nine-speed torque-converters for automatic transmissions made there. That upgrade work won't be finished until Q3 of this year, but Chrysler has already announced a further $19.6-million investment to increase production capacity for the nine-speeders.
The extra units will be necessary because the nine-speed transmission they'll be mated to is going into three popular models: it will debut on the 2014 Jeep Cherokee, then go into the Chrysler 200 and Dodge Dart. The company predicted that this year alone it would sell 200,000 units equipped with the nine-speed tranny, and it is spending some $374 million in addition to the investment in Toledo to upgrade production capacity for it.
The work attached to this new investment won't begin until Q3 of 2014, and it will be finished by the end of that year. There's a press release below with all the details.